WageDecoder

Prevailing wage calculator

Pick the state and county where the work was performed, then the exact classification on the determination. Enter the hours you worked and the total you were paid per hour — wages plus any cash fringe. The calculator returns the determination's basic rate plus all listed supplements, and the difference.

It uses published determinations only: federal Davis-Bacon determinations from SAM.gov, California DIR 2026-2 general determinations, Washington L&I journey-level rates, and New York Article 8 county schedules. It does not estimate, average or infer a rate.

Select a county to load classifications.

Straight-time only. Overtime, shift differentials, apprentices, residential versus commercial schedules, and fringe-benefit credit rules can change the answer. Confirm the determination before relying on it.

Are you the contractor?

This page checks one worker at straight time. The full tool imports your payroll, checks every row against the determination, and exports the certified payroll — open the payroll check.

What the calculator does

What it does not do

Questions workers ask

Is my pay short if I get $25 an hour and the determination says $40?

At straight time, yes: the determination total is the minimum for that classification, and the difference is the shortfall. Cash fringe you received counts toward the total; fringe paid into a bona fide plan is handled separately. Enter the total you actually received per hour for a like-for-like comparison.

Why is the total higher than the basic rate?

The determination has a basic hourly rate plus supplements — health and welfare, pension, vacation and holiday, training and other employer payments. The total of those is what the contractor must pay per hour.

Can I use one county's rate on a job in another county?

No. Davis-Bacon and most state schedules are set by the county where the work is performed. Select the county of the project, not the office or the home address.

What if my classification is not in the list?

Then the determination may not list it under that name, or the project may be under a different schedule. Do not substitute a nearby class. Open the official determination linked on this page and read the classification there.

Does this work for a federal project and a state-funded project?

Federal projects use the Davis-Bacon determination. State projects use the state schedule — California DIR, Washington L&I or New York Article 8. If a project has both federal and state money, both may apply and the higher rate typically controls; check the contract and the awarding agency.

Sources: SAM.gov wage determinations, California DIR 2026-2, Washington L&I, New York DOL Article 8. Rates are refreshed by hand; confirm against the official document before you certify or file a claim.