Prevailing wage determination: from Davis-Bacon rules to payroll
Most “prevailing wage” pages explain the law. This one starts after you have the wage determination in hand: how to read it in the right order, where each number goes on the WH-347, and the four mistakes that get a payroll returned.
The short answer
A prevailing wage is a package: a basic hourly rate plus a fringe rate, set by the wage determination attached to your contract. Put the determination number and its modification in field 5 of the WH-347, put a listed classification on each worker row, show the base rate and fringe separately in columns 6A–6C, and multiply only the base rate for overtime.
“Prevailing wage” is the rate. “Davis-Bacon” is the federal law that requires it on federally funded or assisted construction. A state-funded job may be covered by a state prevailing-wage law instead, with a different form and a different clock — that is why the state pages exist.
What a wage determination actually contains
A federal general wage determination is not a single number. It is a document with a scope and a table. Read the scope first; a correct rate from the wrong scope is still the wrong rate.
| Part of the determination | What it tells you | Where it lands on the WH-347 |
|---|---|---|
| Determination number and modification | The exact version that controls the contract, e.g. “IL20260007 Mod 3” | Field 5 — copy both parts, not just the number |
| Counties covered | Which localities the rates apply to | Field 3 — the project location must be inside that list |
| Construction type | Building, heavy, highway or residential | No field of its own; it decides which table you read |
| Classification table | Trade titles and their rates | The classification column on each worker row |
| Basic hourly rate | The cash wage floor before fringe | Column 6A |
| Fringe benefit rate | The benefit component of the package | Columns 6B (plan credit) and 6C (cash in lieu) |
| Footnotes | Limits, special rates and scope notes for a classification | Read before you use the rate; they can change the answer |
Read it in this order
- Open the determination attached to the contract. Not the newest one on a rate lookup site. The contract's determination, including its modification, controls even if a later determination has higher rates.
- Check the county. Rates are published by locality. A determination that covers the right trade in the wrong county is not your determination.
- Check the construction type. Building, heavy, highway and residential tables can carry different rates for the same trade.
- Match the work, not the job title. Use a classification the determination lists and that describes the work actually performed. “Helper” or an invented title is a rejection cause even at a higher rate.
- Separate base from fringe. The package is base plus fringe. Overtime is 1.5× the base, not 1.5× the package.
- Read the footnotes for that classification. They can limit the scope, require a different rate for certain work, or explain a holiday/overtime premium.
Davis-Bacon Act requirements
The Davis-Bacon Act requires contractors and subcontractors on federally funded or federally assisted construction contracts above $2,000 to pay laborers and mechanics the locally prevailing wage and fringe benefits. The contract must include the Davis-Bacon clauses and the applicable wage determination. Payrolls are certified weekly, and the contractor must post the determination at the site.
The obligation is not limited to the prime: every subcontractor at every tier is covered, and the prime is responsible for its subcontractors' compliance.
Davis-Bacon fringe benefits
Fringe benefits are part of the prevailing wage package, not a bonus on top. A contractor may count contributions to a bona fide plan — health, pension, vacation, apprenticeship — against the fringe rate. If the plan credit is less than the required fringe, the difference is paid in cash to the worker.
Fringe is not included in the overtime multiplier. Overtime is 1.5× the basic hourly rate; the fringe obligation continues for the hours worked.
What is a prevailing wage rate sheet?
A rate sheet is the project-specific schedule issued by the awarding agency or the state labor department. It lists the classifications, the basic hourly rate and the fringe rate for the project's locality. It is not the same as a general wage determination: the rate sheet is the version incorporated into the contract, and it may include classifications or footnotes that the general determination does not.
Current prevailing wage rates: where to look
Use the rate source named in the contract, not a search result. For federal work, the determination is attached to the contract and published through SAM.gov. For state work, use the state labor agency's rate lookup and the project rate sheet.
- Federal: the contract's wage determination, with its modification number. SAM.gov publishes determinations; the DOL Wage and Hour Division publishes the rules.
- California: DIR prevailing wage determinations by craft and county.
- Illinois: IDOL county rates, republished annually.
- Massachusetts: a project-specific DLS rate schedule.
- Washington: L&I rates by county and trade, published twice a year.
- Oregon, Pennsylvania, New Jersey, Texas, Florida: state pages with the agency and the form.
Do not copy a rate table from a blog. Rates change, and a stale number is a shortfall.
Mapping the determination onto the WH-347
The form has a fixed field order, and reviewers read it in that order. This is the mapping that matters:
| WH-347 field | What to enter | Common error |
|---|---|---|
| 5 · Wage determination no. | Number and modification, exactly as printed | “IL20260007” with no “Mod 3” |
| Worker classification | A title listed in the determination for that county and construction type | A company title or a trade the determination does not list |
| 6A · Straight-time rate | The basic hourly rate actually paid | Putting the base-plus-fringe package in 6A |
| 6B · Fringe credit | The hourly credit for bona fide plan contributions | Claiming a plan the worker is not in |
| 6C · Fringe paid in cash | Fringe paid as cash instead of a plan | Checking the box without paying the cash |
| 7A · Gross this project | Straight time plus overtime for this project | Including work from another job |
| 7B · Gross all work | Total gross for the week across all work | Copying 7A when the worker also worked elsewhere |
The full field-by-field walkthrough is in the WH-347 guide. The point here is that every number on the form traces back to one line of the determination.
The four ways a payroll gets returned
- The modification is missing. A determination number without its modification does not identify the rates used. The reviewer cannot tell whether you applied the right version.
- The classification is not in the determination. A higher rate does not fix a classification the determination does not include. Use the listed title or get a determination for the classification.
- The rate comes from a newer determination. Paying more is not automatically compliant if the contract incorporated an older modification. The contract's version controls.
- Fringe is missing or double-counted. A $30 cash rate against a $30 base plus $10 fringe is a $10-an-hour shortfall. A package stuffed into column 6A while column 6B also claims a credit is a double count.
Two more, less common but fatal: using the federal form on a state-funded job that requires its own form, and signing page 2 without dating it.
Federal and state prevailing wage are not the same job
On a project with federal money, Davis-Bacon applies and the WH-347 is the usual weekly form. On a state-funded project, a state law may apply instead — Oregon uses WH-38, Pennsylvania uses LLC-25, New Jersey uses MW-562, Illinois uses a monthly Certified Transcript of Payroll. Texas and Florida are different again: Texas sets rates through the awarding body without a state form, and Florida has no state prevailing-wage law at all.
If both laws apply, you must satisfy both: pay the higher requirement and file the paperwork each law requires. Check the state page before you assume the federal form is enough.
Questions
What is the difference between prevailing wage and Davis-Bacon?
Davis-Bacon is the federal law requiring prevailing wages on federally funded or assisted construction. “Prevailing wage” is the rate itself. Many states run their own law, with a different form, threshold and filing clock.
Where do I find the wage determination for my contract?
It is attached to the contract or incorporated by reference, normally with a number and a modification. Use that document, not a newer determination from a rate lookup site.
Does the wage determination include fringe benefits?
Yes. Federal determinations list a basic hourly rate and a fringe rate. Together they are the minimum package. Overtime is 1.5× the basic rate; fringe is accounted for separately.
What if my worker does two classifications?
Use one row per worker per classification and keep the same entry number on both rows. Track the hours in each classification, or pay the highest applicable rate for all hours where the determination permits it.
Can I use a state rate on a federal job?
Only if it meets or exceeds the federal determination and the contract accepts it. Where both laws apply, satisfy both — usually the higher rate plus each law's paperwork.
What is the difference between a wage determination and a rate sheet?
A wage determination is the published federal or state schedule; a rate sheet is the project-specific version the awarding agency issues and incorporates into the contract. The rate sheet controls for that job, even if the published determination later changes.
Where can I find current prevailing wage rates?
Use the source named in the contract. Federal work uses the determination attached to the contract and published on SAM.gov; state work uses the state labor agency's lookup and the project rate sheet. Do not rely on a copied rate table.
Turn the determination into a checked payroll
Enter the determination number and modification once, then let WageDecoder check the classification, fringe and overtime before it writes the official WH-347. Free, no account, nothing uploaded.