Certified payroll in Connecticut
Connecticut runs its own prevailing-wage law and its own form. On a covered public works job the payroll goes to the contracting agency monthly on WWS-CPI, not weekly on a state portal.
The short answer
Covered public works in Connecticut file the WWS-CPI payroll certification monthly with the contracting agency. New construction is covered at $1,000,000 or more; remodeling or repair at $100,000 or more. The federal WH-347 does not replace the state form on a state-covered job.
Form and filing
The package is the Payroll Certification for Public Works Projects plus the Certified Statement of Compliance. CTDOL lets you complete the form online, but the filing still goes to the contracting agency, not to a state payroll portal.
When it is due
CGS § 31-53 and CTDOL require certified payrolls with a statement of compliance monthly to the contracting agency. This is a state-law clock, separate from the federal weekly clock that applies when federal money is in the job.
Coverage threshold
Measured on: Combined total cost of all work on the public works project, not the value of one subcontract.
The thresholds are in CGS § 31-53(h). The statute also covers off-site fabrication added by Public Act 25-168, effective July 1, 2025. Confirm the project cost basis with the contracting agency before bidding.
Overtime and fringe
Connecticut overtime is after 40 hours in a week. The project rate schedule can carry additional overtime and fringe notes; federal Davis-Bacon work also carries the federal weekly overtime rule.
If the contractor is not required to contribute to an employee welfare fund, CGS § 31-53(a) requires the equivalent amount to be paid as part of wages on each payday.
Wage rates
CTDOL issues a project-specific prevailing wage schedule to the contracting agency before bid. The schedule is based on local collective-bargaining rates and, where no local agreement exists, on federal Davis-Bacon rates. The schedule included in the bid documents controls the project.
Penalties for not filing or underpaying
- A violation can draw a $5,000 fine for each offense, termination of the contractor's right to proceed, and withholding of contract payments. Conn. Gen. Stat. § 31-53(b)
- The Labor Commissioner maintains a debarment list and may refer a contractor for debarment for up to three years after qualifying violations or settlements. Conn. Gen. Stat. § 31-53a
How it is filed
File with the public body that awarded the contract. CTDOL does not run a statewide certified-payroll portal; the online WWS-CPI is a fillable form, not a state submission system.
Questions
Does Connecticut require certified payroll?
Yes. On a covered public works project, the contractor and each subcontractor file the WWS-CPI payroll certification with a statement of compliance monthly with the contracting agency.
What form do I file in Connecticut?
Form WWS-CPI, the Certified Payroll Form for Public Works Projects. The federal WH-347 does not replace it on a state-covered job.
When is Connecticut certified payroll due?
Monthly to the contracting agency. Connecticut does not use a weekly state payroll clock; a federal funded portion of the job still carries the federal weekly rule.
What is the Connecticut prevailing wage threshold?
New construction is covered at $1,000,000 or more; remodeling, alteration or repair at $100,000 or more. The test is the combined total cost of all work on the project.
How is overtime calculated on Connecticut prevailing wage work?
After 40 hours in a week at 1.5 times the base rate. Fringe is paid at straight time. Check the project rate schedule for any classification-specific notes.
Sources
- CTDOL — Certified Payroll Form WWS-CPI checked 2026-11-21
- CTDOL — Prevailing Wage Information checked 2026-11-21
- Connecticut General Statutes § 31-53 checked 2026-11-21
- CTDOL — Wage and Workplace Standards forms checked 2026-11-21
Get the monthly payroll right before it goes on WWS-CPI
WageDecoder checks hours, overtime, classifications and fringe against the project rates and produces the federal WH-347. Use the checked figures on WWS-CPI; the state form itself goes to the contracting agency.