The Davis-Bacon Act, in practice
The Davis-Bacon Act requires contractors on direct federal construction contracts above $2,000 to pay the prevailing wage and fringe benefits listed in a wage determination attached to the contract. The contractor and every subcontractor certify their payrolls weekly. The part most summaries miss: the contract's determination — not today's newest rate — sets the obligation.
What the Act covers
The Davis-Bacon Act covers direct federal construction contracts over $2,000 for building, alteration or repair. “Construction” includes demolition, painting, reconstruction and the installation of equipment permanently attached to the work. The Act does not cover manufacturing done off-site, ordinary maintenance, or every contract that happens to touch federal property.
Federally assisted work — a highway funded through a federal program, a housing project with federal money, a transit grant — is usually covered by a Related Act, not by Davis-Bacon itself. The Related Acts have their own thresholds and coverage tests. The contract documents should name the applicable Act and incorporate the wage determination. If they do not, ask the contracting officer before the first payroll.
State and local public work is separate. A California DIR job, a New York Article 8 job or a Washington L&I job uses the state schedule even when federal money is also involved; on a project covered by both, both laws can apply and the higher rate usually controls.
Who must be paid
Laborers, mechanics and apprentices employed directly on the site of the work are covered. The obligation runs through every tier: the prime contractor is responsible for its subcontractors' compliance, and a subcontractor cannot be pushed outside the Act by contract language.
- Working foremen and supervisors are covered for the time they spend on covered labor.
- Registered apprentices may be paid the apprentice rate for their period, within the ratio stated in the determination. An apprentice who is not registered must be paid the journeyman rate.
- Off-site employees are generally not covered merely because they fabricate material for the project; delivery and hauling are covered only in the circumstances the determination or contract states.
- Independent contractors do not escape coverage by being labeled as such; the working relationship and the site work control.
How the wage determination is built
The U.S. Department of Labor's Wage and Hour Division issues wage determinations by construction type and county. A determination lists classifications, a basic hourly rate, a fringe benefit rate, and the effective date and modification number. The contracting agency incorporates the determination into the contract, usually before bid.
- Find the determination named in the contract. The number and modification are usually in the bid documents or the contract's labor standards provisions.
- Match the classification to the work. The trade title must appear in the determination. If the work is not listed, the contracting officer can request a conformance; the contractor does not invent a rate.
- Add base and fringe. The required package is the basic hourly rate plus the fringe rate. Overtime multiplies the basic rate, not the fringe.
- Check the effective date. The determination attached to the contract governs for the life of the contract, even if a newer determination is published later.
Look up a federal determination by state, county and construction type →
Certified payroll: the weekly WH-347
Each contractor and subcontractor must submit a weekly certified payroll to the contracting agency. The common form is the WH-347, with the Statement of Compliance on the back. The payroll shows each worker's name, address, social security number (or a permitted identifier), classification, hourly rate, daily and weekly hours, deductions, and the fringe credit claimed.
The certification is made under penalty of perjury. A payroll that is complete arithmetic but wrong on classification, fringe or overtime is still a false certification. The contract can require electronic submission through a system such as SAM.gov, LCPtracker or the agency's own portal; the WH-347 is the content, not always the channel.
Fringe, cash in lieu and overtime
| Item | Federal rule |
|---|---|
| Base rate | The basic hourly rate in the determination; paid in cash. |
| Fringe | Contributions to a bona fide plan — health, pension, vacation, apprenticeship — can be credited. If the credit is less than the required fringe, the difference is paid in cash. |
| Overtime | After 40 hours in a workweek, 1.5× the basic rate. The fringe obligation continues for the overtime hours, but the fringe rate is not multiplied. |
| Apprentices | Only registered apprentices may be paid the apprentice rate, and only within the ratio in the determination. |
| Deductions | Only deductions permitted by law or authorized by the worker; the payroll must show them. |
The common failure is not a missing rate — it is a rate that looks right because the fringe was left out, or an overtime premium calculated on base plus fringe. Both underpay the worker and both show up on the WH-347.
Enforcement and penalties
The contracting agency can withhold contract funds to cover underpayments and can suspend or terminate the contract. A contractor found to have violated the Act can be debarred from federal contracts for up to three years. Willful falsification of payroll records and kickbacks carry separate civil and criminal penalties. The Davis-Bacon Act also protects workers who report violations.
Practical exposure starts before the first payroll: the wrong determination, a missing classification, an apprentice ratio or a fringe credit that cannot be documented. Fixing those before the payroll is signed is cheaper than responding to a withholding notice.
Questions
Does the Davis-Bacon Act apply to every federal contract?
No. The Act itself covers direct federal construction contracts above $2,000. Federal-aid or federally assisted work is covered by separate Related Acts, each with its own coverage and threshold. The contract documents decide which Act and which wage determination apply.
What is the Davis-Bacon threshold?
Direct federal construction contracts over $2,000 are covered. The Related Acts have their own thresholds; do not assume the $2,000 figure travels to every federally assisted program.
Is certified payroll required every week?
Yes for Davis-Bacon and Related Act construction. The contractor and each subcontractor submit a weekly certified payroll, commonly on the WH-347, to the contracting agency. The exact submission channel is set by the contract.
Can fringe benefits count toward the Davis-Bacon wage?
Yes. The wage determination states a basic hourly rate and a fringe benefit rate. Contributions to a bona fide benefit plan can be credited against the fringe portion; any shortfall must be paid in cash to the worker.
What happens if a contractor underpays?
The contracting agency can withhold contract funds to pay the difference, and the contractor can be debarred from federal contracts for up to three years. Willful falsification or kickbacks carry separate civil and criminal exposure.
Sources
- U.S. DOL Wage and Hour Division — Government Contracts, Construction checked 2026-11-20
- U.S. DOL — Davis-Bacon and Related Acts checked 2026-11-20
- 29 CFR Part 5 — Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction checked 2026-11-20
- SAM.gov — Wage Determinations checked 2026-11-20
From the determination to a checked WH-347
Look up the federal rate for the county, check one worker's base plus fringe, then build the weekly payroll. Free account to download; projects and weeks are saved to your account.