Wage determination CA20260005, modification 2
Effective May 20, 2026. Covers 4 California counties for Building work, with 133 rate lines. Base rates run $9.54–$31.63 and fringe $0.00–$12.53 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in California are governed by the state's own schedule, which is a separate set of rates — see California rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | CA20260005 |
| Modification | 2 |
| Effective | May 20, 2026 |
| Construction types | Building |
| Counties | 4 |
| Rate lines | 133 |
| Other California determinations | 28 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Truck Drivers | $19.14 | $7.69 | $26.83 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.99 | $7.69 | $26.68 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.84 | $7.69 | $26.53 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.79 | $7.69 | $26.48 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.69 | $7.69 | $26.38 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.54 | $7.69 | $26.23 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.48 | $7.69 | $26.17 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.47 | $7.69 | $26.16 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.45 | $7.69 | $26.14 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.44 | $7.69 | $26.13 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.40 | $7.69 | $26.09 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.38 | $7.69 | $26.07 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.35 | $7.69 | $26.04 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.34 | $7.69 | $26.03 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.25 | $7.69 | $25.94 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.24 | $7.69 | $25.93 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.21 | $7.69 | $25.90 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.16 | $7.69 | $25.85 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.15 | $7.69 | $25.84 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.14 | $7.69 | $25.83 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.12 | $7.69 | $25.81 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.11 | $7.69 | $25.80 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.10 | $7.69 | $25.79 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.07 | $7.69 | $25.76 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.06 | $7.69 | $25.75 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.05 | $7.69 | $25.74 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.01 | $7.69 | $25.70 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $18.00 | $7.69 | $25.69 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.98 | $7.69 | $25.67 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.97 | $7.69 | $25.66 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.95 | $7.69 | $25.64 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.93 | $7.69 | $25.62 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.92 | $7.69 | $25.61 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.91 | $7.69 | $25.60 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.90 | $7.69 | $25.59 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.88 | $7.69 | $25.57 | 06/01/1986 | SUCA1986-001 |
| Truck Drivers | $17.80 | $7.69 | $25.49 | 06/01/1986 | SUCA1986-001 |
| Tile Setter | $23.35 | $4.48 | $27.83 | 06/01/1986 | SUCA1986-001 |
| Tile Finisher | $16.17 | $4.98 | $21.15 | 06/01/1986 | SUCA1986-001 |
| Terrazzo Finisher | $16.99 | $4.18 | $21.17 | 06/01/1986 | SUCA1986-001 |
| Terrazzo Finisher | $16.72 | $3.95 | $20.67 | 06/01/1986 | SUCA1986-001 |
| Terrazzo Finisher | $17.69 | $4.18 | $21.87 | 06/01/1986 | SUCA1986-001 |
| Terrazzo Finisher | $17.42 | $3.95 | $21.37 | 06/01/1986 | SUCA1986-001 |
| Sprinkler Fitter | $24.18 | $3.75 | $27.93 | 06/01/1986 | SUCA1986-001 |
| Sheet Metal Worker | $27.17 | $7.17 | $34.34 | 06/01/1986 | SUCA1986-001 |
| Sheet Metal Worker | $18.65 | $4.85 | $23.50 | 06/01/1986 | SUCA1986-001 |
| Roofers | $17.65 | $7.17 | $24.82 | 06/01/1986 | SUCA1986-001 |
| Roofers | $17.90 | $7.17 | $25.07 | 06/01/1986 | SUCA1986-001 |
| Roofers | $18.30 | $3.84 | $22.14 | 06/01/1986 | SUCA1986-001 |
| Roofers | $19.65 | $7.17 | $26.82 | 06/01/1986 | SUCA1986-001 |
| Roofer | $12.00 | $2.00 | $14.00 | 06/01/1986 | SUCA1986-001 |
| Roofer | $16.30 | $3.84 | $20.14 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $17.31 | $9.70 | $27.01 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $18.15 | $9.70 | $27.85 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $18.99 | $9.70 | $28.69 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $19.97 | $9.70 | $29.67 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $20.93 | $9.70 | $30.63 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $21.96 | $9.70 | $31.66 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $23.04 | $9.70 | $32.74 | 06/01/1986 | SUCA1986-001 |
| Power Equipment Operators | $24.17 | $9.70 | $33.87 | 06/01/1986 | SUCA1986-001 |
| Plumber And Steamfitter | $29.84 | $12.53 | $42.37 | 06/01/1986 | SUCA1986-001 |
| Plumber And Steamfitter | $16.47 | $9.45 | $25.92 | 06/01/1986 | SUCA1986-001 |
| Plasterer | $17.73 | $8.22 | $25.95 | 06/01/1986 | SUCA1986-001 |
| Parking Lot Striping/highway Marking | $14.54 | $3.52 | $18.06 | 06/01/1986 | SUCA1986-001 |
| Parking Lot Striping/highway Marking | $12.88 | $3.52 | $16.40 | 06/01/1986 | SUCA1986-001 |
| Parking Lot Striping/highway Marking | $16.83 | $3.52 | $20.35 | 06/01/1986 | SUCA1986-001 |
| Parking Lot Striping/highway Marking | $14.31 | $3.52 | $17.83 | 06/01/1986 | SUCA1986-001 |
| Parking Lot Striping/highway Marking | $15.99 | $3.52 | $19.51 | 06/01/1986 | SUCA1986-001 |
| Parking Lot Striping/highway Marking | $16.83 | $3.52 | $20.35 | 06/01/1986 | SUCA1986-001 |
| Painters | $21.28 | $4.68 | $25.96 | 06/01/1986 | SUCA1986-001 |
| Painters | $12.76 | $2.43 | $15.19 | 06/01/1986 | SUCA1986-001 |
| Painters | $21.78 | $4.68 | $26.46 | 06/01/1986 | SUCA1986-001 |
| Painters | $12.51 | $2.43 | $14.94 | 06/01/1986 | SUCA1986-001 |
| Painters | $20.78 | $4.68 | $25.46 | 06/01/1986 | SUCA1986-001 |
| Marble Finisher | $15.22 | $3.92 | $19.14 | 06/01/1986 | SUCA1986-001 |
| Marble Finisher | $13.92 | $3.67 | $17.59 | 06/01/1986 | SUCA1986-001 |
| Marble And Terrazzo Setter | $21.09 | $4.13 | $25.22 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Line Technician | $22.85 | $5.43 | $28.28 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Line Technician | $17.41 | $6.03 | $23.44 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Heavy Equipment Operator | $18.22 | $5.29 | $23.51 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Heavy Equipment Operator | $15.67 | $5.96 | $21.63 | 06/01/1986 | SUCA1986-001 |
| Line Construction | $13.23 | $3.71 | $16.94 | 06/01/1986 | SUCA1986-001 |
| Line Construction | $14.07 | $3.74 | $17.81 | 06/01/1986 | SUCA1986-001 |
| Line Construction | $14.07 | $3.74 | $17.81 | 06/01/1986 | SUCA1986-001 |
| Line Construction | $16.08 | $3.81 | $19.89 | 06/01/1986 | SUCA1986-001 |
| Line Construction | $15.35 | $3.79 | $19.14 | 06/01/1986 | SUCA1986-001 |
| Line Construction | $18.65 | $3.90 | $22.55 | 06/01/1986 | SUCA1986-001 |
| Line Construction | $20.63 | $3.97 | $24.60 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Ground Person | $18.28 | $5.29 | $23.57 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Ground Person | $13.93 | $5.89 | $19.82 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Cable Splicer | $25.14 | $5.49 | $30.63 | 06/01/1986 | SUCA1986-001 |
| Line Construction, Cable Splicer | $18.80 | $6.08 | $24.88 | 06/01/1986 | SUCA1986-001 |
| Landscape Laborer | $16.36 | $5.96 | $22.32 | 06/01/1986 | SUCA1986-001 |
| Landscape Laborer | $10.05 | $5.96 | $16.01 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $16.61 | $5.96 | $22.57 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $10.05 | $5.96 | $16.01 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $16.36 | $5.96 | $22.32 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $16.46 | $5.96 | $22.42 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $17.19 | $5.96 | $23.15 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $17.16 | $5.96 | $23.12 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $16.86 | $5.96 | $22.82 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $16.66 | $5.96 | $22.62 | 06/01/1986 | SUCA1986-001 |
| Laborers per day | $16.83 | $5.96 | $22.79 | 06/01/1986 | SUCA1986-001 |
| Laborer | $17.36 | $5.96 | $23.32 | 06/01/1986 | SUCA1986-001 |
| Laborer | $16.48 | $5.96 | $22.44 | 06/01/1986 | SUCA1986-001 |
| Laborer | $17.07 | $5.96 | $23.03 | 06/01/1986 | SUCA1986-001 |
| Laborer | $16.36 | $5.96 | $22.32 | 06/01/1986 | SUCA1986-001 |
| Laborer | $16.46 | $5.96 | $22.42 | 06/01/1986 | SUCA1986-001 |
| Laborer | $16.61 | $5.96 | $22.57 | 06/01/1986 | SUCA1986-001 |
| Ironworkers | $19.15 | $8.93 | $28.08 | 06/01/1986 | SUCA1986-001 |
| Ironworkers | $18.26 | $8.93 | $27.19 | 06/01/1986 | SUCA1986-001 |
| Insulator/asbestos Worker | $21.60 | $5.61 | $27.21 | 06/01/1986 | SUCA1986-001 |
| Glazier | $16.31 | $6.19 | $22.50 | 06/01/1986 | SUCA1986-001 |
| Floor Layer | $18.73 | $0.00 | $18.73 | 06/01/1986 | SUCA1986-001 |
| Floor Layer | $14.19 | $4.41 | $18.60 | 06/01/1986 | SUCA1986-001 |
| Elevator Mechanic | $31.06 | $3.87 | $34.93 | 06/01/1986 | SUCA1986-001 |
| Electricians | $18.80 | $6.09 | $24.89 | 06/01/1986 | SUCA1986-001 |
| Electricians | $13.62 | $1.31 | $14.93 | 06/01/1986 | SUCA1986-001 |
| Electrician | $17.41 | $6.05 | $23.46 | 06/01/1986 | SUCA1986-001 |
| Drywall Installers/lathers | $9.54 | $7.40 | $16.94 | 06/01/1986 | SUCA1986-001 |
| Drywall Installers/lathers | $19.08 | $7.40 | $26.48 | 06/01/1986 | SUCA1986-001 |
| Diver | $20.38 | $6.16 | $26.54 | 06/01/1986 | SUCA1986-001 |
| Diver | $31.63 | $9.88 | $41.51 | 06/01/1986 | SUCA1986-001 |
| Cement Masons | $17.91 | $6.18 | $24.09 | 06/01/1986 | SUCA1986-001 |
| Cement Masons | $18.16 | $6.18 | $24.34 | 06/01/1986 | SUCA1986-001 |
| Carpenters | $21.21 | $6.92 | $28.13 | 06/01/1986 | SUCA1986-001 |
| Carpenters | $19.38 | $9.88 | $29.26 | 06/01/1986 | SUCA1986-001 |
| Carpenters | $19.73 | $8.20 | $27.93 | 06/01/1986 | SUCA1986-001 |
| Carpenters | $19.23 | $6.96 | $26.19 | 06/01/1986 | SUCA1986-001 |
| Carpenter | $19.08 | $6.92 | $26.00 | 06/01/1986 | SUCA1986-001 |
| Bricklayer, Stonemason | $22.45 | $8.60 | $31.05 | 06/01/1986 | SUCA1986-001 |
| Brick Tender | $18.54 | $3.86 | $22.40 | 06/01/1986 | SUCA1986-001 |
| Boilermaker | $21.60 | $4.25 | $25.85 | 06/01/1986 | SUCA1986-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a daily eight-hour test in addition to the weekly forty.
The field-by-field mapping is in the WH-347 guide.