Prevailing wage rates in California
Every active federal Davis-Bacon determination that covers California: 28 determinations, 58 counties, 3385 rate lines, newest effective Oct 15, 2026. Pick your county below, or read the rate ranges by trade.
What this page covers
State-funded work is separate. California public works are governed by California Labor Code §§ 1720-1861 (Public Works) and administered by Department of Industrial Relations; Division of Labor Standards Enforcement, covering contracts above $1,000. The state form is the Certified Payroll Record (DIR eCPR). A federal determination does not replace the state rate, and on a project covered by both laws you must satisfy both — usually the higher rate plus each law's paperwork.
State rules, the filing clock and the penalty: California certified payroll.
Counties covered
Each row is a California county that appears in an active federal determination. The count is the number of determinations naming that county — usually one per construction type.
| County | Determinations | Construction types | Newest effective | Look up |
|---|---|---|---|---|
| Alameda | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Alpine | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Amador | 3 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Butte | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Calaveras | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Colusa | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Contra Costa | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Del Norte | 3 | Heavy, Highway, Building, Residential | Sep 3, 2026 | Rates → |
| El Dorado | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Fresno | 2 | Residential, Building, Heavy, Highway | Sep 17, 2026 | Rates → |
| Glenn | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Humboldt | 3 | Heavy, Highway, Building, Residential | Sep 3, 2026 | Rates → |
| Imperial | 2 | Building, Heavy, Highway, Residential | Oct 15, 2026 | Rates → |
| Inyo | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Kern | 2 | Residential, Building, Heavy, Highway | Jul 30, 2026 | Rates → |
| Kings | 2 | Residential, Building, Heavy, Highway | Sep 17, 2026 | Rates → |
| Lake | 3 | Heavy, Highway, Building, Residential | Sep 3, 2026 | Rates → |
| Lassen | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Los Angeles | 2 | Residential, Building, Heavy, Highway | Oct 15, 2026 | Rates → |
| Madera | 2 | Residential, Building, Heavy, Highway | Sep 17, 2026 | Rates → |
| Marin | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Mariposa | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Mendocino | 3 | Heavy, Highway, Building, Residential | Sep 3, 2026 | Rates → |
| Merced | 2 | Residential, Building, Heavy, Highway | Sep 17, 2026 | Rates → |
| Modoc | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Mono | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Monterey | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Napa | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Nevada | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Orange | 2 | Residential, Building, Heavy, Highway | Oct 15, 2026 | Rates → |
| Placer | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Plumas | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Riverside | 2 | Residential, Building, Heavy, Highway | Oct 15, 2026 | Rates → |
| Sacramento | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| San Benito | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| San Bernardino | 2 | Residential, Building, Heavy, Highway | Oct 15, 2026 | Rates → |
| San Diego | 1 | Building, Heavy, Highway, Residential | May 18, 2026 | Rates → |
| San Francisco | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| San Joaquin | 2 | Residential, Building, Heavy, Highway | Sep 17, 2026 | Rates → |
| San Luis Obispo | 2 | Building, Heavy, Highway, Residential | Oct 15, 2026 | Rates → |
| San Mateo | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Santa Barbara | 2 | Building, Heavy, Highway, Residential | Oct 15, 2026 | Rates → |
| Santa Clara | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Santa Cruz | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Shasta | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Sierra | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Siskiyou | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Solano | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Sonoma | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Stanislaus | 2 | Residential, Building, Heavy, Highway | Sep 17, 2026 | Rates → |
| Sutter | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Tehama | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Trinity | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Tulare | 3 | Residential, Building, Heavy, Highway | Sep 3, 2026 | Rates → |
| Tuolumne | 2 | Building, Heavy, Highway, Residential | Sep 17, 2026 | Rates → |
| Ventura | 2 | Building, Heavy, Highway, Residential | Oct 15, 2026 | Rates → |
| Yolo | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
| Yuba | 2 | Building, Heavy, Highway, Residential | Sep 3, 2026 | Rates → |
Rates by trade and construction type
These are the ranges across every California county in the current determinations. A range means the same classification carries different rates in different counties, or the determination lists regional sub-rates — the exact figure for a job comes from the determination that names that county.
| Classification | Type | Basic hourly rate | Fringe | Rate lines |
|---|---|---|---|---|
| Asbestos Removal Laborer | Building | $46.48 | $25.93 | 10 |
| Asbestos Removal Laborer | Heavy | $46.48 | $25.93 | 10 |
| Asbestos Removal Laborer | Highway | $46.48 | $25.93 | 10 |
| Asbestos Removal Laborer | Residential | $46.48 | $25.93 | 2 |
| Asbestos Removal Worker/hazardous Material Handler | Building | $23.52 – $44.73 | $11.40 – $13.37 | 14 |
| Asbestos Removal Worker/hazardous Material Handler | Heavy | $23.52 – $44.73 | $11.40 – $13.37 | 16 |
| Asbestos Removal Worker/hazardous Material Handler | Highway | $23.52 – $44.73 | $11.40 – $13.37 | 16 |
| Asbestos Removal Worker/hazardous Material Handler | Residential | $23.52 – $36.53 | $9.27 – $13.37 | 4 |
| Asbestos Workers/insulator | Building | $56.32 – $84.76 | $25.07 – $26.52 | 15 |
| Asbestos Workers/insulator | Heavy | $56.32 – $84.76 | $25.07 – $26.52 | 18 |
| Asbestos Workers/insulator | Highway | $56.32 – $84.76 | $25.07 – $26.52 | 18 |
| Asbestos Workers/insulator | Residential | $56.32 – $84.76 | $25.07 – $26.52 | 5 |
| Boilermaker | Building | $21.60 – $51.98 | $4.25 – $42.11 | 14 |
| Boilermaker | Heavy | $45.60 – $51.98 | $38.99 – $42.11 | 13 |
| Boilermaker | Highway | $45.60 – $51.98 | $38.99 – $42.11 | 13 |
| Boilermaker | Residential | $51.98 | $42.11 | 1 |
| Boilermaker - Blacksmith | Building | $17.05 – $19.25 | $4.00 | 2 |
| Boilermaker Area Within A 25 Mile Radius Of City Of Santa Maria | Building | $51.98 | $42.11 | 1 |
| Boilermaker Area Within A 25 Mile Radius Of City Of Santa Maria | Heavy | $51.98 | $42.11 | 1 |
| Boilermaker Area Within A 25 Mile Radius Of City Of Santa Maria | Highway | $51.98 | $42.11 | 1 |
| Boilermaker Remainder Of County Outside A 25 Mile Radius Of… | Building | $45.60 | $38.99 | 1 |
| Boilermaker Remainder Of County Outside A 25 Mile Radius Of… | Heavy | $45.60 | $38.99 | 1 |
| Boilermaker Remainder Of County Outside A 25 Mile Radius Of… | Highway | $45.60 | $38.99 | 1 |
| Brick Tender | Building | $15.80 – $42.60 | $3.46 – $22.13 | 12 |
| Brick Tender | Heavy | $42.60 | $22.13 | 10 |
| Brick Tender | Highway | $42.60 | $22.13 | 10 |
| Brick Tender | Residential | $11.00 – $42.60 | $0.96 – $27.45 | 9 |
| Brick Tender. Footnotes day | Building | $37.05 | $27.45 | 2 |
| Brick Tender. Footnotes day | Heavy | $37.05 | $27.45 | 2 |
| Brick Tender. Footnotes day | Highway | $37.05 | $27.45 | 2 |
| Bricklayer | Building | $15.18 – $58.81 | $0.00 – $28.50 | 18 |
| Bricklayer | Heavy | $45.53 – $58.81 | $19.02 – $28.50 | 18 |
| Bricklayer | Highway | $45.53 – $58.81 | $19.02 – $28.50 | 18 |
| Bricklayer | Residential | $17.00 – $58.81 | $1.12 – $28.50 | 12 |
| Bricklayer Specialty Pay | Heavy | $57.02 | $28.50 | 1 |
| Bricklayer Specialty Pay | Highway | $57.02 | $28.50 | 1 |
| Bricklayer, Stonemason | Building | $17.57 – $22.45 | $4.04 – $8.60 | 2 |
| Cable Splicer | Building | $59.34 – $104.68 | $22.06 – $51.29 | 8 |
| Cable Splicer | Heavy | $59.34 – $104.68 | $22.06 – $51.29 | 8 |
| Cable Splicer | Highway | $59.34 – $104.68 | $22.06 – $51.29 | 8 |
| Cable Splicer | Residential | $74.54 – $87.40 | $36.09 – $49.41 | 2 |
| Cable Splicer All Work Within 32 Road Miles Or Less From The… | Residential | $58.40 | $31.72 | 1 |
| Carpenter | Building | $13.36 – $52.80 | $4.24 – $32.41 | 77 |
| Carpenter | Heavy | $24.16 – $52.80 | $15.76 – $32.41 | 74 |
| Carpenter | Highway | $24.16 – $52.80 | $15.76 – $32.41 | 74 |
| Carpenter | Residential | $7.25 – $52.80 | $0.00 – $32.41 | 18 |
| Carpenter, Insulation Installer | Residential | $25.66 | $15.96 | 1 |
| Carpenters | Building | $18.73 – $60.54 | $6.46 – $35.11 | 79 |
| Carpenters | Heavy | $45.42 – $60.54 | $30.82 – $35.11 | 80 |
| Carpenters | Highway | $45.42 – $60.54 | $30.82 – $35.11 | 80 |
| Carpenters | Residential | $48.97 – $60.54 | $30.82 – $35.11 | 48 |
| Cement Mason/concrete Finisher | Building | $26.34 – $47.70 | $19.77 – $27.07 | 15 |
| Cement Mason/concrete Finisher | Heavy | $26.34 – $47.70 | $19.77 – $27.07 | 16 |
| Cement Mason/concrete Finisher | Highway | $26.34 – $47.70 | $19.77 – $27.07 | 16 |
| Cement Mason/concrete Finisher | Residential | $8.50 – $47.70 | $0.00 – $27.07 | 15 |
| Cement Masons | Building | $16.91 – $18.16 | $6.18 | 4 |
| Communications System | Building | $40.00 – $55.90 | $17.49 – $28.21 | 20 |
| Communications System | Heavy | $40.00 – $55.90 | $17.49 – $28.21 | 20 |
| Communications System | Highway | $40.00 – $55.90 | $17.49 – $28.21 | 20 |
| Communications System | Residential | $46.47 – $49.73 | $17.49 – $19.22 | 4 |
| Communications System Installer Communications And Systems Work | Residential | $45.23 | $20.47 | 1 |
| Diver day | Building | $20.38 – $901.92 | $6.16 – $34.69 | 50 |
| Diver day | Heavy | $54.10 – $901.92 | $26.18 – $34.69 | 60 |
| Diver day | Highway | $54.10 – $901.92 | $26.18 – $34.69 | 60 |
| Diver day | Residential | $418.96 – $901.92 | $26.18 | 4 |
| Dredging | Building | $51.23 – $62.61 | $39.55 | 16 |
| Dredging | Heavy | $51.23 – $62.61 | $39.55 | 24 |
| Dredging | Highway | $51.23 – $62.61 | $39.55 | 24 |
| Drywall | Building | $21.45 – $52.24 | $8.62 – $27.09 | 24 |
| Drywall | Heavy | $21.45 – $52.24 | $8.62 – $27.09 | 24 |
| Drywall | Highway | $21.45 – $52.24 | $8.62 – $27.09 | 24 |
| Drywall | Residential | $21.45 – $51.60 | $8.62 – $27.09 | 8 |
| Drywall Finisher/taper | Building | $32.27 – $63.76 | $14.70 – $32.69 | 15 |
| Drywall Finisher/taper | Heavy | $32.27 – $63.76 | $14.70 – $32.69 | 15 |
| Drywall Finisher/taper | Highway | $32.27 – $63.76 | $14.70 – $32.69 | 15 |
| Drywall Finisher/taper | Residential | $32.27 – $63.76 | $14.70 – $32.69 | 5 |
| Drywall Finisher/taper Imperial, Los Angeles, Orange,… | Residential | $32.27 | $14.70 | 1 |
| Drywall Hanger | Residential | $9.77 | $0.00 | 1 |
| Drywall Installers/lathers | Building | $9.54 – $52.65 | $3.34 – $31.26 | 11 |
| Drywall Installers/lathers | Heavy | $45.92 – $52.65 | $31.26 | 7 |
| Drywall Installers/lathers | Highway | $45.92 – $52.65 | $31.26 | 7 |
| Drywall Installers/lathers | Residential | $48.12 – $54.85 | $31.93 | 3 |
| Drywall Stocker/scrapper | Building | $22.97 – $26.33 | $18.22 | 7 |
| Drywall Stocker/scrapper | Heavy | $22.97 – $26.33 | $18.22 | 7 |
| Drywall Stocker/scrapper | Highway | $22.97 – $26.33 | $18.22 | 7 |
| Drywall Stocker/scrapper | Residential | $24.07 – $27.43 | $18.58 | 3 |
| Drywall Taper | Building | $13.08 | $0.00 | 1 |
| Drywall Taper | Residential | $7.50 – $10.68 | $0.00 | 2 |
| Electrician | Building | $16.30 – $91.25 | $3.87 – $51.07 | 35 |
| Electrician | Heavy | $40.50 – $91.25 | $8.18 – $51.07 | 34 |
| Electrician | Highway | $40.50 – $91.25 | $8.18 – $51.07 | 34 |
| Electrician | Residential | $7.73 – $91.25 | $0.00 – $51.07 | 34 |
| Electrician All Work Within 32 Road Miles Or Less From The… | Residential | $53.09 | $31.56 | 1 |
| Electrician Merced And Stanislaus Counties | Residential | $48.50 | $30.09 | 1 |
| Electrician Rate. Tunnel Work | Building | $53.15 | $29.07 | 1 |
| Electrician Rate. Tunnel Work | Heavy | $53.15 | $29.07 | 1 |
| Electrician Rate. Tunnel Work | Highway | $53.15 | $29.07 | 1 |
| Electrician San Joaquin County | Residential | $49.45 | $31.96 | 1 |
| Electrician Zone A | Building | $70.41 | $33.76 | 1 |
| Electrician Zone A | Heavy | $70.41 | $33.76 | 1 |
| Electrician Zone A | Highway | $70.41 | $33.76 | 1 |
| Electrician Zone B | Building | $77.45 | $33.97 | 1 |
| Electrician Zone B | Heavy | $77.45 | $33.97 | 1 |
| Electrician Zone B | Highway | $77.45 | $33.97 | 1 |
| Electricians | Building | $13.62 – $58.40 | $1.31 – $31.72 | 7 |
| Electricians | Heavy | $55.50 – $59.17 | $24.42 – $32.04 | 3 |
| Electricians | Highway | $55.50 – $59.17 | $24.42 – $32.04 | 3 |
| Electricians | Residential | $19.00 – $41.00 | $4.73 – $7.72 | 2 |
| Elevator Constructor | Building | $29.39 | $3.29 | 1 |
| Elevator Mechanic | Building | $31.06 – $84.05 | $3.87 – $38.44 | 13 |
| Elevator Mechanic | Heavy | $69.43 – $84.05 | $38.44 | 12 |
| Elevator Mechanic | Highway | $69.43 – $84.05 | $38.44 | 12 |
| Elevator Mechanic | Residential | $69.43 – $84.05 | $38.44 | 3 |
| Elevator Mechanic Imperial, Los Angeles, Orange, Riverside,… | Residential | $69.43 | $38.44 | 1 |
| Fire Stop Technician | Building | $39.94 | $20.65 | 11 |
| Fire Stop Technician | Heavy | $39.94 | $20.65 | 11 |
| Fire Stop Technician | Highway | $39.94 | $20.65 | 11 |
| Fire Stop Technician | Residential | $39.94 | $20.65 | 3 |
| Floor Layer | Building | $10.72 – $18.73 | $0.00 – $4.41 | 4 |
| Floor Layer | Residential | $8.00 – $12.50 | $0.00 | 2 |
| Gardeners, Horticultural & Landscape Laborers | Heavy | $28.94 – $35.25 | $27.30 | 4 |
| Gardeners, Horticultural & Landscape Laborers | Highway | $28.94 – $35.25 | $27.30 | 4 |
| Glazier | Building | $12.52 – $56.22 | $5.21 – $35.62 | 12 |
| Glazier | Heavy | $43.25 – $56.22 | $22.16 – $35.62 | 9 |
| Glazier | Highway | $43.25 – $56.22 | $22.16 – $35.62 | 9 |
| Glazier | Residential | $43.25 – $56.22 | $22.16 – $35.62 | 6 |
| High Time | Building | $43.45 | $22.80 | 1 |
| High Time | Heavy | $43.45 | $22.80 | 1 |
| High Time | Highway | $43.45 | $22.80 | 1 |
| Hod Carrier | Building | $9.00 – $11.76 | $0.00 – $1.55 | 2 |
| Hod Carrier | Residential | $10.16 | $4.05 | 1 |
| Installer | Building | $25.16 – $28.76 | $22.53 | 3 |
| Installer | Heavy | $25.16 – $28.76 | $22.53 | 3 |
| Installer | Highway | $25.16 – $28.76 | $22.53 | 3 |
| Insulator/asbestos Worker | Building | $21.60 – $56.32 | $5.61 – $26.52 | 3 |
| Insulator/asbestos Worker | Heavy | $56.32 | $26.52 | 1 |
| Insulator/asbestos Worker | Highway | $56.32 | $26.52 | 1 |
| Ironworker | Building | $43.75 – $50.70 | $26.51 – $35.15 | 26 |
| Ironworker | Heavy | $43.75 – $50.70 | $26.51 – $35.15 | 26 |
| Ironworker | Highway | $43.75 – $50.70 | $26.51 – $35.15 | 26 |
| Ironworker | Residential | $43.75 – $50.70 | $26.51 – $35.15 | 14 |
| Ironworkers | Building | $18.01 – $55.83 | $8.93 – $35.15 | 8 |
| Ironworkers | Heavy | $43.75 – $55.83 | $26.51 – $35.15 | 6 |
| Ironworkers | Highway | $43.75 – $55.83 | $26.51 – $35.15 | 6 |
| Ironworkers | Residential | $45.78 – $55.83 | $26.51 – $35.15 | 4 |
| Laborer | Building | $7.83 – $49.48 | $2.86 – $30.03 | 167 |
| Laborer | Heavy | $28.94 – $49.48 | $22.13 – $30.03 | 164 |
| Laborer | Highway | $28.94 – $49.48 | $22.13 – $30.03 | 164 |
| Laborer | Residential | $7.25 – $48.72 | $0.00 – $26.24 | 47 |
| Laborer, Asbestos/mold/lead Laborer | Building | $36.75 – $37.75 | $29.69 | 2 |
| Laborer, Asbestos/mold/lead Laborer | Heavy | $36.75 – $37.75 | $29.69 | 2 |
| Laborer, Asbestos/mold/lead Laborer | Highway | $36.75 – $37.75 | $29.69 | 2 |
| Laborer, Asbestos/mold/lead Laborer | Residential | $38.15 – $39.15 | $30.03 | 2 |
| Laborer, Brick | Building | $36.29 | $25.55 | 1 |
| Laborer, Brick | Heavy | $36.29 | $25.55 | 1 |
| Laborer, Brick | Highway | $36.29 | $25.55 | 1 |
| Laborer, Building And All Other Residential Construction | Building | $45.54 – $48.64 | $25.09 | 5 |
| Laborer, Building And All Other Residential Construction | Heavy | $45.54 – $48.64 | $25.09 | 5 |
| Laborer, Building And All Other Residential Construction | Highway | $45.54 – $48.64 | $25.09 | 5 |
| Laborer, Building And All Other Residential Construction | Residential | $45.54 – $48.64 | $25.09 | 5 |
| Laborer, Construction Craft Laborers day | Building | $28.94 – $38.85 | $27.30 – $29.89 | 65 |
| Laborer, Construction Craft Laborers day | Heavy | $28.94 – $38.85 | $27.30 – $29.89 | 65 |
| Laborer, Construction Craft Laborers day | Highway | $28.94 – $38.85 | $27.30 – $29.89 | 65 |
| Laborer, General | Residential | $7.25 | $0.00 | 1 |
| Laborer, Gunite | Building | $35.25 – $55.88 | $23.77 – $29.89 | 62 |
| Laborer, Gunite | Heavy | $35.25 – $55.88 | $23.77 – $29.89 | 62 |
| Laborer, Gunite | Highway | $35.25 – $55.88 | $23.77 – $29.89 | 62 |
| Laborer, Gunite | Residential | $51.39 – $55.88 | $23.77 | 3 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold | Building | $39.77 – $40.68 | $28.54 – $29.68 | 5 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold | Heavy | $39.77 – $40.68 | $28.54 – $29.68 | 5 |
| Laborer, Plaster Tender. Work On A Swing Stage Scaffold | Highway | $39.77 – $40.68 | $28.54 – $29.68 | 5 |
| Laborer, Traffic Control/lane Closure | Building | $34.06 – $37.56 | $27.30 – $27.32 | 30 |
| Laborer, Traffic Control/lane Closure | Heavy | $34.06 – $37.56 | $27.30 – $27.32 | 30 |
| Laborer, Traffic Control/lane Closure | Highway | $34.06 – $37.56 | $27.30 – $27.32 | 30 |
| Laborer, Tunnel | Building | $53.60 – $55.07 | $25.74 | 40 |
| Laborer, Tunnel | Heavy | $53.60 – $55.07 | $25.74 | 40 |
| Laborer, Tunnel | Highway | $53.60 – $55.07 | $25.74 | 40 |
| Laborer, Wrecking | Building | $35.35 – $38.15 | $27.30 – $29.89 | 16 |
| Laborer, Wrecking | Heavy | $35.35 – $38.15 | $27.30 – $29.89 | 16 |
| Laborer, Wrecking | Highway | $35.35 – $38.15 | $27.30 – $29.89 | 16 |
| Laborer, Wrecking - | Building | $35.35 – $36.35 | $27.30 | 3 |
| Laborer, Wrecking - | Heavy | $35.35 – $36.35 | $27.30 | 3 |
| Laborer, Wrecking - | Highway | $35.35 – $36.35 | $27.30 | 3 |
| Laborers | Building | $9.66 – $54.35 | $5.36 – $25.09 | 107 |
| Laborers | Heavy | $28.94 – $54.35 | $20.86 – $27.30 | 115 |
| Laborers | Highway | $28.94 – $54.35 | $20.86 – $27.30 | 115 |
| Laborers | Residential | $28.94 – $54.35 | $20.86 – $27.30 | 131 |
| Landscape Laborer | Building | $10.05 – $16.36 | $5.96 | 2 |
| Landscape Laborer | Residential | $28.94 | $27.30 | 1 |
| Landscape Laborer, Gardeners, Horticultural & Landscape Laborers | Residential | $29.94 – $36.25 | $27.30 | 5 |
| Landscape Laborer, Gardeners, Horticultural & Landscape… | Residential | $29.94 – $36.25 | $27.30 | 4 |
| Landscape Laborer, Gardeners, Horticultural & Landscape… | Residential | $28.94 – $35.25 | $27.30 | 4 |
| Landscape/irrigation Fitter | Building | $77.35 | $36.53 | 2 |
| Landscape/irrigation Fitter | Heavy | $77.35 | $36.53 | 3 |
| Landscape/irrigation Fitter | Highway | $77.35 | $36.53 | 3 |
| Landscape/irrigation Fitter | Residential | $77.35 | $36.53 | 1 |
| Lather | Residential | $13.10 – $15.00 | $0.00 – $3.20 | 2 |
| Lead Installer | Building | $27.96 – $32.21 | $23.03 | 3 |
| Lead Installer | Heavy | $27.96 – $32.21 | $23.03 | 3 |
| Lead Installer | Highway | $27.96 – $32.21 | $23.03 | 3 |
| Less) | Building | $47.65 – $54.36 | $16.31 – $16.51 | 4 |
| Less) | Heavy | $47.65 – $54.36 | $16.31 – $16.51 | 4 |
| Less) | Highway | $47.65 – $54.36 | $16.31 – $16.51 | 4 |
| Line Construction | Building | $13.23 – $70.16 | $3.71 – $25.20 | 48 |
| Line Construction | Heavy | $33.37 – $70.16 | $15.80 – $25.20 | 48 |
| Line Construction | Highway | $33.37 – $70.16 | $15.80 – $25.20 | 48 |
| Line Construction | Residential | $40.76 – $70.16 | $18.79 – $24.71 | 4 |
| Line Construction, Cable Splicer | Building | $18.80 – $25.14 | $5.49 – $6.08 | 2 |
| Line Construction, Ground Person | Building | $13.93 – $18.28 | $5.29 – $5.89 | 2 |
| Line Construction, Heavy Equipment Operator | Building | $15.67 – $18.22 | $5.29 – $5.96 | 2 |
| Line Construction, Line Technician | Building | $17.41 – $22.85 | $5.43 – $6.03 | 2 |
| Marble And Terrazzo Setter | Building | $21.09 | $4.13 | 1 |
| Marble Finisher | Building | $13.92 – $46.97 | $3.67 – $19.80 | 15 |
| Marble Finisher | Heavy | $42.06 – $46.97 | $15.36 – $19.80 | 14 |
| Marble Finisher | Highway | $42.06 – $46.97 | $15.36 – $19.80 | 14 |
| Marble Finisher | Residential | $42.06 – $46.97 | $15.36 – $19.80 | 3 |
| Marble Mason | Building | $61.72 | $30.31 | 2 |
| Marble Mason | Heavy | $61.72 | $30.31 | 3 |
| Marble Mason | Highway | $61.72 | $30.31 | 3 |
| Marble Mason | Residential | $61.72 | $30.31 | 1 |
| Marble Setter, Terrazzo Worker | Building | $17.57 | $4.60 | 1 |
| Mason Tender, Brick | Residential | $35.29 | $26.85 | 2 |
| Mason Tender, Brick San Francisco And San Mateo Counties… day | Residential | $37.05 | $27.45 | 1 |
| Mason Tender, Brick. Footnotes day | Building | $37.05 | $27.45 | 1 |
| Mason Tender, Brick. Footnotes day | Heavy | $37.05 | $27.45 | 1 |
| Mason Tender, Brick. Footnotes day | Highway | $37.05 | $27.45 | 1 |
| Master Installer | Building | $31.38 – $36.43 | $23.03 | 3 |
| Master Installer | Heavy | $31.38 – $36.43 | $23.03 | 3 |
| Master Installer | Highway | $31.38 – $36.43 | $23.03 | 3 |
| Millwright | Building | $52.24 | $26.68 | 1 |
| Millwright | Heavy | $52.24 | $26.68 | 1 |
| Millwright | Highway | $52.24 | $26.68 | 1 |
| Millwright | Residential | $52.24 | $26.68 | 1 |
| Modular Furniture Installer | Building | $25.00 – $36.43 | $13.06 – $23.03 | 19 |
| Modular Furniture Installer | Heavy | $25.00 – $36.43 | $13.06 – $23.03 | 19 |
| Modular Furniture Installer | Highway | $25.00 – $36.43 | $13.06 – $23.03 | 19 |
| Modular Furniture Installer | Residential | $25.00 | $13.06 | 2 |
| Operator | Building | $42.50 – $70.75 | $28.56 – $40.95 | 533 |
| Operator | Heavy | $42.50 – $70.75 | $28.56 – $40.95 | 674 |
| Operator | Highway | $42.50 – $70.75 | $28.56 – $40.95 | 674 |
| Operator | Residential | $35.11 – $70.75 | $25.25 – $40.95 | 186 |
| Operator, Power Equipment | Building | $60.73 – $67.90 | $40.95 | 54 |
| Operator, Power Equipment | Heavy | $60.73 – $67.90 | $40.95 | 54 |
| Operator, Power Equipment | Highway | $60.73 – $67.90 | $40.95 | 54 |
| Or Less | Building | $73.19 | $46.00 | 1 |
| Or Less | Heavy | $73.19 | $46.00 | 1 |
| Or Less | Highway | $73.19 | $46.00 | 1 |
| Or Less) | Heavy | $73.19 | $46.00 | 1 |
| Or Less) | Highway | $73.19 | $46.00 | 1 |
| Over) | Building | $50.65 – $57.36 | $16.40 – $16.60 | 4 |
| Over) | Heavy | $50.65 – $57.36 | $16.40 – $16.60 | 4 |
| Over) | Highway | $50.65 – $57.36 | $16.40 – $16.60 | 4 |
| Painter | Building | $9.87 – $57.00 | $0.00 – $28.04 | 4 |
| Painter | Heavy | $34.49 – $57.00 | $21.80 – $28.04 | 4 |
| Painter | Highway | $34.49 – $57.00 | $21.80 – $28.04 | 4 |
| Painter | Residential | $8.19 – $57.00 | $0.00 – $28.04 | 13 |
| Painter, Including Lead Abatement | Residential | $25.40 – $34.08 | $15.87 – $18.50 | 7 |
| Painters | Building | $12.51 – $42.19 | $2.43 – $19.04 | 27 |
| Painters | Heavy | $13.35 – $53.38 | $2.94 – $28.04 | 22 |
| Painters | Highway | $13.35 – $53.38 | $2.94 – $28.04 | 22 |
| Painters | Residential | $38.52 – $43.45 | $18.64 – $22.80 | 3 |
| Painters, Including Lead Abatement | Building | $36.44 | $18.58 | 1 |
| Painters, Including Lead Abatement | Heavy | $36.44 | $18.58 | 1 |
| Painters, Including Lead Abatement | Highway | $36.44 | $18.58 | 1 |
| Parking Lot Striping | Building | $12.39 – $14.83 | $2.00 | 6 |
| Parking Lot Striping/highway Marking | Building | $12.88 – $40.83 | $3.52 – $17.62 | 12 |
| Parking Lot Striping/highway Marking | Heavy | $34.71 – $40.83 | $17.62 | 12 |
| Parking Lot Striping/highway Marking | Highway | $34.71 – $40.83 | $17.62 | 12 |
| Parking Lot Striping/highway Marking | Residential | $34.71 – $40.83 | $17.62 | 3 |
| Piledriver | Building | $54.10 | $34.69 | 2 |
| Piledriver | Heavy | $54.10 | $34.69 | 4 |
| Piledriver | Highway | $54.10 | $34.69 | 4 |
| Piledriverman | Building | $52.37 | $26.18 | 1 |
| Piledriverman | Heavy | $52.37 | $26.18 | 1 |
| Piledriverman | Highway | $52.37 | $26.18 | 1 |
| Piledriverman | Residential | $52.37 | $26.18 | 1 |
| Pipefitter | Building | $80.50 | $50.45 | 1 |
| Pipefitter | Heavy | $80.50 | $50.45 | 1 |
| Pipefitter | Highway | $80.50 | $50.45 | 1 |
| Plaster Tender | Residential | $39.77 – $41.93 | $28.54 – $30.32 | 3 |
| Plaster Tender. Work On A Swing Stage Scaffold | Building | $41.93 | $30.32 | 2 |
| Plaster Tender. Work On A Swing Stage Scaffold | Heavy | $41.93 | $30.32 | 2 |
| Plaster Tender. Work On A Swing Stage Scaffold | Highway | $41.93 | $30.32 | 2 |
| Plasterer | Building | $12.05 – $47.37 | $2.94 – $31.68 | 17 |
| Plasterer | Heavy | $32.70 – $47.37 | $19.64 – $31.68 | 14 |
| Plasterer | Highway | $32.70 – $47.37 | $19.64 – $31.68 | 14 |
| Plasterer | Residential | $8.25 – $47.37 | $0.00 – $31.68 | 10 |
| Plasterer Fort Irwin | Building | $47.37 | $19.64 | 1 |
| Plasterer Fort Irwin | Heavy | $47.37 | $19.64 | 1 |
| Plasterer Fort Irwin | Highway | $47.37 | $19.64 | 1 |
| Plasterer North Island Naval Air Station, Colorado Naval… | Building | $47.37 | $19.64 | 1 |
| Plasterer North Island Naval Air Station, Colorado Naval… | Heavy | $47.37 | $19.64 | 1 |
| Plasterer North Island Naval Air Station, Colorado Naval… | Highway | $47.37 | $19.64 | 1 |
| Plasterer North Island Naval Air Station, Colorado Naval… | Residential | $47.37 | $19.64 | 1 |
| Plasterer Tender | Building | $39.77 | $28.54 | 3 |
| Plasterer Tender | Heavy | $39.77 | $28.54 | 3 |
| Plasterer Tender | Highway | $39.77 | $28.54 | 3 |
| Plasterer Tender | Residential | $39.77 – $41.93 | $28.54 – $30.32 | 3 |
| Plasterer Tender Work On A Swing Stage Scaffold | Heavy | $39.77 | $28.54 | 1 |
| Plasterer Tender Work On A Swing Stage Scaffold | Highway | $39.77 | $28.54 | 1 |
| Plasterer Tender. Work On A Swing Stage Scaffold | Building | $39.77 – $41.93 | $28.54 – $30.32 | 2 |
| Plasterer Tender. Work On A Swing Stage Scaffold | Heavy | $39.77 – $41.93 | $28.54 – $30.32 | 2 |
| Plasterer Tender. Work On A Swing Stage Scaffold | Highway | $39.77 – $41.93 | $28.54 – $30.32 | 2 |
| Plasterer U.s. Marine Corps-pickle Meadow & Mountain Warfare… | Building | $47.37 | $19.64 | 1 |
| Plasterer U.s. Marine Corps-pickle Meadow & Mountain Warfare… | Heavy | $47.37 | $19.64 | 1 |
| Plasterer U.s. Marine Corps-pickle Meadow & Mountain Warfare… | Highway | $47.37 | $19.64 | 1 |
| Plasterer Work At Naval Air Facility Seeley | Building | $47.37 | $19.64 | 1 |
| Plasterer Work At Naval Air Facility Seeley | Heavy | $47.37 | $19.64 | 1 |
| Plasterer Work At Naval Air Facility Seeley | Highway | $47.37 | $19.64 | 1 |
| Plumber | Building | $13.00 – $85.50 | $10.74 – $48.98 | 27 |
| Plumber | Heavy | $13.00 – $91.00 | $10.74 – $49.40 | 29 |
| Plumber | Highway | $13.00 – $91.00 | $10.74 – $49.40 | 29 |
| Plumber | Residential | $8.25 – $52.75 | $0.00 – $41.39 | 15 |
| Plumber & Steamfitter | Building | $54.50 – $58.45 | $38.74 – $43.60 | 4 |
| Plumber & Steamfitter | Heavy | $51.65 – $58.45 | $38.74 – $43.60 | 4 |
| Plumber & Steamfitter | Highway | $51.65 – $58.45 | $38.74 – $43.60 | 4 |
| Plumber & Steamfitter | Residential | $57.75 – $80.50 | $43.60 – $50.45 | 2 |
| Plumber And Steamfitter | Building | $16.47 – $68.57 | $6.35 – $49.04 | 6 |
| Plumber And Steamfitter | Heavy | $67.68 – $68.57 | $49.04 | 2 |
| Plumber And Steamfitter | Highway | $67.68 – $68.57 | $49.04 | 2 |
| Plumber, Pipefitter, Steamfitter | Building | $44.29 – $80.50 | $24.16 – $50.45 | 11 |
| Plumber, Pipefitter, Steamfitter | Heavy | $44.29 – $80.50 | $24.16 – $50.45 | 11 |
| Plumber, Pipefitter, Steamfitter | Highway | $44.29 – $80.50 | $24.16 – $50.45 | 11 |
| Plumber, Pipefitter, Steamfitter | Residential | $43.72 – $66.23 | $20.29 – $26.81 | 5 |
| Plumber, Steamfitter, Refrigeration Fitter | Building | $69.70 – $91.00 | $46.38 – $49.40 | 2 |
| Plumber, Steamfitter, Refrigeration Fitter | Heavy | $69.70 – $91.00 | $46.38 – $49.40 | 2 |
| Plumber, Steamfitter, Refrigeration Fitter | Highway | $69.70 – $91.00 | $46.38 – $49.40 | 2 |
| Plumber, Steamfitter, Refrigeration Fitter | Residential | $82.00 – $91.00 | $48.18 – $49.49 | 2 |
| Plumber/pipefitter | Building | $30.85 – $72.23 | $18.71 – $46.63 | 29 |
| Plumber/pipefitter | Heavy | $30.85 – $72.23 | $18.71 – $46.63 | 29 |
| Plumber/pipefitter | Highway | $30.85 – $72.23 | $18.71 – $46.63 | 29 |
| Plumber/pipefitter | Residential | $48.83 | $22.73 | 2 |
| Plumber/pipefitter Vandenburg Air Force Base | Building | $66.23 | $26.81 | 1 |
| Plumber/pipefitter Vandenburg Air Force Base | Heavy | $66.23 | $26.81 | 1 |
| Plumber/pipefitter Vandenburg Air Force Base | Highway | $66.23 | $26.81 | 1 |
| Plumber/pipefitter/steamfitter | Building | $87.75 | $41.44 | 1 |
| Plumber/pipefitter/steamfitter | Heavy | $87.75 | $41.44 | 1 |
| Plumber/pipefitter/steamfitter | Highway | $87.75 | $41.44 | 1 |
| Plumber/pipefitter/steamfitter | Residential | $87.75 | $41.44 | 1 |
| Plumbers And Pipefitters | Residential | $14.00 – $55.58 | $5.14 – $24.02 | 5 |
| Power Equipment Operators | Building | $8.53 – $26.65 | $0.62 – $9.70 | 43 |
| Refrigeration Mechanic | Residential | $57.65 | $25.01 | 1 |
| Roofer | Building | $10.05 – $57.17 | $2.00 – $23.34 | 22 |
| Roofer | Heavy | $42.80 – $57.17 | $12.64 – $23.34 | 19 |
| Roofer | Highway | $42.80 – $57.17 | $12.64 – $23.34 | 19 |
| Roofer | Residential | $7.25 – $57.17 | $0.00 – $23.34 | 17 |
| Roofer Fresno, Kern, Madera And Tulare Counties | Residential | $45.76 | $16.86 | 1 |
| Roofer Merced, San Joaquin And Stanislaus Counties | Residential | $49.65 | $22.19 | 1 |
| Roofers | Building | $15.00 – $19.65 | $3.84 – $7.64 | 6 |
| Sheet Metal | Residential | $38.65 | $10.31 | 1 |
| Sheet Metal Technician Sheet Metal Technician - Scope | Building | $38.65 | $10.31 | 1 |
| Sheet Metal Technician Sheet Metal Technician - Scope | Heavy | $38.65 | $10.31 | 1 |
| Sheet Metal Technician Sheet Metal Technician - Scope | Highway | $38.65 | $10.31 | 1 |
| Sheet Metal Worker | Building | $18.37 – $86.31 | $4.85 – $46.83 | 33 |
| Sheet Metal Worker | Heavy | $35.57 – $86.31 | $10.31 – $46.83 | 29 |
| Sheet Metal Worker | Highway | $35.57 – $86.31 | $10.31 – $46.83 | 29 |
| Sheet Metal Worker | Residential | $9.00 – $86.31 | $0.00 – $46.75 | 18 |
| Sheet Metal Worker Sheet Metal Technician - Scope | Building | $51.45 | $30.92 | 1 |
| Sheet Metal Worker Sheet Metal Technician - Scope | Heavy | $51.45 | $30.92 | 1 |
| Sheet Metal Worker Sheet Metal Technician - Scope | Highway | $51.45 | $30.92 | 1 |
| Soft Floor Layer | Building | $34.27 – $59.00 | $16.47 – $33.03 | 15 |
| Soft Floor Layer | Heavy | $34.27 – $59.00 | $16.47 – $33.03 | 15 |
| Soft Floor Layer | Highway | $34.27 – $59.00 | $16.47 – $33.03 | 15 |
| Soft Floor Layer | Residential | $34.27 – $59.00 | $16.47 – $33.03 | 5 |
| Soft Floor Layer Fresno, Madera And Tulare Counties | Residential | $38.53 | $23.19 | 1 |
| Soft Floor Layer Kern County | Residential | $45.15 | $19.43 | 1 |
| Soft Floor Layer Los Angeles, Orange, Riverside, San… | Residential | $45.15 | $19.43 | 1 |
| Soft Floor Layer San Joaquin And Stanislaus Counties | Residential | $48.54 | $26.59 | 1 |
| Sound & Communications | Building | $43.78 – $67.65 | $15.39 – $31.78 | 18 |
| Sound & Communications | Heavy | $43.78 – $67.65 | $15.39 – $31.78 | 18 |
| Sound & Communications | Highway | $43.78 – $67.65 | $15.39 – $31.78 | 18 |
| Sound & Communications | Residential | $40.00 – $67.65 | $15.39 – $31.78 | 11 |
| Sound & Communications, Installer | Residential | $56.68 | $28.35 | 1 |
| Sprinkler Fitter | Building | $21.87 – $81.54 | $3.23 – $41.35 | 21 |
| Sprinkler Fitter | Heavy | $49.69 – $81.54 | $28.19 – $41.35 | 18 |
| Sprinkler Fitter | Highway | $49.69 – $81.54 | $28.19 – $41.35 | 18 |
| Sprinkler Fitter | Residential | $49.69 – $58.60 | $18.05 – $33.65 | 7 |
| Terrazzo Finisher | Building | $16.02 – $46.09 | $3.95 – $20.98 | 17 |
| Terrazzo Finisher | Heavy | $42.11 – $46.09 | $14.67 – $20.98 | 13 |
| Terrazzo Finisher | Highway | $42.11 – $46.09 | $14.67 – $20.98 | 13 |
| Terrazzo Finisher | Residential | $42.11 – $46.09 | $14.67 – $20.98 | 3 |
| Terrazzo Worker | Residential | $60.58 | $29.79 | 1 |
| Terrazzo Worker/setter | Building | $49.62 – $60.58 | $15.26 – $29.79 | 11 |
| Terrazzo Worker/setter | Heavy | $49.62 – $60.58 | $15.26 – $29.79 | 13 |
| Terrazzo Worker/setter | Highway | $49.62 – $60.58 | $15.26 – $29.79 | 13 |
| Terrazzo Worker/setter | Residential | $49.62 – $54.13 | $15.26 – $16.01 | 2 |
| The Main Watershed Divide), El Dorado | Building | $48.50 | $23.04 | 1 |
| The Main Watershed Divide), El Dorado | Heavy | $48.50 | $23.04 | 1 |
| The Main Watershed Divide), El Dorado | Highway | $48.50 | $23.04 | 1 |
| Tile Finisher | Building | $10.68 – $41.55 | $1.65 – $19.28 | 19 |
| Tile Finisher | Heavy | $32.68 – $41.55 | $13.77 – $19.28 | 20 |
| Tile Finisher | Highway | $32.68 – $41.55 | $13.77 – $19.28 | 20 |
| Tile Finisher | Residential | $35.00 – $41.55 | $13.77 – $19.28 | 5 |
| Tile Layer | Building | $48.29 – $59.92 | $19.18 – $22.62 | 17 |
| Tile Layer | Heavy | $48.29 – $59.92 | $19.18 – $22.62 | 20 |
| Tile Layer | Highway | $48.29 – $59.92 | $19.18 – $22.62 | 20 |
| Tile Layer | Residential | $51.82 – $59.92 | $19.32 – $22.62 | 6 |
| Tile Setter | Building | $18.92 – $23.35 | $3.29 – $4.48 | 2 |
| Tile Setter | Residential | $7.25 | $0.00 | 1 |
| Traffic Signal, Street Light And Underground Work | Building | $33.10 – $43.62 | $14.09 – $14.41 | 4 |
| Traffic Signal, Street Light And Underground Work | Heavy | $33.10 – $43.62 | $14.09 – $14.41 | 4 |
| Traffic Signal, Street Light And Underground Work | Highway | $33.10 – $43.62 | $14.09 – $14.41 | 4 |
| Traffic Signal, Street Light And Underground Work | Residential | $33.10 – $43.62 | $14.09 – $14.41 | 2 |
| Truck Driver | Building | $41.59 – $44.05 | $35.69 | 108 |
| Truck Driver | Heavy | $41.59 – $44.05 | $35.69 | 108 |
| Truck Driver | Highway | $41.59 – $44.05 | $35.69 | 108 |
| Truck Drivers | Building | $7.50 – $45.31 | $0.62 – $34.28 | 93 |
| Truck Drivers | Heavy | $32.12 – $45.31 | $27.07 – $34.28 | 27 |
| Truck Drivers | Highway | $32.12 – $45.31 | $27.07 – $34.28 | 27 |
| Truck Drivers | Residential | $32.12 – $45.31 | $27.07 – $35.69 | 24 |
| Tunnel And Shaft Laborers | Building | $44.42 – $46.41 | $27.72 | 60 |
| Tunnel And Shaft Laborers | Heavy | $44.42 – $46.41 | $27.72 | 72 |
| Tunnel And Shaft Laborers | Highway | $44.42 – $46.41 | $27.72 | 72 |
| Under | Building | $72.71 | $38.92 | 1 |
| Under | Heavy | $72.71 | $38.92 | 1 |
| Under | Highway | $72.71 | $38.92 | 1 |
| Underground Utility Worker | Building | $36.01 | $18.50 | 1 |
| Underground Utility Worker | Heavy | $36.01 | $18.50 | 2 |
| Underground Utility Worker | Highway | $36.01 | $18.50 | 2 |
| Underground Utility Worker | Residential | $36.01 | $18.50 | 1 |
| Underground Utility Worker / Landscape Fitter | Heavy | $36.01 | $18.50 | 1 |
| Underground Utility Worker / Landscape Fitter | Highway | $36.01 | $18.50 | 1 |
| Underground Utility Worker /landscape Fitter | Building | $36.01 | $18.50 | 1 |
| Underground Utility Worker /landscape Fitter | Heavy | $36.01 | $18.50 | 1 |
| Underground Utility Worker /landscape Fitter | Highway | $36.01 | $18.50 | 1 |
| Work In A Condor, From The Third | Building | $53.05 | $30.64 | 6 |
| Work In A Condor, From The Third | Heavy | $53.05 | $30.64 | 6 |
| Work In A Condor, From The Third | Highway | $53.05 | $30.64 | 6 |
The determinations
Read the scope before the table: a determination covers the counties and construction types listed here, and the contract that incorporates it fixes its version.
| Determination | Newest effective | Types | Counties | Rate lines |
|---|---|---|---|---|
| CA20260001 Mod 3 | May 18, 2026 | Building, Heavy, Highway, Residential | 1 | 146 |
| CA20260002 Mod 4 | Jul 14, 2026 | Building, Heavy, Highway | 1 | 139 |
| CA20260004 Mod 4 | Sep 3, 2026 | Heavy, Highway | 4 | 127 |
| CA20260005 Mod 2 | May 20, 2026 | Building | 4 | 133 |
| CA20260007 Mod 5 | Sep 3, 2026 | Building, Heavy, Highway | 24 | 297 |
| CA20260008 Mod 1 | May 18, 2026 | Residential | 1 | 14 |
| CA20260009 Mod 1 | May 18, 2026 | Residential | 7 | 78 |
| CA20260011 Mod 1 | May 18, 2026 | Residential | 1 | 12 |
| CA20260012 Mod 5 | Sep 3, 2026 | Building, Heavy, Highway | 1 | 130 |
| CA20260013 Mod 1 | May 18, 2026 | Residential | 1 | 7 |
| CA20260014 Mod 7 | Oct 15, 2026 | Building, Heavy, Highway | 1 | 131 |
| CA20260015 Mod 5 | Sep 3, 2026 | Building, Heavy, Highway | 1 | 129 |
| CA20260016 Mod 4 | Sep 3, 2026 | Building | 1 | 24 |
| CA20260017 Mod 5 | Oct 15, 2026 | Residential | 8 | 169 |
| CA20260018 Mod 8 | Sep 17, 2026 | Building, Heavy, Highway | 17 | 486 |
| CA20260019 Mod 6 | Sep 3, 2026 | Residential | 18 | 343 |
| CA20260020 Mod 5 | Jul 30, 2026 | Building, Heavy, Highway | 3 | 150 |
| CA20260021 Mod 2 | May 18, 2026 | Heavy, Highway | 1 | 165 |
| CA20260022 Mod 5 | Aug 6, 2026 | Building, Heavy, Highway | 1 | 135 |
| CA20260023 Mod 1 | May 18, 2026 | Building | 1 | 130 |
| CA20260024 Mod 4 | Jul 14, 2026 | Building, Heavy, Highway | 1 | 132 |
| CA20260025 Mod 4 | Jul 14, 2026 | Building, Heavy, Highway | 1 | 127 |
| CA20260026 Mod 4 | Jul 14, 2026 | Building, Heavy, Highway | 1 | 133 |
| CA20260027 Mod 1 | May 18, 2026 | Residential | 1 | 9 |
| CA20260028 Mod 2 | Sep 3, 2026 | Residential | 1 | 9 |
| CA20260029 Mod 2 | Sep 3, 2026 | Residential | 6 | 10 |
| CA20260030 Mod 1 | May 18, 2026 | Residential | 10 | 10 |
| CA20260031 Mod 1 | May 18, 2026 | Residential | 3 | 10 |
How to use a federal rate on a California job
- Confirm which law governs. Federal or federally assisted money brings Davis-Bacon and the determination. State money brings the state schedule. A job with both must satisfy both.
- Take the determination from the contract. The number and modification printed there control, even if a newer determination exists.
- Split base from fringe. Overtime is 1.5× the basic hourly rate; the fringe obligation continues and is not multiplied.
- Map it onto the payroll. Field 5 takes the determination and modification, columns 6A–6C take base, plan credit and cash fringe — see the WH-347 guide.
Questions
What is the prevailing wage in California?
There is no single number. 28 active federal determinations cover 58 counties with 3385 rate lines; the rate depends on the classification, the county, the construction type and the determination your contract incorporates.
Are these the rates for state-funded work?
No. These are federal Davis-Bacon determinations. California state public works use the California DIR schedule instead — this site carries the DIR 2026-2 general determinations by county here, and the tool switches to them automatically when you pick California.
Why do some counties show several determinations?
Because building, heavy, highway and residential work are published separately, and a county is usually named in more than one of them. Use the construction type that matches the work, not the one with the highest rate.
Turn this rate into a checked payroll
Pick the county and type once, and WageDecoder fills the determination number, checks the classification, the fringe credit and the overtime base, then writes the official WH-347. Free, no account, nothing uploaded.