Prevailing wage rates in Illinois
Every active federal Davis-Bacon determination that covers Illinois: 70 determinations, 102 counties, 2536 rate lines, newest effective Nov 12, 2026. Pick your county below, or read the rate ranges by trade.
What this page covers
State-funded work is separate. Illinois public works are governed by Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. and administered by Illinois Department of Labor, Conciliation and Mediation Division, covering contracts with no dollar threshold. The state form is the Certified Transcript of Payroll. A federal determination does not replace the state rate, and on a project covered by both laws you must satisfy both — usually the higher rate plus each law's paperwork.
State rules, the filing clock and the penalty: Illinois certified payroll.
Counties covered
Each row is a Illinois county that appears in an active federal determination. The count is the number of determinations naming that county — usually one per construction type.
| County | Determinations | Construction types | Newest effective | Look up |
|---|---|---|---|---|
| Adams | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Alexander | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Bond | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Boone | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Brown | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Bureau | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Calhoun | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Carroll | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Cass | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Champaign | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Christian | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Clark | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Clay | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Clinton | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Coles | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Cook | 4 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Crawford | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Cumberland | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| De Kalb | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| De Witt | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Douglas | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| DuPage | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Edgar | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Edwards | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Effingham | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Fayette | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Ford | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Franklin | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Fulton | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Gallatin | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Greene | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Grundy | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Hamilton | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Hancock | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Hardin | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Henderson | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Henry | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Iroquois | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Jackson | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Jasper | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Jefferson | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Jersey | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Jo Daviess | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Johnson | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Kane | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Kankakee | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Kendall | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Knox | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| La Salle | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Lake | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Lawrence | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Lee | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Livingston | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Logan | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Macon | 4 | Building, Residential, Heavy, Highway | Jul 30, 2026 | Rates → |
| Macoupin | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Madison | 4 | Building, Residential, Heavy, Highway | Oct 29, 2026 | Rates → |
| Marion | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Marshall | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Mason | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Massac | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| McDonough | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| McHenry | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| McLean | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Menard | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Mercer | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Monroe | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Montgomery | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Morgan | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Moultrie | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Ogle | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Peoria | 5 | Building, Residential, Heavy, Highway | Jul 30, 2026 | Rates → |
| Perry | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Piatt | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Pike | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Pope | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Pulaski | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Putnam | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Randolph | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Richland | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Rock Island | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Saline | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Sangamon | 4 | Building, Residential, Heavy, Highway | Jul 30, 2026 | Rates → |
| Schuyler | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Scott | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Shelby | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| St. Clair | 4 | Building, Residential, Heavy, Highway | Oct 29, 2026 | Rates → |
| Stark | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Stephenson | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Tazewell | 5 | Building, Residential, Heavy, Highway | Jul 30, 2026 | Rates → |
| Union | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Vermilion | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Wabash | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Warren | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Washington | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Wayne | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| White | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Whiteside | 5 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Will | 5 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Williamson | 5 | Building, Heavy, Highway, Residential | Jul 30, 2026 | Rates → |
| Winnebago | 6 | Building, Residential, Heavy, Highway | Nov 12, 2026 | Rates → |
| Woodford | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
Rates by trade and construction type
These are the ranges across every Illinois county in the current determinations. A range means the same classification carries different rates in different counties, or the determination lists regional sub-rates — the exact figure for a job comes from the determination that names that county.
| Classification | Type | Basic hourly rate | Fringe | Rate lines |
|---|---|---|---|---|
| All Vehicles With More Than Six | Building | $44.54 – $45.09 | $13.40 | 4 |
| All Vehicles With More Than Six | Heavy | $44.54 – $45.09 | $13.40 | 4 |
| All Vehicles With More Than Six | Highway | $44.54 – $45.09 | $13.40 | 4 |
| All Vehicles With More Than Six | Residential | $44.54 – $45.09 | $13.40 | 4 |
| Asbestos Abatement Worker | Building | $33.38 – $35.25 | $25.06 – $28.34 | 3 |
| Asbestos Worker/heat & Frost Insulator | Building | $40.20 – $43.48 | $26.78 – $27.24 | 3 |
| Asbestos Worker/heat & Frost Insulator | Residential | $43.48 | $27.24 | 2 |
| Asbestos Worker/insulator | Building | $45.91 – $55.02 | $33.45 – $35.75 | 7 |
| Asbestos Worker/insulator | Heavy | $55.02 | $35.75 | 1 |
| Asbestos Worker/insulator | Highway | $55.02 | $35.75 | 1 |
| Asbestos Worker/insulator | Residential | $55.02 | $35.75 | 3 |
| Asbestos Workers/insulator | Building | $36.06 – $45.88 | $24.24 – $38.15 | 4 |
| Backhoe | Residential | $40.13 – $45.15 | $26.00 – $34.95 | 32 |
| Base Machine Men | Building | $31.13 – $34.16 | $15.99 – $24.46 | 4 |
| Base Machine Men | Residential | $34.16 | $24.46 | 1 |
| Boilermaker | Building | $45.23 – $53.10 | $32.76 – $38.54 | 12 |
| Boilermaker | Heavy | $53.10 | $38.54 | 1 |
| Boilermaker | Highway | $53.10 | $38.54 | 1 |
| Boilermaker | Residential | $45.23 – $53.10 | $32.76 – $38.54 | 7 |
| Bricklayer | Building | $30.79 – $48.56 | $21.69 – $34.05 | 14 |
| Bricklayer | Heavy | $44.88 | $26.62 | 1 |
| Bricklayer | Highway | $44.88 | $26.62 | 1 |
| Bricklayer | Residential | $12.00 – $48.56 | $0.00 – $34.05 | 43 |
| Bricklayer, Caulker, Cement Mason, Cleaner, Pointer & Stonemason | Building | $32.24 – $42.98 | $21.79 | 2 |
| Bricklayer, Caulker, Cement Mason, Cleaner, Pointer & Stonemason | Residential | $32.24 – $42.98 | $21.79 | 2 |
| Bricklayer, Caulker, Cleaner, Pointer & Stonemason | Building | $29.51 – $43.80 | $20.35 – $27.23 | 11 |
| Bricklayer, Caulker, Cleaner, Pointer & Stonemason | Residential | $33.13 – $33.49 | $22.05 – $24.93 | 2 |
| Cable Splicer | Building | $47.00 | $28.64 | 1 |
| Cable Splicer | Heavy | $47.00 | $28.64 | 2 |
| Cable Splicer | Highway | $47.00 | $28.64 | 2 |
| Carpenter | Building | $28.48 – $52.01 | $18.90 – $41.41 | 21 |
| Carpenter | Heavy | $31.55 – $52.01 | $18.90 – $38.96 | 43 |
| Carpenter | Highway | $31.55 – $52.01 | $18.90 – $38.96 | 43 |
| Carpenter | Residential | $13.72 – $52.01 | $0.00 – $41.41 | 73 |
| Carpenter - Piledriver | Building | $32.64 – $34.36 | $25.74 – $28.60 | 2 |
| Carpenter - Piledriver | Residential | $32.64 – $34.36 | $25.74 – $28.60 | 2 |
| Carpenter & Drywall Hanger | Residential | $31.30 | $18.90 | 1 |
| Carpenter & Soft Floor Layer | Residential | $30.02 | $28.60 | 1 |
| Carpenter And Lather | Building | $31.64 – $33.36 | $25.74 – $28.60 | 2 |
| Carpenter And Lather | Residential | $31.64 – $33.36 | $25.74 – $28.60 | 2 |
| Carpenter And Piledriver | Heavy | $41.36 – $52.01 | $18.90 – $38.86 | 4 |
| Carpenter And Piledriver | Highway | $41.36 – $52.01 | $18.90 – $38.86 | 4 |
| Carpenter And Piledrivermen | Heavy | $41.36 | $18.90 | 1 |
| Carpenter And Piledrivermen | Highway | $41.36 | $18.90 | 1 |
| Carpenter, Building | Building | $33.58 – $34.58 | $29.10 | 2 |
| Carpenter, Building | Residential | $33.58 – $34.58 | $29.10 | 2 |
| Carpenter, Carpenter, Millwright, Piledriver, And Soft Floor… | Building | $45.61 | $35.31 | 1 |
| Carpenter, Carpenter, Millwright, Piledriver, And Soft Floor… | Residential | $45.61 | $35.31 | 1 |
| Carpenter, Includes Batt Insulation | Residential | $28.25 – $30.02 | $25.99 – $28.60 | 2 |
| Carpenter, Including Drywall Hanging And Batt Insulation | Residential | $24.61 – $31.32 | $15.94 – $26.23 | 2 |
| Carpenter, Lather, Piledriver, And Millwright day | Building | $31.30 – $41.36 | $18.90 | 6 |
| Carpenter, Lather, Piledriver, And Millwright | Residential | $31.30 – $41.36 | $18.90 | 4 |
| Carpenter, Lather, Soft Floor Layer | Building | $47.25 | $37.87 | 1 |
| Carpenter/drywall Hanger | Residential | $31.30 | $18.90 | 9 |
| Carpenter/lather | Building | $31.39 – $50.41 | $21.34 – $38.53 | 19 |
| Carpenter/lather | Residential | $31.55 | $18.90 | 1 |
| Carpenters | Residential | $30.22 | $29.10 | 1 |
| Carpet Installer | Building | $36.08 | $18.90 | 7 |
| Carpet Installer | Residential | $36.08 | $18.90 | 3 |
| Catv Installer | Building | $37.50 – $39.00 | $32.78 – $33.78 | 3 |
| Catv Installer | Residential | $39.00 | $33.78 | 1 |
| Cement Mason | Building | $39.00 | $30.60 | 3 |
| Cement Mason | Residential | $39.00 | $30.60 | 2 |
| Cement Mason And Plasterer | Building | $40.50 | $33.54 | 1 |
| Cement Mason/concrete Finisher | Building | $28.51 – $53.10 | $19.60 – $45.10 | 22 |
| Cement Mason/concrete Finisher | Heavy | $28.52 – $53.10 | $16.09 – $45.10 | 32 |
| Cement Mason/concrete Finisher | Highway | $28.52 – $53.10 | $16.09 – $45.10 | 32 |
| Cement Mason/concrete Finisher | Residential | $10.69 – $53.10 | $0.00 – $45.10 | 40 |
| Cement Mason/plasterer | Building | $22.50 – $31.91 | $9.75 – $21.93 | 2 |
| Cement Masons & Plasterers | Building | $30.83 | $18.06 | 2 |
| Cement Masons & Plasterers | Residential | $30.83 | $18.06 | 22 |
| Dredging | Heavy | $22.51 – $55.69 | $7.61 – $34.21 | 15 |
| Drywall Finisher/taper | Residential | $15.00 | $0.00 | 1 |
| Electrical Low Voltage Wiring Installer | Building | $35.27 – $40.64 | $15.65 – $23.40 | 11 |
| Electrical Low Voltage Wiring Installer | Residential | $35.27 – $36.91 | $15.65 – $20.99 | 3 |
| Electrical Low Voltage Wiring Installer, Building | Building | $36.25 – $38.44 | $19.37 – $21.65 | 4 |
| Electrical Low Voltage Wiring Installer, Building | Heavy | $38.44 | $19.37 | 1 |
| Electrical Low Voltage Wiring Installer, Building | Highway | $38.44 | $19.37 | 1 |
| Electrician | Building | $26.58 – $62.61 | $16.73 – $51.77 | 49 |
| Electrician | Heavy | $35.00 – $62.61 | $20.67 – $50.46 | 38 |
| Electrician | Highway | $35.00 – $62.61 | $20.67 – $50.46 | 38 |
| Electrician | Residential | $19.60 – $60.17 | $8.20 – $51.77 | 131 |
| Electrician Residential Construction | Building | $24.83 | $17.12 | 1 |
| Electrician Residential Construction | Residential | $24.83 | $17.12 | 1 |
| Electrician, Electrical Technician | Building | $49.70 | $38.45 | 1 |
| Electricians | Heavy | $41.25 | $21.30 | 1 |
| Electricians | Highway | $41.25 | $21.30 | 1 |
| Elevator Mechanic | Building | $56.30 – $70.68 | $38.44 | 7 |
| Elevator Mechanic | Residential | $57.99 – $70.68 | $38.44 | 2 |
| Elevator Mechanic Footnotes | Building | $57.99 – $70.68 | $38.44 | 8 |
| Elevator Mechanic Footnotes | Heavy | $70.68 | $38.44 | 1 |
| Elevator Mechanic Footnotes | Highway | $70.68 | $38.44 | 1 |
| Elevator Mechanic Footnotes | Residential | $57.99 – $70.68 | $38.44 | 7 |
| Elevator Mechanic Mchenry County) Footnotes | Building | $61.96 | $38.44 | 1 |
| Elevator Mechanic Mchenry County) Footnotes | Residential | $61.96 | $38.44 | 1 |
| Fire Stop Technician | Building | $36.73 – $44.02 | $31.21 – $32.76 | 7 |
| Fire Stop Technician | Heavy | $44.02 | $32.76 | 1 |
| Fire Stop Technician | Highway | $44.02 | $32.76 | 1 |
| Fire Stop Technician | Residential | $44.02 | $32.76 | 3 |
| Floor Layer | Residential | $18.05 | $2.64 | 1 |
| Glazier | Building | $32.86 – $51.55 | $19.44 – $44.09 | 18 |
| Glazier | Heavy | $51.55 | $44.09 | 1 |
| Glazier | Highway | $51.55 | $44.09 | 1 |
| Glazier | Residential | $39.74 – $51.55 | $22.73 – $44.09 | 8 |
| Hazardous Material Handler | Building | $34.43 – $41.27 | $31.21 – $32.76 | 7 |
| Hazardous Material Handler | Heavy | $41.27 | $32.76 | 1 |
| Hazardous Material Handler | Highway | $41.27 | $32.76 | 1 |
| Hazardous Material Handler | Residential | $41.27 | $32.76 | 3 |
| Hod Carrier | Heavy | $34.14 | $30.59 | 1 |
| Hod Carrier | Highway | $34.14 | $30.59 | 1 |
| Hydraulic Dredging day | Heavy | $22.51 – $26.49 | $7.61 | 4 |
| Ironworker | Building | $35.34 – $62.71 | $25.80 – $47.38 | 34 |
| Ironworker | Heavy | $35.34 – $62.71 | $25.80 – $47.38 | 35 |
| Ironworker | Highway | $35.34 – $62.71 | $25.80 – $47.38 | 35 |
| Ironworker | Residential | $36.20 – $62.71 | $29.65 – $47.38 | 22 |
| Ironworker, Ornamental | Building | $59.26 | $44.81 | 1 |
| Ironworker, Ornamental | Heavy | $59.26 | $44.81 | 1 |
| Ironworker, Ornamental | Highway | $59.26 | $44.81 | 1 |
| Ironworker, Ornamental | Residential | $59.26 | $44.81 | 1 |
| Laborer | Building | $7.25 – $54.00 | $0.00 – $39.11 | 132 |
| Laborer | Heavy | $7.25 – $54.00 | $0.00 – $39.11 | 126 |
| Laborer | Highway | $7.25 – $54.00 | $0.00 – $39.11 | 126 |
| Laborer | Residential | $7.25 – $54.00 | $0.00 – $39.11 | 119 |
| Laborer Group Asbestos Abatement Worker And Hazardous Waste… | Building | $42.54 | $32.42 | 1 |
| Laborer Group Asbestos Abatement Worker And Hazardous Waste… | Heavy | $42.54 | $32.42 | 1 |
| Laborer Group Asbestos Abatement Worker And Hazardous Waste… | Highway | $42.54 | $32.42 | 1 |
| Laborer, Building & Residential | Building | $53.00 – $54.00 | $39.11 | 12 |
| Laborer, Building & Residential | Heavy | $53.00 – $54.00 | $39.11 | 12 |
| Laborer, Building & Residential | Highway | $53.00 – $54.00 | $39.11 | 12 |
| Laborer, Building & Residential | Residential | $53.00 – $54.00 | $39.11 | 12 |
| Laborer, Compressed Air | Building | $54.00 – $57.00 | $39.11 | 5 |
| Laborer, Compressed Air | Heavy | $54.00 – $57.00 | $39.11 | 6 |
| Laborer, Compressed Air | Highway | $54.00 – $57.00 | $39.11 | 6 |
| Laborer, Compressed Air | Residential | $54.00 – $57.00 | $39.11 | 5 |
| Laborer, Compressed Air, 0-15 Lbs | Heavy | $54.00 | $39.11 | 1 |
| Laborer, Compressed Air, 0-15 Lbs | Highway | $54.00 | $39.11 | 1 |
| Laborer, Compressed Air, 16-20 Lbs | Heavy | $54.50 | $39.11 | 1 |
| Laborer, Compressed Air, 16-20 Lbs | Highway | $54.50 | $39.11 | 1 |
| Laborer, Compressed Air, 21-26 Lbs | Heavy | $55.00 | $39.11 | 1 |
| Laborer, Compressed Air, 21-26 Lbs | Highway | $55.00 | $39.11 | 1 |
| Laborer, Compressed Air, 27-33 Lbs | Heavy | $56.00 | $39.11 | 1 |
| Laborer, Compressed Air, 27-33 Lbs | Highway | $56.00 | $39.11 | 1 |
| Laborer, Demolition/wrecking | Building | $48.00 – $53.00 | $39.11 | 3 |
| Laborer, Demolition/wrecking | Heavy | $48.00 – $53.00 | $39.11 | 3 |
| Laborer, Demolition/wrecking | Highway | $48.00 – $53.00 | $39.11 | 3 |
| Laborer, Demolition/wrecking | Residential | $48.00 – $53.00 | $39.11 | 3 |
| Laborer, Heavy & Highway | Building | $51.40 – $51.68 | $39.11 | 5 |
| Laborer, Heavy & Highway | Heavy | $51.40 – $51.68 | $39.11 | 5 |
| Laborer, Heavy & Highway | Highway | $51.40 – $51.68 | $39.11 | 5 |
| Laborer, Heavy & Highway | Residential | $51.40 – $51.68 | $39.11 | 5 |
| Laborer, Sewer | Building | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Sewer | Heavy | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Sewer | Highway | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Sewer | Residential | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Sewer Construction | Heavy | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Sewer Construction | Highway | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Tunnel | Building | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Tunnel | Heavy | $53.00 – $53.35 | $39.11 | 10 |
| Laborer, Tunnel | Highway | $53.00 – $53.35 | $39.11 | 10 |
| Laborer, Tunnel | Residential | $53.00 – $53.35 | $39.11 | 5 |
| Laborer, Unskilled | Residential | $8.41 – $32.19 | $0.00 – $35.08 | 18 |
| Laborer, Unskilled, Moultrie | Residential | $28.09 – $28.39 | $26.78 – $26.81 | 2 |
| Laborers | Building | $28.56 – $36.88 | $24.10 – $35.08 | 49 |
| Laborers | Heavy | $29.26 – $37.83 | $27.30 – $35.08 | 48 |
| Laborers | Highway | $29.26 – $37.83 | $27.30 – $35.08 | 48 |
| Laborers | Residential | $9.00 – $36.88 | $0.00 – $35.08 | 35 |
| Landscape Laborer | Residential | $20.49 – $33.82 | $9.85 – $28.44 | 8 |
| Landscape Laborer- Highway Construction | Building | $31.08 – $47.04 | $23.60 – $36.31 | 4 |
| Landscape Laborer- Highway Construction | Heavy | $31.08 – $47.04 | $23.60 – $36.31 | 4 |
| Landscape Laborer- Highway Construction | Highway | $31.08 – $47.04 | $23.60 – $36.31 | 4 |
| Landscape Laborer- Highway Construction | Residential | $31.08 – $47.04 | $23.60 – $36.31 | 4 |
| Landscape Laborer-highway Construction | Building | $35.23 – $39.44 | $28.10 – $32.54 | 2 |
| Landscape Laborer-highway Construction | Heavy | $35.23 – $39.44 | $28.10 – $32.54 | 2 |
| Landscape Laborer-highway Construction | Highway | $35.23 – $39.44 | $28.10 – $32.54 | 2 |
| Landscape Laborer-highway Construction | Residential | $35.23 – $39.44 | $28.10 – $32.54 | 2 |
| Line Construction | Building | $48.44 – $62.10 | $29.09 – $37.29 | 4 |
| Line Construction | Heavy | $34.64 – $66.70 | $18.43 – $37.29 | 75 |
| Line Construction | Highway | $34.64 – $66.70 | $18.43 – $37.29 | 75 |
| Line Construction | Residential | $48.44 – $62.10 | $29.09 – $37.29 | 4 |
| Line Construction, Groundman Equipment Operator | Heavy | $41.61 | $20.73 | 1 |
| Line Construction, Groundman Equipment Operator | Highway | $41.61 | $20.73 | 1 |
| Marble & Tile Setter And Terrazzo Worker | Building | $25.78 – $38.52 | $18.51 – $24.48 | 6 |
| Marble & Tile Setter And Terrazzo Worker | Residential | $37.60 | $24.48 | 1 |
| Marble Finisher | Building | $33.95 | $26.03 | 3 |
| Marble Finisher | Heavy | $33.95 | $26.03 | 1 |
| Marble Finisher | Highway | $33.95 | $26.03 | 1 |
| Marble Finisher | Residential | $33.95 | $26.03 | 3 |
| Marble Finisher, Terrazzo Finisher And Tile Finisher | Building | $29.75 | $20.23 | 1 |
| Marble Mason | Building | $44.63 | $26.83 | 1 |
| Marble Mason | Heavy | $44.63 | $26.83 | 1 |
| Marble Mason | Highway | $44.63 | $26.83 | 1 |
| Marble Mason | Residential | $44.63 | $26.83 | 1 |
| Marble Setter | Building | $42.98 – $47.71 | $21.79 – $33.20 | 3 |
| Marble Setter | Residential | $44.63 – $47.71 | $26.83 – $33.20 | 2 |
| Marble Setter, Terrazzo Worker & Tile Setter | Building | $31.74 – $32.53 | $17.87 – $19.38 | 2 |
| Marble, Terrazzo And Tile Finisher | Building | $30.24 – $32.13 | $17.87 – $20.70 | 4 |
| Marble, Tile & Terrazzo Finisher | Building | $30.70 – $35.69 | $18.51 – $21.09 | 3 |
| Marble, Tile & Terrazzo Finisher | Residential | $30.70 | $18.51 | 1 |
| Marble, Tile & Terrazzo Workers | Building | $29.60 – $32.87 | $13.33 – $21.09 | 4 |
| Marble, Tile & Terrazzo Workers | Residential | $32.20 | $18.51 | 2 |
| Mechanic | Heavy | $0.00 – $75.45 | $0.00 – $51.10 | 62 |
| Millwright | Building | $33.06 – $51.81 | $29.36 – $33.61 | 11 |
| Millwright | Residential | $33.06 | $29.36 – $29.97 | 3 |
| Operator | Building | $30.05 – $68.80 | $26.00 – $53.05 | 46 |
| Operator | Heavy | $30.05 – $68.80 | $26.00 – $53.05 | 46 |
| Operator | Highway | $30.05 – $68.80 | $26.00 – $53.05 | 46 |
| Operator | Residential | $30.05 – $68.80 | $26.00 – $53.05 | 54 |
| Operators- Building And Highway Construction | Building | $37.55 | $9.50 | 1 |
| Operators- Building And Highway Construction | Heavy | $37.55 | $9.50 | 1 |
| Operators- Building And Highway Construction | Highway | $37.55 | $9.50 | 1 |
| Operators- Building And Highway Construction | Residential | $37.55 | $9.50 | 1 |
| Operators- Highway Construction | Building | $37.55 | $9.50 | 1 |
| Operators- Highway Construction | Heavy | $37.55 | $9.50 | 1 |
| Operators- Highway Construction | Highway | $37.55 | $9.50 | 1 |
| Operators- Highway Construction | Residential | $37.55 | $9.50 | 1 |
| Painter | Building | $24.50 – $53.05 | $14.50 – $33.91 | 40 |
| Painter | Heavy | $25.25 – $53.05 | $14.50 – $33.91 | 44 |
| Painter | Highway | $25.25 – $53.05 | $14.50 – $33.91 | 44 |
| Painter | Residential | $21.50 – $53.05 | $14.50 – $33.91 | 65 |
| Painter Epoxy Or Toxic-lead-based Paint Work-$1.00 Premimum | Residential | $27.30 – $31.39 | $20.07 – $21.58 | 7 |
| Painter Epoxy Or Toxic-lead-based Paint Work-$1.00 Premimum… | Residential | $29.73 | $20.58 | 2 |
| Painter, Excluding Drywall Finishing | Residential | $40.00 | $26.90 | 1 |
| Painter, Including Drywall Finishing | Residential | $35.29 | $14.50 | 1 |
| Piledriver | Building | $32.39 – $38.11 | $21.34 – $29.94 | 16 |
| Piledriverman | Heavy | $32.55 – $37.85 | $21.92 – $31.16 | 19 |
| Piledriverman | Highway | $32.55 – $37.85 | $21.92 – $31.16 | 19 |
| Pipefitter | Building | $41.10 – $55.00 | $27.59 – $38.62 | 7 |
| Pipefitter | Heavy | $55.00 | $38.62 | 1 |
| Pipefitter | Highway | $55.00 | $38.62 | 1 |
| Pipefitter | Residential | $41.10 – $55.00 | $27.59 – $38.62 | 5 |
| Pipefitter/steamfitter | Building | $43.89 | $25.71 | 1 |
| Plasterer | Building | $28.50 – $49.65 | $19.12 – $42.17 | 23 |
| Plasterer | Heavy | $37.90 – $42.25 | $26.65 – $37.66 | 3 |
| Plasterer | Highway | $37.90 – $42.25 | $26.65 – $37.66 | 3 |
| Plasterer | Residential | $28.50 – $49.65 | $19.12 – $42.17 | 13 |
| Plumber | Building | $42.70 – $60.50 | $21.25 – $39.02 | 10 |
| Plumber | Heavy | $60.50 | $39.02 | 1 |
| Plumber | Highway | $60.50 | $39.02 | 1 |
| Plumber | Residential | $14.61 – $60.50 | $2.80 – $39.02 | 46 |
| Plumber And Steamfitter | Building | $37.96 – $54.31 | $18.87 – $25.71 | 4 |
| Plumber, Excluding HVAC | Residential | $37.88 | $25.71 | 1 |
| Plumber, Pipefitter, Steamfitter | Building | $37.88 – $50.85 | $21.43 – $27.75 | 7 |
| Plumber, Pipefitter, Steamfitter | Residential | $37.88 – $50.85 | $25.71 – $27.75 | 7 |
| Plumber, Pipefitter, Steamfitter, Including HVAC | Residential | $29.21 – $30.71 | $11.61 | 10 |
| Plumber/pipefitter | Building | $41.20 – $55.54 | $21.45 – $31.43 | 11 |
| Plumber/pipefitter | Residential | $41.20 – $55.54 | $21.25 – $31.43 | 10 |
| Plumbers And Pipefitters | Residential | $46.50 | $27.80 | 1 |
| Pointer, Cleaner And Caulker | Building | $45.42 | $24.06 | 1 |
| Pointer, Cleaner And Caulker | Heavy | $45.42 | $24.06 | 1 |
| Pointer, Cleaner And Caulker | Highway | $45.42 | $24.06 | 1 |
| Pointer, Cleaner And Caulker | Residential | $45.42 | $24.06 | 1 |
| Power Equipment Operator | Building | $34.30 – $51.70 | $28.75 – $39.10 | 46 |
| Power Equipment Operator | Heavy | $30.05 – $63.00 | $26.00 – $51.05 | 70 |
| Power Equipment Operator | Highway | $30.05 – $63.00 | $26.00 – $51.05 | 70 |
| Power Equipment Operator | Residential | $34.30 – $51.70 | $28.75 – $39.10 | 36 |
| Power Equipment Operatorgroup 1 | Heavy | $42.45 | $34.95 | 1 |
| Power Equipment Operatorgroup 1 | Highway | $42.45 | $34.95 | 1 |
| Roofer | Building | $30.50 – $50.25 | $17.86 – $30.43 | 23 |
| Roofer | Heavy | $50.25 | $30.43 | 1 |
| Roofer | Highway | $50.25 | $30.43 | 1 |
| Roofer | Residential | $12.67 – $50.25 | $0.00 – $30.43 | 48 |
| Sheet Metal Worker | Building | $26.73 – $56.35 | $17.44 – $42.91 | 26 |
| Sheet Metal Worker | Heavy | $31.32 – $49.10 | $37.02 – $42.91 | 2 |
| Sheet Metal Worker | Highway | $31.32 – $49.10 | $37.02 – $42.91 | 2 |
| Sheet Metal Worker | Residential | $13.29 – $56.35 | $3.07 – $42.91 | 68 |
| Sprinkler Fitter | Building | $50.51 – $63.25 | $30.25 – $36.50 | 3 |
| Sprinkler Fitter | Heavy | $63.25 | $36.50 | 1 |
| Sprinkler Fitter | Highway | $63.25 | $36.50 | 1 |
| Sprinkler Fitter | Residential | $50.51 – $63.25 | $30.25 – $36.50 | 3 |
| Sprinkler Fitters | Building | $54.23 | $31.45 | 1 |
| Sprinkler Fitters | Residential | $54.23 | $31.45 | 1 |
| Steamfitter | Building | $49.00 | $24.42 | 2 |
| Steamfitter | Residential | $49.00 | $24.42 | 2 |
| Terrazzo Worker/setter | Building | $17.55 – $48.38 | $0.00 – $30.79 | 4 |
| Terrazzo Worker/setter | Heavy | $44.38 | $25.84 | 1 |
| Terrazzo Worker/setter | Highway | $44.38 | $25.84 | 1 |
| Terrazzo Worker/setter | Residential | $17.55 – $48.38 | $0.00 – $30.79 | 7 |
| Tile Finisher | Building | $35.25 – $42.80 | $18.00 – $26.97 | 4 |
| Tile Finisher | Heavy | $38.56 | $22.10 | 1 |
| Tile Finisher | Highway | $38.56 | $22.10 | 1 |
| Tile Finisher | Residential | $38.56 – $42.80 | $21.79 – $26.97 | 3 |
| Tile Layer | Building | $38.07 | $20.21 | 1 |
| Tile Setter | Building | $11.70 – $49.75 | $1.60 – $30.79 | 4 |
| Tile Setter | Heavy | $45.49 | $25.72 | 1 |
| Tile Setter | Highway | $45.49 | $25.72 | 1 |
| Tile Setter | Residential | $11.70 – $49.75 | $1.60 – $30.79 | 8 |
| Traffic Control Device Monitor | Building | $43.40 | $22.71 | 1 |
| Traffic Control Device Monitor | Heavy | $43.40 | $22.71 | 3 |
| Traffic Control Device Monitor | Highway | $43.40 | $22.71 | 3 |
| Traffic Control Device Monitor | Residential | $43.40 | $22.71 | 1 |
| Truck Driver | Building | $38.55 – $54.64 | $0.25 – $30.27 | 174 |
| Truck Driver | Heavy | $38.55 – $54.64 | $0.25 – $30.27 | 180 |
| Truck Driver | Highway | $38.55 – $54.64 | $0.25 – $30.27 | 180 |
| Truck Driver | Residential | $43.24 – $54.64 | $0.25 – $30.27 | 151 |
| Truck Driver, 2 Or 3 Axle Trucks | Heavy | $44.82 | $0.25 | 1 |
| Truck Driver, 2 Or 3 Axle Trucks | Highway | $44.82 | $0.25 | 1 |
| Truck Driver, 4 Axle Trucks | Heavy | $44.97 | $0.25 | 1 |
| Truck Driver, 4 Axle Trucks | Highway | $44.97 | $0.25 | 1 |
| Truck Driver, 5 Axle Trucks | Heavy | $45.17 | $0.25 | 1 |
| Truck Driver, 5 Axle Trucks | Highway | $45.17 | $0.25 | 1 |
| Truck Driver, 6 Axle Trucks | Heavy | $45.37 | $0.25 | 1 |
| Truck Driver, 6 Axle Trucks | Highway | $45.37 | $0.25 | 1 |
The determinations
Read the scope before the table: a determination covers the counties and construction types listed here, and the contract that incorporates it fixes its version.
| Determination | Newest effective | Types | Counties | Rate lines |
|---|---|---|---|---|
| IL20260001 Mod 7 | Nov 12, 2026 | Building | 46 | 325 |
| IL20260002 Mod 4 | May 18, 2026 | Building | 41 | 198 |
| IL20260003 Mod 1 | May 18, 2026 | Building, Residential | 2 | 35 |
| IL20260004 Mod 2 | May 18, 2026 | Building, Residential | 1 | 34 |
| IL20260005 Mod 1 | May 18, 2026 | Building, Residential | 1 | 32 |
| IL20260006 Mod 2 | Nov 5, 2026 | Building, Residential | 1 | 31 |
| IL20260007 Mod 2 | May 18, 2026 | Building, Residential | 2 | 81 |
| IL20260008 Mod 4 | Nov 12, 2026 | Building, Residential | 7 | 119 |
| IL20260009 Mod 4 | Nov 12, 2026 | Building, Heavy, Highway, Residential | 1 | 88 |
| IL20260010 Mod 1 | May 18, 2026 | Residential | 1 | 20 |
| IL20260011 Mod 3 | Nov 12, 2026 | Heavy, Highway | 8 | 104 |
| IL20260012 Mod 3 | Oct 29, 2026 | Heavy, Highway | 10 | 84 |
| IL20260013 Mod 2 | Nov 12, 2026 | Heavy, Highway | 10 | 87 |
| IL20260014 Mod 2 | Jul 30, 2026 | Heavy, Highway | 10 | 65 |
| IL20260015 Mod 2 | Jul 30, 2026 | Heavy, Highway | 24 | 98 |
| IL20260016 Mod 2 | Jul 30, 2026 | Heavy, Highway | 28 | 103 |
| IL20260017 Mod 6 | Oct 29, 2026 | Heavy, Highway | 11 | 145 |
| IL20260018 Mod 2 | Jun 17, 2026 | Heavy | 102 | 68 |
| IL20260019 Mod 1 | May 18, 2026 | Heavy | 102 | 13 |
| IL20260020 Mod 2 | Jul 14, 2026 | Building, Heavy, Highway, Residential | 19 | 90 |
| IL20260021 Mod 1 | May 18, 2026 | Residential | 1 | 11 |
| IL20260022 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260023 Mod 2 | May 18, 2026 | Residential | 20 | 38 |
| IL20260024 Mod 3 | May 18, 2026 | Residential | 1 | 11 |
| IL20260025 Mod 2 | May 18, 2026 | Residential | 1 | 15 |
| IL20260026 Mod 1 | May 18, 2026 | Residential | 13 | 60 |
| IL20260027 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260028 Mod 1 | May 18, 2026 | Residential | 1 | 12 |
| IL20260029 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260030 Mod 2 | May 18, 2026 | Residential | 1 | 8 |
| IL20260031 Mod 1 | May 18, 2026 | Residential | 1 | 13 |
| IL20260032 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260033 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260034 Mod 1 | May 18, 2026 | Residential | 1 | 10 |
| IL20260035 Mod 1 | May 18, 2026 | Residential | 1 | 15 |
| IL20260036 Mod 1 | May 18, 2026 | Residential | 1 | 12 |
| IL20260037 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260038 Mod 1 | May 18, 2026 | Residential | 1 | 6 |
| IL20260039 Mod 1 | May 18, 2026 | Residential | 1 | 12 |
| IL20260040 Mod 2 | May 18, 2026 | Residential | 1 | 14 |
| IL20260041 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260042 Mod 2 | May 18, 2026 | Residential | 1 | 14 |
| IL20260043 Mod 1 | May 18, 2026 | Residential | 1 | 11 |
| IL20260044 Mod 1 | May 18, 2026 | Residential | 1 | 9 |
| IL20260045 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260046 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260047 Mod 2 | May 18, 2026 | Residential | 1 | 9 |
| IL20260048 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260049 Mod 2 | May 18, 2026 | Residential | 1 | 36 |
| IL20260050 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260051 Mod 2 | May 18, 2026 | Residential | 1 | 11 |
| IL20260052 Mod 2 | May 18, 2026 | Residential | 1 | 18 |
| IL20260053 Mod 1 | May 18, 2026 | Residential | 1 | 20 |
| IL20260054 Mod 2 | May 18, 2026 | Residential | 2 | 21 |
| IL20260055 Mod 1 | May 18, 2026 | Residential | 1 | 26 |
| IL20260056 Mod 1 | May 18, 2026 | Residential | 1 | 13 |
| IL20260057 Mod 2 | May 18, 2026 | Residential | 1 | 10 |
| IL20260058 Mod 1 | May 18, 2026 | Residential | 1 | 10 |
| IL20260059 Mod 1 | May 18, 2026 | Residential | 1 | 11 |
| IL20260060 Mod 1 | May 18, 2026 | Residential | 3 | 17 |
| IL20260061 Mod 1 | May 18, 2026 | Residential | 1 | 10 |
| IL20260062 Mod 1 | May 18, 2026 | Residential | 1 | 11 |
| IL20260063 Mod 1 | May 18, 2026 | Residential | 1 | 9 |
| IL20260064 Mod 1 | May 18, 2026 | Residential | 1 | 11 |
| IL20260065 Mod 1 | May 18, 2026 | Residential | 1 | 20 |
| IL20260066 Mod 3 | May 18, 2026 | Residential | 3 | 12 |
| IL20260067 Mod 1 | May 18, 2026 | Residential | 1 | 13 |
| IL20260068 Mod 1 | May 18, 2026 | Residential | 1 | 14 |
| IL20260069 Mod 1 | May 18, 2026 | Residential | 1 | 12 |
| IL20260070 Mod 2 | May 18, 2026 | Residential | 1 | 10 |
How to use a federal rate on a Illinois job
- Confirm which law governs. Federal or federally assisted money brings Davis-Bacon and the determination. State money brings the state schedule. A job with both must satisfy both.
- Take the determination from the contract. The number and modification printed there control, even if a newer determination exists.
- Split base from fringe. Overtime is 1.5× the basic hourly rate; the fringe obligation continues and is not multiplied.
- Map it onto the payroll. Field 5 takes the determination and modification, columns 6A–6C take base, plan credit and cash fringe — see the WH-347 guide.
Questions
What is the prevailing wage in Illinois?
There is no single number. 70 active federal determinations cover 102 counties with 2536 rate lines; the rate depends on the classification, the county, the construction type and the determination your contract incorporates.
Are these the rates for state-funded work?
No. These are federal Davis-Bacon determinations. Illinois state public works use the state agency's own schedule, which is a separate set and often higher.
Why do some counties show several determinations?
Because building, heavy, highway and residential work are published separately, and a county is usually named in more than one of them. Use the construction type that matches the work, not the one with the highest rate.
Turn this rate into a checked payroll
Pick the county and type once, and WageDecoder fills the determination number, checks the classification, the fringe credit and the overtime base, then writes the official WH-347. Free, no account, nothing uploaded.