Prevailing wage rates in Washington
Every active federal Davis-Bacon determination that covers Washington: 97 determinations, 39 counties, 3484 rate lines, newest effective Nov 5, 2026. Pick your county below, or read the rate ranges by trade.
What this page covers
State-funded work is separate. Washington public works are governed by RCW 39.12 (Prevailing Wages on Public Works) and administered by Department of Labor & Industries, Industrial Statistician, covering contracts with no dollar threshold. The state form is the Certified Payroll Report (online) + Intent and Affidavit. A federal determination does not replace the state rate, and on a project covered by both laws you must satisfy both — usually the higher rate plus each law's paperwork.
State rules, the filing clock and the penalty: Washington certified payroll.
Counties covered
Each row is a Washington county that appears in an active federal determination. The count is the number of determinations naming that county — usually one per construction type.
| County | Determinations | Construction types | Newest effective | Look up |
|---|---|---|---|---|
| Adams | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Asotin | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Benton | 6 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Chelan | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Clallam | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Clark | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Columbia | 5 | Highway, Heavy, Residential, Building | Nov 5, 2026 | Rates → |
| Cowlitz | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Douglas | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Ferry | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Franklin | 6 | Highway, Building, Heavy, Residential | Nov 5, 2026 | Rates → |
| Garfield | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Grant | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Grays Harbor | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Island | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Jefferson | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| King | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Kitsap | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Kittitas | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Klickitat | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Lewis | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Lincoln | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Mason | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Okanogan | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Pacific | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Pend Oreille | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Pierce | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| San Juan | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Skagit | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Skamania | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Snohomish | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Spokane | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Stevens | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Thurston | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Wahkiakum | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Walla Walla | 5 | Highway, Heavy, Residential, Building | Nov 5, 2026 | Rates → |
| Whatcom | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
| Whitman | 5 | Highway, Building, Heavy, Residential | Jun 16, 2026 | Rates → |
| Yakima | 5 | Highway, Heavy, Residential, Building | Jun 16, 2026 | Rates → |
Rates by trade and construction type
These are the ranges across every Washington county in the current determinations. A range means the same classification carries different rates in different counties, or the determination lists regional sub-rates — the exact figure for a job comes from the determination that names that county.
| Classification | Type | Basic hourly rate | Fringe | Rate lines |
|---|---|---|---|---|
| Asbestos Worker/heat & Frost Insulator | Building | $44.51 – $75.37 | $18.82 – $22.89 | 11 |
| Asbestos Worker/heat & Frost Insulator | Heavy | $44.51 | $22.89 | 1 |
| Asbestos Worker/heat & Frost Insulator | Highway | $44.51 | $22.89 | 1 |
| Boilermaker | Building | $43.83 | $32.56 | 1 |
| Boilermaker | Heavy | $43.83 | $32.56 | 1 |
| Boilermaker | Highway | $43.83 | $32.56 | 1 |
| Brick Pointer/caulker/cleaner | Residential | $55.34 | $20.05 | 3 |
| Bricklayer | Building | $33.95 – $55.34 | $19.33 – $25.18 | 41 |
| Bricklayer | Heavy | $38.48 – $55.34 | $20.05 – $20.09 | 4 |
| Bricklayer | Highway | $38.48 | $20.09 | 1 |
| Bricklayer | Residential | $39.57 – $55.34 | $20.05 – $25.18 | 15 |
| Cable Splicer | Highway | $34.10 – $83.56 | $16.68 – $33.71 | 8 |
| Carpenter | Building | $44.21 – $63.98 | $16.56 – $19.13 | 41 |
| Carpenter | Heavy | $24.03 – $63.98 | $3.42 – $19.13 | 33 |
| Carpenter | Highway | $44.21 – $125.44 | $16.56 – $19.13 | 29 |
| Carpenter | Residential | $16.47 – $31.75 | $0.00 – $14.88 | 21 |
| Carpenter, Excludes Drywall Hanging, And Form Work | Building | $23.81 | $2.91 | 1 |
| Carpenter, Excludes Form Work | Building | $54.69 | $16.81 | 1 |
| Carpenter, Excludes Form Work | Heavy | $29.72 – $63.98 | $0.00 – $19.13 | 5 |
| Carpenter, Includes Form Work | Building | $54.69 | $16.81 | 2 |
| Carpenter, Includes Form Work | Heavy | $26.43 – $63.98 | $7.89 – $19.13 | 3 |
| Carpenters | Highway | $54.59 – $108.33 | $16.81 | 8 |
| Cement Mason | Highway | $46.13 – $54.66 | $20.31 – $21.27 | 7 |
| Cement Mason/concrete Finisher | Building | $21.94 – $54.16 | $0.00 – $21.27 | 41 |
| Cement Mason/concrete Finisher | Heavy | $17.21 – $54.16 | $0.00 – $21.27 | 38 |
| Cement Mason/concrete Finisher | Highway | $39.55 – $40.89 | $17.04 – $18.64 | 4 |
| Cement Mason/concrete Finisher | Residential | $27.83 – $54.16 | $0.00 – $21.27 | 21 |
| Dredging | Heavy | $35.93 – $62.47 | $16.70 – $17.40 | 21 |
| Drywall Finisher/taper | Building | $35.45 – $53.59 | $18.13 – $23.65 | 14 |
| Drywall Finisher/taper | Heavy | $35.45 | $18.13 | 1 |
| Drywall Finisher/taper | Highway | $35.45 | $18.13 | 1 |
| Drywall Finisher/taper | Residential | $15.00 | $0.00 | 1 |
| Drywall Hanger | Building | $44.21 – $54.49 | $16.81 – $17.28 | 7 |
| Drywall Hanger And Metal Stud Installer | Residential | $24.59 | $0.00 | 3 |
| Electrician | Building | $46.15 – $75.96 | $19.09 – $33.48 | 40 |
| Electrician | Heavy | $39.74 – $75.96 | $13.97 – $33.48 | 38 |
| Electrician | Highway | $42.45 – $75.96 | $19.09 – $33.48 | 10 |
| Electrician | Residential | $19.00 – $35.16 | $3.17 – $16.58 | 21 |
| Elevator Mechanic | Building | $53.78 – $67.61 | $22.86 – $38.44 | 10 |
| Elevator Mechanic | Residential | $67.61 | $38.44 | 6 |
| Fence Erector | Heavy | $15.00 | $0.00 | 4 |
| Floor Layer | Building | $42.01 | $20.20 | 7 |
| Form Worker | Building | $29.71 | $14.84 | 1 |
| Form Worker | Heavy | $37.16 – $63.98 | $14.59 – $19.13 | 5 |
| Glazier | Building | $23.07 – $61.14 | $3.99 – $23.76 | 13 |
| Glazier | Residential | $40.28 | $16.06 | 5 |
| Grade Checker | Heavy | $31.40 – $49.16 | $0.00 – $18.87 | 15 |
| Heat & Frost Insulator | Building | $39.50 – $75.37 | $14.21 – $22.36 | 20 |
| Heavy Equipment Operator | Heavy | $38.96 – $61.56 | $22.45 – $27.57 | 12 |
| Hod Carrier | Highway | $38.05 | $16.75 | 1 |
| Hydraulic Dredge | Heavy | $29.76 – $31.56 | $20.65 | 7 |
| Ironworker | Building | $41.91 – $57.94 | $32.27 – $34.52 | 39 |
| Ironworker | Heavy | $41.91 – $57.94 | $25.63 – $34.52 | 36 |
| Ironworker | Highway | $41.91 – $57.94 | $32.27 – $34.52 | 5 |
| Laborer | Building | $16.91 – $312.36 | $0.00 – $18.51 | 290 |
| Laborer | Heavy | $14.67 – $312.36 | $0.00 – $17.05 | 258 |
| Laborer | Highway | $31.19 – $312.36 | $15.60 – $17.05 | 53 |
| Laborer | Residential | $11.87 – $50.38 | $0.00 – $16.96 | 51 |
| Laborer, Mason Tender Brick | Building | $38.05 – $50.38 | $16.75 – $16.96 | 27 |
| Laborer, Mason Tender Brick | Heavy | $38.05 | $16.75 | 6 |
| Line Construction | Heavy | $37.53 – $64.17 | $17.74 – $24.88 | 45 |
| Marble Finisher | Building | $40.98 | $18.17 | 3 |
| Marble Setter | Building | $49.70 | $18.62 | 3 |
| Mason - Stone | Building | $55.34 | $20.05 | 3 |
| Metal Building Erector | Building | $11.30 | $3.58 | 4 |
| Millwright | Building | $55.39 | $22.38 | 9 |
| Millwright | Heavy | $51.09 – $61.62 | $8.85 – $22.38 | 12 |
| Millwright | Highway | $55.39 – $61.62 | $20.43 – $22.38 | 3 |
| Operator | Building | $25.53 – $63.29 | $0.00 – $27.75 | 296 |
| Operator | Heavy | $25.00 – $64.66 | $0.00 – $27.57 | 313 |
| Operator | Residential | $17.50 – $61.41 | $0.00 – $27.32 | 56 |
| Painter | Building | $17.80 – $41.24 | $0.00 – $16.27 | 59 |
| Painter | Heavy | $36.26 – $41.24 | $14.70 – $17.01 | 36 |
| Painter | Highway | $36.26 – $41.24 | $14.70 – $17.01 | 4 |
| Painter | Residential | $16.00 – $53.59 | $0.00 – $23.65 | 26 |
| Painters | Building | $40.85 | $16.68 | 3 |
| Painters | Highway | $41.19 – $41.80 | $17.09 – $20.85 | 2 |
| Piledriver | Highway | $56.06 – $65.53 | $16.81 – $19.13 | 2 |
| Piledriver Person | Heavy | $36.50 – $65.53 | $10.16 – $19.13 | 6 |
| Pipe Insulator/wrapper | Building | $24.21 | $4.07 | 8 |
| Pipefitter | Building | $47.15 – $75.21 | $27.20 – $34.91 | 41 |
| Pipefitter | Heavy | $25.98 – $75.21 | $3.98 – $33.88 | 17 |
| Plasterer | Building | $52.50 | $20.67 | 5 |
| Plumber | Building | $35.00 – $75.21 | $0.00 – $34.15 | 38 |
| Plumber | Heavy | $60.72 | $34.15 | 3 |
| Plumber | Residential | $25.86 – $32.25 | $2.76 – $7.97 | 21 |
| Plumber/pipefitter | Building | $62.95 | $33.76 | 1 |
| Plumber/pipefitter | Heavy | $62.95 | $33.76 | 1 |
| Plumber/pipefitter | Highway | $62.95 | $33.76 | 1 |
| Plumbers And Pipefitters | Building | $75.21 | $33.88 | 1 |
| Power Equipment Operator | Building | $35.91 – $63.35 | $17.15 – $27.57 | 216 |
| Power Equipment Operator | Heavy | $35.91 – $64.11 | $17.15 – $27.57 | 226 |
| Power Equipment Operator | Highway | $35.91 – $64.66 | $17.15 – $27.57 | 81 |
| Power Equipment Operators | Building | $63.35 | $27.57 | 1 |
| Roofer | Building | $26.77 – $48.01 | $0.00 – $16.47 | 28 |
| Roofer | Heavy | $34.72 | $13.31 | 1 |
| Roofer | Highway | $34.72 | $13.31 | 1 |
| Roofer | Residential | $23.12 – $26.11 | $0.00 – $2.90 | 21 |
| Roofer, Excludes Metal Roofs | Building | $27.00 – $48.01 | $0.00 – $16.44 | 12 |
| Scaffold Builder | Building | $44.06 – $50.38 | $15.60 – $16.96 | 5 |
| Sheet Metal Worker | Building | $47.76 – $69.86 | $27.70 – $33.39 | 18 |
| Sheet Metal Worker | Heavy | $47.76 – $69.86 | $27.70 – $33.39 | 4 |
| Sheet Metal Worker | Highway | $47.76 | $27.70 | 1 |
| Sheet Metal Worker | Residential | $20.84 – $56.24 | $7.30 – $32.72 | 32 |
| Sheet Metal Worker, Excludes HVAC Duct Installation | Building | $24.83 | $0.00 | 6 |
| Sheet Metal Worker, HVAC Duct Installation Only | Residential | $31.63 – $36.66 | $24.75 – $27.92 | 2 |
| Sheet Metal Worker, Includes HVAC Duct Installation | Building | $69.86 | $33.39 | 1 |
| Sheet Metal Worker, Including HVAC Duct And Metal Roof… | Residential | $52.40 – $52.84 | $31.16 – $32.72 | 2 |
| Sheetmetal Worker | Building | $45.83 – $66.05 | $27.92 – $32.72 | 20 |
| Soft Floor Layer | Building | $41.77 – $42.01 | $20.20 – $21.18 | 10 |
| Sprinkler Fitter | Building | $25.80 – $68.89 | $0.00 – $33.80 | 27 |
| Sprinkler Fitter | Heavy | $41.33 | $28.58 | 1 |
| Sprinkler Fitter | Highway | $41.33 | $28.58 | 1 |
| Sprinkler Fitter | Residential | $46.18 | $26.40 | 3 |
| Terrazzo Finisher | Building | $40.98 | $18.17 | 3 |
| Terrazzo Worker/setter | Building | $51.70 | $18.62 | 3 |
| Tile Finisher | Building | $27.26 – $40.98 | $11.99 – $18.17 | 26 |
| Tile Setter | Building | $29.86 – $49.70 | $13.95 – $21.81 | 39 |
| Traffic Control | Building | $40.88 | $16.72 | 3 |
| Traffic Control | Heavy | $27.75 – $40.88 | $0.00 – $16.90 | 36 |
| Tree Trimmer | Heavy | $22.60 – $42.57 | $16.37 – $17.97 | 36 |
| Truck Driver | Building | $23.50 – $55.43 | $6.87 – $27.52 | 68 |
| Truck Driver | Heavy | $19.33 – $55.48 | $0.00 – $27.52 | 117 |
| Truck Driver | Highway | $33.09 – $55.43 | $17.63 – $27.52 | 20 |
| Truck Driver | Residential | $20.87 – $54.68 | $5.22 – $27.52 | 102 |
| Truck Driver, Includes Dump Truck | Building | $23.50 | $6.87 | 6 |
| Truck Drivers | Highway | $33.83 – $40.88 | $20.93 | 16 |
The determinations
Read the scope before the table: a determination covers the counties and construction types listed here, and the contract that incorporates it fixes its version.
| Determination | Newest effective | Types | Counties | Rate lines |
|---|---|---|---|---|
| WA20260001 Mod 4 | Jun 16, 2026 | Highway | 39 | 209 |
| WA20260002 Mod 2 | May 20, 2026 | Building, Heavy, Highway | 2 | 52 |
| WA20260003 Mod 2 | May 18, 2026 | Building | 1 | 45 |
| WA20260021 Mod 2 | May 18, 2026 | Building | 1 | 31 |
| WA20260022 Mod 1 | May 18, 2026 | Building | 1 | 32 |
| WA20260024 Mod 2 | May 18, 2026 | Building | 1 | 31 |
| WA20260025 Mod 2 | May 18, 2026 | Building | 1 | 29 |
| WA20260026 Mod 2 | May 18, 2026 | Building | 1 | 30 |
| WA20260027 Mod 1 | May 18, 2026 | Building | 1 | 33 |
| WA20260028 Mod 1 | May 18, 2026 | Building | 1 | 32 |
| WA20260029 Mod 1 | May 18, 2026 | Building | 1 | 32 |
| WA20260030 Mod 1 | May 18, 2026 | Building | 1 | 29 |
| WA20260031 Mod 1 | May 18, 2026 | Building | 1 | 29 |
| WA20260032 Mod 1 | May 18, 2026 | Building | 1 | 26 |
| WA20260033 Mod 2 | May 18, 2026 | Building | 1 | 30 |
| WA20260034 Mod 1 | May 18, 2026 | Building | 1 | 33 |
| WA20260035 Mod 2 | May 18, 2026 | Building | 1 | 39 |
| WA20260036 Mod 1 | May 18, 2026 | Building | 1 | 40 |
| WA20260038 Mod 1 | May 18, 2026 | Building | 1 | 32 |
| WA20260040 Mod 1 | May 18, 2026 | Building | 1 | 28 |
| WA20260042 Mod 2 | May 18, 2026 | Building | 1 | 30 |
| WA20260043 Mod 2 | May 18, 2026 | Heavy | 1 | 26 |
| WA20260044 Mod 1 | May 18, 2026 | Heavy | 1 | 22 |
| WA20260045 Mod 2 | May 18, 2026 | Heavy | 1 | 26 |
| WA20260046 Mod 1 | May 18, 2026 | Heavy | 1 | 22 |
| WA20260047 Mod 1 | May 18, 2026 | Heavy | 1 | 22 |
| WA20260048 Mod 1 | May 18, 2026 | Heavy | 1 | 22 |
| WA20260049 Mod 1 | May 18, 2026 | Heavy | 1 | 24 |
| WA20260050 Mod 2 | May 20, 2026 | Heavy | 1 | 30 |
| WA20260051 Mod 1 | May 18, 2026 | Heavy | 1 | 26 |
| WA20260052 Mod 2 | May 18, 2026 | Heavy | 1 | 23 |
| WA20260053 Mod 1 | May 18, 2026 | Heavy | 1 | 20 |
| WA20260054 Mod 2 | May 18, 2026 | Heavy | 1 | 33 |
| WA20260055 Mod 1 | May 18, 2026 | Heavy | 1 | 42 |
| WA20260057 Mod 1 | May 18, 2026 | Heavy | 1 | 22 |
| WA20260059 Mod 1 | May 18, 2026 | Heavy | 1 | 28 |
| WA20260061 Mod 2 | May 18, 2026 | Heavy | 1 | 23 |
| WA20260062 Mod 2 | May 18, 2026 | Heavy | 2 | 36 |
| WA20260080 Mod 1 | May 18, 2026 | Heavy | 39 | 36 |
| WA20260081 Mod 1 | May 18, 2026 | Residential | 1 | 12 |
| WA20260082 Mod 1 | May 18, 2026 | Residential | 1 | 10 |
| WA20260083 Mod 1 | May 18, 2026 | Residential | 3 | 11 |
| WA20260084 Mod 1 | May 18, 2026 | Residential | 4 | 11 |
| WA20260085 Mod 1 | May 18, 2026 | Residential | 5 | 13 |
| WA20260086 Mod 1 | May 18, 2026 | Residential | 4 | 13 |
| WA20260087 Mod 1 | May 18, 2026 | Residential | 1 | 21 |
| WA20260088 Mod 1 | May 18, 2026 | Residential | 1 | 21 |
| WA20260089 Mod 1 | May 18, 2026 | Residential | 1 | 21 |
| WA20260090 Mod 1 | May 18, 2026 | Residential | 1 | 21 |
| WA20260091 Mod 1 | May 18, 2026 | Residential | 1 | 28 |
| WA20260092 Mod 1 | May 18, 2026 | Residential | 1 | 21 |
| WA20260093 Mod 1 | May 18, 2026 | Residential | 1 | 27 |
| WA20260094 Mod 1 | May 18, 2026 | Residential | 1 | 27 |
| WA20260095 Mod 1 | May 18, 2026 | Residential | 1 | 22 |
| WA20260096 Mod 1 | May 18, 2026 | Residential | 1 | 21 |
| WA20260097 Mod 1 | May 18, 2026 | Residential | 1 | 21 |
| WA20260098 Mod 1 | May 18, 2026 | Residential | 3 | 21 |
| WA20260099 Mod 1 | May 18, 2026 | Residential | 2 | 21 |
| WA20260100 Mod 1 | May 18, 2026 | Residential | 3 | 27 |
| WA20260101 Mod 1 | May 18, 2026 | Residential | 2 | 22 |
| WA20260102 Mod 2 | May 18, 2026 | Building | 1 | 40 |
| WA20260103 Mod 1 | May 18, 2026 | Building | 1 | 49 |
| WA20260104 Mod 2 | May 18, 2026 | Building | 1 | 40 |
| WA20260105 Mod 1 | May 18, 2026 | Building | 1 | 42 |
| WA20260106 Mod 1 | May 18, 2026 | Building | 1 | 49 |
| WA20260107 Mod 2 | May 18, 2026 | Building | 1 | 40 |
| WA20260108 Mod 1 | May 18, 2026 | Building | 1 | 64 |
| WA20260109 Mod 1 | May 18, 2026 | Building | 1 | 50 |
| WA20260110 Mod 2 | May 18, 2026 | Building | 1 | 37 |
| WA20260111 Mod 1 | May 18, 2026 | Building | 1 | 59 |
| WA20260112 Mod 1 | May 18, 2026 | Building | 1 | 46 |
| WA20260113 Mod 1 | May 18, 2026 | Building | 1 | 60 |
| WA20260114 Mod 2 | May 18, 2026 | Building | 1 | 45 |
| WA20260115 Mod 2 | May 18, 2026 | Building | 1 | 45 |
| WA20260116 Mod 1 | May 18, 2026 | Building | 1 | 65 |
| WA20260117 Mod 2 | May 18, 2026 | Building | 1 | 41 |
| WA20260118 Mod 1 | May 18, 2026 | Building | 1 | 46 |
| WA20260119 Mod 1 | May 18, 2026 | Building | 1 | 47 |
| WA20260120 Mod 1 | May 18, 2026 | Building | 2 | 45 |
| WA20260121 Mod 2 | May 18, 2026 | Heavy | 1 | 33 |
| WA20260122 Mod 1 | May 18, 2026 | Heavy | 1 | 50 |
| WA20260123 Mod 1 | May 18, 2026 | Heavy | 1 | 43 |
| WA20260124 Mod 1 | May 18, 2026 | Heavy | 1 | 50 |
| WA20260125 Mod 1 | May 18, 2026 | Heavy | 1 | 60 |
| WA20260126 Mod 1 | May 18, 2026 | Heavy | 1 | 39 |
| WA20260127 Mod 1 | May 18, 2026 | Heavy | 1 | 53 |
| WA20260128 Mod 1 | May 18, 2026 | Heavy | 1 | 42 |
| WA20260129 Mod 1 | May 18, 2026 | Heavy | 1 | 53 |
| WA20260130 Mod 2 | May 18, 2026 | Heavy | 1 | 34 |
| WA20260131 Mod 2 | May 18, 2026 | Heavy | 1 | 35 |
| WA20260132 Mod 1 | May 18, 2026 | Heavy | 1 | 43 |
| WA20260133 Mod 3 | Nov 5, 2026 | Heavy | 1 | 34 |
| WA20260134 Mod 1 | May 18, 2026 | Heavy | 1 | 42 |
| WA20260135 Mod 1 | May 18, 2026 | Heavy | 1 | 71 |
| WA20260136 Mod 2 | May 18, 2026 | Heavy | 2 | 42 |
| WA20260137 Mod 1 | May 18, 2026 | Heavy | 2 | 41 |
| WA20260138 Mod 3 | Nov 5, 2026 | Heavy | 2 | 42 |
How to use a federal rate on a Washington job
- Confirm which law governs. Federal or federally assisted money brings Davis-Bacon and the determination. State money brings the state schedule. A job with both must satisfy both.
- Take the determination from the contract. The number and modification printed there control, even if a newer determination exists.
- Split base from fringe. Overtime is 1.5× the basic hourly rate; the fringe obligation continues and is not multiplied.
- Map it onto the payroll. Field 5 takes the determination and modification, columns 6A–6C take base, plan credit and cash fringe — see the WH-347 guide.
Questions
What is the prevailing wage in Washington?
There is no single number. 97 active federal determinations cover 39 counties with 3484 rate lines; the rate depends on the classification, the county, the construction type and the determination your contract incorporates.
Are these the rates for state-funded work?
No. These are federal Davis-Bacon determinations. Washington state public works use the state agency's own schedule, which is a separate set and often higher.
Why do some counties show several determinations?
Because building, heavy, highway and residential work are published separately, and a county is usually named in more than one of them. Use the construction type that matches the work, not the one with the highest rate.
Turn this rate into a checked payroll
Pick the county and type once, and WageDecoder fills the determination number, checks the classification, the fringe credit and the overtime base, then writes the official WH-347. Free, no account, nothing uploaded.