Wage determination WA20260085, modification 1
Effective May 18, 2026. Covers 5 Washington counties for Residential work, with 13 rate lines. Base rates run $16.00–$67.61 and fringe $0.00–$38.44 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Washington are governed by the state's own schedule, which is a separate set of rates — see Washington rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | WA20260085 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Residential |
| Counties | 5 |
| Rate lines | 13 |
| Other Washington determinations | 97 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Elevator Mechanic | $67.61 | $38.44 | $106.05 | 01/01/2025 | ELEV0019-001 |
| Laborer | $50.38 | $16.96 | $67.34 | 06/01/2025 | LABO0252-001 |
| Glazier | $40.28 | $16.06 | $56.34 | 01/01/2025 | PAIN0188-006 |
| Sheet Metal Worker, Including HVAC Duct And Metal Roof Installation | $52.84 | $31.16 | $84.00 | 06/01/2025 | SHEE0066-038 |
| Sheet Metal Worker, Including HVAC Duct And Metal Roof Installation | $52.40 | $32.72 | $85.12 | 06/01/2025 | SHEE0066-038 |
| Roofer | $26.11 | $0.00 | $26.11 | 06/27/2014 | SUWA2011-005 |
| Plumber | $26.72 | $3.30 | $30.02 | 06/27/2014 | SUWA2011-005 |
| Painter | $16.00 | $0.00 | $16.00 | 06/27/2014 | SUWA2011-005 |
| Operator | $33.25 | $0.00 | $33.25 | 06/27/2014 | SUWA2011-005 |
| Electrician | $19.00 | $3.17 | $22.17 | 06/27/2014 | SUWA2011-005 |
| Cement Mason/concrete Finisher | $27.83 | $0.00 | $27.83 | 06/27/2014 | SUWA2011-005 |
| Carpenter | $20.96 | $0.00 | $20.96 | 06/27/2014 | SUWA2011-005 |
| Truck Driver | $54.68 | $27.52 | $82.20 | 06/01/2025 | TEAM0589-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a daily eight-hour test in addition to the weekly forty.
The field-by-field mapping is in the WH-347 guide.