Wage determination WA20260080, modification 1
Effective May 18, 2026. Covers 39 Washington counties for Heavy work, with 36 rate lines. Base rates run $29.76–$64.11 and fringe $16.70–$27.32 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Washington are governed by the state's own schedule, which is a separate set of rates — see Washington rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | WA20260080 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 39 |
| Rate lines | 36 |
| Other Washington determinations | 97 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Dredging | $37.35 | $17.40 | $54.75 | 06/01/2014 | ENGI0302-030 |
| Dredging | $36.93 | $17.40 | $54.33 | 06/01/2014 | ENGI0302-030 |
| Dredging | $38.39 | $17.40 | $55.79 | 06/01/2014 | ENGI0302-030 |
| Dredging | $37.35 | $17.40 | $54.75 | 06/01/2014 | ENGI0302-030 |
| Dredging | $36.93 | $17.40 | $54.33 | 06/01/2014 | ENGI0302-030 |
| Dredging | $35.93 | $17.40 | $53.33 | 06/01/2014 | ENGI0302-030 |
| Hydraulic Dredge | $31.56 | $20.65 | $52.21 | 06/01/2021 | ENGI0302-128 |
| Hydraulic Dredge | $31.29 | $20.65 | $51.94 | 06/01/2021 | ENGI0302-128 |
| Hydraulic Dredge | $31.01 | $20.65 | $51.66 | 06/01/2021 | ENGI0302-128 |
| Hydraulic Dredge | $30.85 | $20.65 | $51.50 | 06/01/2021 | ENGI0302-128 |
| Hydraulic Dredge | $30.69 | $20.65 | $51.34 | 06/01/2021 | ENGI0302-128 |
| Hydraulic Dredge | $30.08 | $20.65 | $50.73 | 06/01/2021 | ENGI0302-128 |
| Hydraulic Dredge | $29.76 | $20.65 | $50.41 | 06/01/2021 | ENGI0302-128 |
| Power Equipment Operator | $59.96 | $27.32 | $87.28 | 06/01/2025 | ENGI0612-002 |
| Power Equipment Operator | $64.11 | $27.32 | $91.43 | 06/01/2025 | ENGI0612-002 |
| Power Equipment Operator | $62.32 | $27.32 | $89.64 | 06/01/2025 | ENGI0612-002 |
| Power Equipment Operator | $60.63 | $27.32 | $87.95 | 06/01/2025 | ENGI0612-002 |
| Power Equipment Operator | $59.96 | $27.32 | $87.28 | 06/01/2025 | ENGI0612-013 |
| Power Equipment Operator | $64.11 | $27.32 | $91.43 | 06/01/2025 | ENGI0612-013 |
| Power Equipment Operator | $62.32 | $27.32 | $89.64 | 06/01/2025 | ENGI0612-013 |
| Power Equipment Operator | $60.63 | $27.32 | $87.95 | 06/01/2025 | ENGI0612-013 |
| Dredging | $57.82 | $16.70 | $74.52 | 01/01/2024 | ENGI0701-003 |
| Dredging | $54.82 | $16.70 | $71.52 | 01/01/2024 | ENGI0701-003 |
| Dredging | $51.82 | $16.70 | $68.52 | 01/01/2024 | ENGI0701-003 |
| Dredging | $62.47 | $16.70 | $79.17 | 01/01/2024 | ENGI0701-003 |
| Dredging | $59.47 | $16.70 | $76.17 | 01/01/2024 | ENGI0701-003 |
| Dredging | $56.47 | $16.70 | $73.17 | 01/01/2024 | ENGI0701-003 |
| Dredging | $62.47 | $16.70 | $79.17 | 01/01/2024 | ENGI0701-003 |
| Dredging | $59.47 | $16.70 | $76.17 | 01/01/2024 | ENGI0701-003 |
| Dredging | $56.47 | $16.70 | $73.17 | 01/01/2024 | ENGI0701-003 |
| Dredging | $53.95 | $16.70 | $70.65 | 01/01/2024 | ENGI0701-003 |
| Dredging | $50.95 | $16.70 | $67.65 | 01/01/2024 | ENGI0701-003 |
| Dredging | $47.95 | $16.70 | $64.65 | 01/01/2024 | ENGI0701-003 |
| Dredging | $59.31 | $16.70 | $76.01 | 01/01/2024 | ENGI0701-003 |
| Dredging | $56.31 | $16.70 | $73.01 | 01/01/2024 | ENGI0701-003 |
| Dredging | $53.31 | $16.70 | $70.01 | 01/01/2024 | ENGI0701-003 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a daily eight-hour test in addition to the weekly forty.
The field-by-field mapping is in the WH-347 guide.