Wage determination IL20260019, modification 1
Effective May 18, 2026. Covers 102 Illinois counties for Heavy work, with 13 rate lines. Base rates run $36.59–$55.69 and fringe $31.75–$34.21 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Illinois are governed by the state's own schedule, which is a separate set of rates — see Illinois rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | IL20260019 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 102 |
| Rate lines | 13 |
| Other Illinois determinations | 70 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Dredging | $37.65 | $34.21 | $71.86 | 01/01/2025 | SUIL2003-002 |
| Dredging | $36.59 | $31.75 | $68.34 | 01/01/2025 | SUIL2003-002 |
| Dredging | $36.59 | $31.75 | $68.34 | 01/01/2025 | SUIL2003-002 |
| Dredging | $38.57 | $31.75 | $70.32 | 01/01/2025 | SUIL2003-002 |
| Dredging | $47.02 | $34.21 | $81.23 | 01/01/2025 | SUIL2003-002 |
| Dredging | $44.78 | $34.21 | $78.99 | 01/01/2025 | SUIL2003-002 |
| Dredging | $55.54 | $31.75 | $87.29 | 01/01/2025 | SUIL2003-002 |
| Dredging | $55.54 | $31.75 | $87.29 | 01/01/2025 | SUIL2003-002 |
| Dredging | $55.69 | $31.75 | $87.44 | 01/01/2025 | SUIL2003-002 |
| Dredging | $44.78 | $34.21 | $78.99 | 01/01/2025 | SUIL2003-002 |
| Dredging | $47.70 | $31.75 | $79.45 | 01/01/2025 | SUIL2003-002 |
| Dredging | $47.70 | $31.75 | $79.45 | 01/01/2025 | SUIL2003-002 |
| Dredging | $47.83 | $31.75 | $79.58 | 01/01/2025 | SUIL2003-002 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
- Bureau
- Alexander
- Bond
- Calhoun
- Clay
- Clinton
- Effingham
- Fayette
- Franklin
- Hamilton
- Jackson
- Jefferson
- Jersey
- Johnson
- Madison
- Marion
- Massac
- Monroe
- Perry
- Pope
- Pulaski
- Randolph
- Saline
- St. Clair
- Union
- Washington
- Wayne
- Williamson
- Champaign
- De Witt
- Douglas
- Edgar
- Ford
- McLean
- Piatt
- Vermilion
- Cook
- De Kalb
- DuPage
- Kane
- Lake
- Lee
- McHenry
- Christian
- Clark
- Coles
- Crawford
- Cumberland
- Jasper
- Macon
- Moultrie
- Shelby
- Grundy
- Iroquois
- Kankakee
- Kendall
- La Salle
- Livingston
- Will
- Fulton
- Hancock
- Knox
- Marshall
- Mason
- McDonough
- Peoria
- Putnam
- Schuyler
- Stark
- Tazewell
- Woodford
- Carroll
- Henderson
- Henry
- Jo Daviess
- Mercer
- Rock Island
- Warren
- Whiteside
- Adams
- Brown
- Cass
- Greene
- Logan
- Macoupin
- Menard
- Montgomery
- Morgan
- Pike
- Sangamon
- Scott
- Edwards
- Gallatin
- Hardin
- Lawrence
- Richland
- Wabash
- White
- Boone
- Ogle
- Stephenson
- Winnebago
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.