Wage determination IL20260009, modification 4
Effective Nov 12, 2026. Covers 1 Illinois county for Building, Heavy, Highway, Residential work, with 88 rate lines. Base rates run $31.32–$70.68 and fringe $0.30–$53.05 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Illinois are governed by the state's own schedule, which is a separate set of rates — see Illinois rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | IL20260009 |
| Modification | 4 |
| Effective | Nov 12, 2026 |
| Construction types | Building, Heavy, Highway, Residential |
| Counties | 1 |
| Rate lines | 88 |
| Other Illinois determinations | 70 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $41.27 | $32.76 | $74.03 | 06/01/2024 | ASBE0017-001 |
| Fire Stop Technician | $44.02 | $32.76 | $76.78 | 06/01/2024 | ASBE0017-001 |
| Asbestos Worker/insulator | $55.02 | $35.75 | $90.77 | 06/01/2024 | ASBE0017-001 |
| Boilermaker | $53.10 | $38.54 | $91.64 | 05/01/2024 | BOIL0001-001 |
| Bricklayer | $44.88 | $26.62 | $71.50 | 06/01/2016 | BRIL0021-001 |
| Marble Mason | $44.63 | $26.83 | $71.46 | 06/01/2017 | BRIL0021-004 |
| Tile Setter | $45.49 | $25.72 | $71.21 | 06/01/2017 | BRIL0021-006 |
| Tile Finisher | $38.56 | $22.10 | $60.66 | 06/01/2017 | BRIL0021-006 |
| Terrazzo Worker/setter | $44.38 | $25.84 | $70.22 | 06/01/2017 | BRIL0021-006 |
| Marble Finisher | $33.95 | $26.03 | $59.98 | 06/01/2017 | BRIL0021-009 |
| Pointer, Cleaner And Caulker | $45.42 | $24.06 | $69.48 | 06/01/2017 | BRIL0021-012 |
| Carpenter | $52.01 | $38.85 | $90.86 | 06/01/2022 | CARP0555-001 |
| Carpenter | $52.01 | $38.85 | $90.86 | 06/01/2022 | CARP0555-001 |
| Carpenter | $45.61 | $35.31 | $80.92 | 10/01/2023 | CARP0555-002 |
| Line Construction | $48.44 | $29.09 | $77.53 | 05/26/2024 | ELEC0009-003 |
| Line Construction | $62.10 | $37.29 | $99.39 | 05/26/2024 | ELEC0009-003 |
| Electrician | $57.75 | $42.89 | $100.64 | 06/02/2025 | ELEC0134-001 |
| Electrician | $51.14 | $30.55 | $81.69 | 06/02/2025 | ELEC0134-003 |
| Elevator Mechanic Footnotes | $70.68 | $38.44 | $109.12 | 01/01/2025 | ELEV0002-001 |
| Operator | $63.20 | $53.05 | $116.25 | 06/01/2026 | ENGI0150-006 |
| Operator | $64.95 | $53.05 | $118.00 | 06/01/2026 | ENGI0150-006 |
| Operator | $67.50 | $53.05 | $120.55 | 06/01/2026 | ENGI0150-006 |
| Operator | $68.80 | $53.05 | $121.85 | 06/01/2026 | ENGI0150-006 |
| Operator | $57.80 | $51.00 | $108.80 | 06/01/2025 | ENGI0150-025 |
| Operator | $59.00 | $51.00 | $110.00 | 06/01/2025 | ENGI0150-025 |
| Operator | $60.40 | $51.00 | $111.40 | 06/01/2025 | ENGI0150-025 |
| Operator | $62.45 | $51.00 | $113.45 | 06/01/2025 | ENGI0150-025 |
| Operator | $63.00 | $51.00 | $114.00 | 06/01/2025 | ENGI0150-025 |
| Ironworker | $62.46 | $46.58 | $109.04 | 06/01/2025 | IRON0001-026 |
| Ironworker | $62.71 | $46.58 | $109.29 | 06/01/2025 | IRON0001-026 |
| Ironworker | $59.26 | $44.81 | $104.07 | 06/01/2025 | IRON0063-001 |
| Ironworker | $52.25 | $34.31 | $86.56 | 06/01/2025 | IRON0063-002 |
| Ironworker | $56.75 | $47.38 | $104.13 | 07/01/2025 | IRON0136-001 |
| Ironworker | $54.25 | $47.38 | $101.63 | 07/01/2025 | IRON0136-001 |
| Laborer, Building & Residential | $54.00 | $39.11 | $93.11 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.28 | $39.11 | $92.39 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.45 | $39.11 | $92.56 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.35 | $39.11 | $92.46 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.33 | $39.11 | $92.44 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.23 | $39.11 | $92.34 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.20 | $39.11 | $92.31 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.15 | $39.11 | $92.26 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.10 | $39.11 | $92.21 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.08 | $39.11 | $92.19 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0002-006 |
| Laborer, Building & Residential | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0002-006 |
| Laborer, Heavy & Highway | $51.40 | $39.11 | $90.51 | 06/01/2026 | LABO0002-007 |
| Laborer, Heavy & Highway | $51.68 | $39.11 | $90.79 | 06/01/2026 | LABO0002-007 |
| Laborer, Heavy & Highway | $51.55 | $39.11 | $90.66 | 06/01/2026 | LABO0002-007 |
| Laborer, Heavy & Highway | $51.48 | $39.11 | $90.59 | 06/01/2026 | LABO0002-007 |
| Laborer, Heavy & Highway | $51.40 | $39.11 | $90.51 | 06/01/2026 | LABO0002-007 |
| Laborer, Tunnel | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Tunnel | $53.35 | $39.11 | $92.46 | 06/01/2026 | LABO0002-008 |
| Laborer, Tunnel | $53.23 | $39.11 | $92.34 | 06/01/2026 | LABO0002-008 |
| Laborer, Tunnel | $53.13 | $39.11 | $92.24 | 06/01/2026 | LABO0002-008 |
| Laborer, Tunnel | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Sewer | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Sewer | $53.35 | $39.11 | $92.46 | 06/01/2026 | LABO0002-008 |
| Laborer, Sewer | $53.23 | $39.11 | $92.34 | 06/01/2026 | LABO0002-008 |
| Laborer, Sewer | $53.13 | $39.11 | $92.24 | 06/01/2026 | LABO0002-008 |
| Laborer, Sewer | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Compressed Air | $57.00 | $39.11 | $96.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Compressed Air | $56.00 | $39.11 | $95.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Compressed Air | $55.00 | $39.11 | $94.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Compressed Air | $54.50 | $39.11 | $93.61 | 06/01/2026 | LABO0002-008 |
| Laborer, Compressed Air | $54.00 | $39.11 | $93.11 | 06/01/2026 | LABO0002-008 |
| Laborer, Demolition/wrecking | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0225-001 |
| Laborer, Demolition/wrecking | $53.00 | $39.11 | $92.11 | 06/01/2026 | LABO0225-001 |
| Laborer, Demolition/wrecking | $48.00 | $39.11 | $87.11 | 06/01/2026 | LABO0225-001 |
| Painter | $53.05 | $33.91 | $86.96 | 06/01/2024 | PAIN0014-001 |
| Glazier | $51.55 | $44.09 | $95.64 | 06/01/2024 | PAIN0027-001 |
| Plasterer | $42.25 | $26.65 | $68.90 | 07/01/2015 | PLAS0005-002 |
| Cement Mason/concrete Finisher | $53.10 | $43.80 | $96.90 | 06/01/2025 | PLAS0502-001 |
| Plumber | $60.50 | $39.02 | $99.52 | 06/01/2025 | PLUM0130-001 |
| Pipefitter | $55.00 | $38.62 | $93.62 | 06/01/2023 | PLUM0597-002 |
| Roofer | $50.25 | $30.43 | $80.68 | 12/01/2024 | ROOF0011-001 |
| Sprinkler Fitter | $63.25 | $36.50 | $99.75 | 07/01/2025 | SFIL0281-001 |
| Sheet Metal Worker | $49.10 | $42.91 | $92.01 | 06/01/2022 | SHEE0073-001 |
| Sheet Metal Worker | $31.32 | $37.02 | $68.34 | 06/08/2018 | SHEE0073-002 |
| Truck Driver | $46.20 | $30.27 | $76.47 | 06/01/2025 | TEAM0731-001 |
| Truck Driver | $46.00 | $30.27 | $76.27 | 06/01/2025 | TEAM0731-001 |
| Truck Driver | $45.80 | $30.27 | $76.07 | 06/01/2025 | TEAM0731-001 |
| Truck Driver | $45.55 | $30.27 | $75.82 | 06/01/2025 | TEAM0731-001 |
| Traffic Control Device Monitor | $43.40 | $22.71 | $66.11 | 04/01/2025 | TEAM0731-002 |
| Truck Driver | $54.64 | $0.30 | $54.94 | 06/01/2025 | TEAM0786-001 |
| Truck Driver | $54.43 | $0.30 | $54.73 | 06/01/2025 | TEAM0786-001 |
| Truck Driver | $54.21 | $0.30 | $54.51 | 06/01/2025 | TEAM0786-001 |
| Truck Driver | $53.95 | $0.30 | $54.25 | 06/01/2025 | TEAM0786-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.