Wage determination CA20260009, modification 1
Effective May 18, 2026. Covers 7 California counties for Residential work, with 78 rate lines. Base rates run $7.25–$66.39 and fringe $0.00–$34.69 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in California are governed by the state's own schedule, which is a separate set of rates — see California rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | CA20260009 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Residential |
| Counties | 7 |
| Rate lines | 78 |
| Other California determinations | 28 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Electricians | $19.00 | $7.72 | $26.72 | 07/01/2022 | ELEC0100-004 |
| Electrician | $65.40 | $22.15 | $87.55 | 12/30/2024 | ELEC0428-002 |
| Electrician San Joaquin County | $49.45 | $31.96 | $81.41 | 06/01/2024 | ELEC0595-005 |
| Electrician Merced And Stanislaus Counties | $48.50 | $30.09 | $78.59 | 12/01/2024 | ELEC0684-003 |
| Operator | $63.06 | $34.69 | $97.75 | 06/30/2025 | ENGI0003-007 |
| Operator | $64.70 | $34.69 | $99.39 | 06/30/2025 | ENGI0003-007 |
| Operator | $66.39 | $34.69 | $101.08 | 06/30/2025 | ENGI0003-007 |
| Operator | $54.69 | $34.69 | $89.38 | 06/30/2025 | ENGI0003-007 |
| Operator | $56.71 | $34.69 | $91.40 | 06/30/2025 | ENGI0003-007 |
| Operator | $57.79 | $34.69 | $92.48 | 06/30/2025 | ENGI0003-007 |
| Operator | $58.88 | $34.69 | $93.57 | 06/30/2025 | ENGI0003-007 |
| Operator | $60.15 | $34.69 | $94.84 | 06/30/2025 | ENGI0003-007 |
| Operator | $61.36 | $34.69 | $96.05 | 06/30/2025 | ENGI0003-007 |
| Operator | $62.69 | $34.69 | $97.38 | 06/30/2025 | ENGI0003-007 |
| Operator | $64.09 | $34.69 | $98.78 | 06/30/2025 | ENGI0003-007 |
| Operator | $65.54 | $34.69 | $100.23 | 06/30/2025 | ENGI0003-007 |
| Operator | $49.64 | $28.56 | $78.20 | 06/30/2025 | ENGI0003-019 |
| Operator | $47.64 | $28.56 | $76.20 | 06/30/2025 | ENGI0003-019 |
| Operator | $54.25 | $28.56 | $82.81 | 06/30/2025 | ENGI0003-019 |
| Operator | $52.25 | $28.56 | $80.81 | 06/30/2025 | ENGI0003-019 |
| Operator | $57.85 | $28.56 | $86.41 | 06/30/2025 | ENGI0003-019 |
| Operator | $55.85 | $28.56 | $84.41 | 06/30/2025 | ENGI0003-019 |
| Operator | $48.65 | $25.25 | $73.90 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.48 | $25.25 | $73.73 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.31 | $25.25 | $73.56 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.19 | $25.25 | $73.44 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.08 | $25.25 | $73.33 | 07/01/2018 | ENGI0012-009 |
| Operator | $47.86 | $25.25 | $73.11 | 07/01/2018 | ENGI0012-009 |
| Operator | $47.72 | $25.25 | $72.97 | 07/01/2018 | ENGI0012-009 |
| Operator | $47.43 | $25.25 | $72.68 | 07/01/2018 | ENGI0012-009 |
| Operator | $52.65 | $25.25 | $77.90 | 07/01/2018 | ENGI0012-009 |
| Operator | $51.65 | $25.25 | $76.90 | 07/01/2018 | ENGI0012-009 |
| Operator | $50.65 | $25.25 | $75.90 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.65 | $25.25 | $74.90 | 07/01/2018 | ENGI0012-009 |
| Operator | $46.65 | $25.25 | $71.90 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.98 | $25.25 | $75.23 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.81 | $25.25 | $75.06 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.69 | $25.25 | $74.94 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.58 | $25.25 | $74.83 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.48 | $25.25 | $74.73 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.31 | $25.25 | $74.56 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.19 | $25.25 | $74.44 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.08 | $25.25 | $74.33 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.98 | $25.25 | $74.23 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.81 | $25.25 | $74.06 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.69 | $25.25 | $73.94 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.61 | $25.25 | $73.86 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.58 | $25.25 | $73.83 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.48 | $25.25 | $73.73 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.41 | $25.25 | $74.66 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.31 | $25.25 | $73.56 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.29 | $25.25 | $74.54 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.19 | $25.25 | $73.44 | 07/01/2018 | ENGI0012-009 |
| Operator | $49.18 | $25.25 | $74.43 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.08 | $25.25 | $73.33 | 07/01/2018 | ENGI0012-009 |
| Operator | $48.96 | $25.25 | $74.21 | 07/01/2018 | ENGI0012-009 |
| Operator | $47.86 | $25.25 | $73.11 | 07/01/2018 | ENGI0012-009 |
| Operator | $46.37 | $25.25 | $71.62 | 07/01/2018 | ENGI0012-009 |
| Operator | $46.08 | $25.25 | $71.33 | 07/01/2018 | ENGI0012-009 |
| Operator | $45.30 | $25.25 | $70.55 | 07/01/2018 | ENGI0012-009 |
| Painters | $43.45 | $22.80 | $66.25 | 01/01/2025 | PAIN0016-014 |
| Painter, Including Lead Abatement | $34.08 | $18.50 | $52.58 | 07/01/2023 | PAIN0036-017 |
| Soft Floor Layer Fresno, Madera And Tulare Counties | $38.53 | $23.19 | $61.72 | 01/01/2023 | PAIN0294-001 |
| Soft Floor Layer San Joaquin And Stanislaus Counties | $48.54 | $26.59 | $75.13 | 01/01/2024 | PAIN1237-004 |
| Soft Floor Layer Kern County | $45.15 | $19.43 | $64.58 | 01/01/2025 | PAIN1247-004 |
| Cement Mason/concrete Finisher | $39.20 | $19.71 | $58.91 | 07/01/2017 | PLAS0300-004 |
| Cement Mason/concrete Finisher | $47.70 | $27.07 | $74.77 | 07/01/2025 | PLAS0500-004 |
| Plumber | $48.84 | $23.58 | $72.42 | 09/01/2025 | PLUM0345-002 |
| Plumber | $44.75 | $26.20 | $70.95 | 09/01/2025 | PLUM0345-002 |
| Plumber | $48.83 | $22.73 | $71.56 | 09/01/2025 | PLUM0460-001 |
| Roofer Fresno, Kern, Madera And Tulare Counties | $45.76 | $16.86 | $62.62 | 09/01/2024 | ROOF0027-003 |
| Roofer Merced, San Joaquin And Stanislaus Counties | $49.65 | $22.19 | $71.84 | 08/01/2024 | ROOF0081-008 |
| Plasterer | $17.50 | $0.00 | $17.50 | 08/06/2001 | SUCA2001-001 |
| Lather | $15.00 | $0.00 | $15.00 | 08/06/2001 | SUCA2001-001 |
| Laborer, General | $7.25 | $0.00 | $7.25 | 08/06/2001 | SUCA2001-001 |
| Carpenter | $21.24 | $7.20 | $28.44 | 08/06/2001 | SUCA2001-001 |
| Bricklayer | $17.00 | $1.12 | $18.12 | 08/06/2001 | SUCA2001-001 |
| Brick Tender | $11.00 | $0.96 | $11.96 | 08/06/2001 | SUCA2001-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a daily eight-hour test in addition to the weekly forty.
The field-by-field mapping is in the WH-347 guide.