Wage determination NY20260002, modification 2
Effective May 18, 2026. Covers 10 New York counties for Building, Heavy, Highway work, with 120 rate lines. Base rates run $20.53–$76.12 and fringe $6.39–$55.14 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260002 |
| Modification | 2 |
| Effective | May 18, 2026 |
| Construction types | Building, Heavy, Highway |
| Counties | 10 |
| Rate lines | 120 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $41.74 | $27.58 | $69.32 | 05/01/2025 | ASBE0040-002 |
| Asbestos/insulator Worker | $41.74 | $27.58 | $69.32 | 05/01/2025 | ASBE0040-002 |
| Boilermaker | $43.34 | $27.66 | $71.00 | 01/01/2025 | BOIL0197-002 |
| Bricklayer | $41.79 | $22.33 | $64.12 | 12/03/2025 | BRNY0002-019 |
| Carpenters | $44.72 | $31.23 | $75.95 | 07/01/2025 | CARP0279-006 |
| Carpenters | $36.38 | $24.65 | $61.03 | 07/01/2025 | CARP0291-005 |
| Carpenters | $36.38 | $24.65 | $61.03 | 07/01/2025 | CARP0291-005 |
| Carpenters | $44.28 | $24.50 | $68.78 | 07/01/2025 | CARP0291-008 |
| Carpenters & Soft Floor Layers | $36.38 | $24.65 | $61.03 | 07/01/2025 | CARP0291-008 |
| Carpenters | $69.28 | $24.50 | $93.78 | 07/01/2024 | CARP0291-010 |
| Carpenters | $45.28 | $24.50 | $69.78 | 07/01/2024 | CARP0291-010 |
| Carpenters | $44.28 | $24.50 | $68.78 | 07/01/2024 | CARP0291-010 |
| Electrician | $48.00 | $32.09 | $80.09 | 06/01/2024 | ELEC0236-001 |
| Electrician | $46.50 | $40.57 | $87.07 | 04/01/2024 | ELEC0363-004 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Lighting And Traffic Signal Including Any And All Fiber… | $43.35 | $30.73 | $74.08 | 05/05/2025 | ELEC1249-007 |
| Electrician, Lighting And Traffic Signal Including Any And All Fiber… | $54.19 | $35.69 | $89.88 | 05/05/2025 | ELEC1249-007 |
| Electrician, Lighting And Traffic Signal Including Any And All Fiber… | $43.53 | $30.75 | $74.28 | 05/05/2025 | ELEC1249-007 |
| Electrician, Lighting And Traffic Signal Including Any And All Fiber… | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-007 |
| Electrician, Lighting And Traffic Signal Including Any And All Fiber… | $48.77 | $31.31 | $80.08 | 05/05/2025 | ELEC1249-007 |
| Electrician, Lighting And Traffic Signal Including Any And All Fiber… | $32.51 | $29.93 | $62.44 | 05/05/2025 | ELEC1249-007 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Elevator Constructor | $57.73 | $38.44 | $96.17 | 01/01/2025 | ELEV0035-001 |
| Elevator Mechanic | $76.12 | $38.98 | $115.10 | 01/01/2026 | ELEV0138-004 |
| Power Equipment Operator | $51.01 | $33.20 | $84.21 | 07/01/2025 | ENGI0158-008 |
| Power Equipment Operator | $55.42 | $33.20 | $88.62 | 07/01/2025 | ENGI0158-008 |
| Power Equipment Operator | $53.91 | $33.20 | $87.11 | 07/01/2025 | ENGI0158-008 |
| Power Equipment Operator | $54.93 | $33.20 | $88.13 | 07/01/2025 | ENGI0158-008 |
| Power Equipment Operators | $53.82 | $33.55 | $87.37 | 07/01/2025 | ENGI0158-026 |
| Power Equipment Operators | $58.91 | $33.55 | $92.46 | 07/01/2025 | ENGI0158-026 |
| Power Equipment Operators | $60.30 | $33.55 | $93.85 | 07/01/2025 | ENGI0158-026 |
| Power Equipment Operators | $61.80 | $33.55 | $95.35 | 07/01/2025 | ENGI0158-026 |
| Power Equipment Operators | $63.30 | $33.55 | $96.85 | 07/01/2025 | ENGI0158-026 |
| Power Equipment Operators | $56.39 | $33.55 | $89.94 | 07/01/2025 | ENGI0158-026 |
| Power Equipment Operators | $57.30 | $33.55 | $90.85 | 07/01/2025 | ENGI0158-026 |
| Ironworkers | $38.50 | $25.48 | $63.98 | 07/01/2024 | IRON0012-011 |
| Ironworkers | $38.75 | $25.48 | $64.23 | 07/01/2024 | IRON0012-011 |
| Ironworkers | $38.75 | $25.48 | $64.23 | 07/01/2024 | IRON0012-011 |
| Ironworker | $35.50 | $31.39 | $66.89 | 07/01/2025 | IRON0440-007 |
| Laborer | $48.00 | $27.15 | $75.15 | 07/01/2019 | LABO0017-001 |
| Laborer | $43.15 | $27.15 | $70.30 | 07/01/2019 | LABO0017-001 |
| Laborer | $38.90 | $27.15 | $66.05 | 07/01/2019 | LABO0017-001 |
| Laborer | $34.15 | $27.15 | $61.30 | 07/01/2019 | LABO0017-001 |
| Laborer | $43.15 | $27.15 | $70.30 | 07/01/2019 | LABO0017-001 |
| Laborer | $38.90 | $27.15 | $66.05 | 07/01/2019 | LABO0017-001 |
| Laborers Building Construction, Wagon Drill Operator | $22.90 | $20.64 | $43.54 | 07/01/2017 | LABO0035-001 |
| Laborers Building Construction, Pipelayers, Motor Mixers, Motor… | $22.65 | $20.64 | $43.29 | 07/01/2017 | LABO0035-001 |
| Laborers Building Construction, Laborers | $22.50 | $20.64 | $43.14 | 07/01/2017 | LABO0035-001 |
| Laborers Building Construction, Hazardous Waste Removal Includes… | $24.00 | $20.64 | $44.64 | 07/01/2017 | LABO0035-001 |
| Laborers Building Construction, Blasters, Form Setters, Motorbuggy… | $23.00 | $20.64 | $43.64 | 07/01/2017 | LABO0035-001 |
| Laborers Building Construction, Asbestos Removal | $24.00 | $20.64 | $44.64 | 07/01/2017 | LABO0035-001 |
| Laborers | $28.65 | $23.74 | $52.39 | 07/01/2017 | LABO0035-001 |
| Laborers | $28.45 | $23.74 | $52.19 | 07/01/2017 | LABO0035-001 |
| Laborers | $28.25 | $23.74 | $51.99 | 07/01/2017 | LABO0035-001 |
| Laborers | $28.05 | $23.74 | $51.79 | 07/01/2017 | LABO0035-001 |
| Laborer Heavy & Highway | $41.69 | $26.75 | $68.44 | 07/01/2023 | LABO0157-001 |
| Laborer Heavy & Highway | $39.79 | $26.75 | $66.54 | 07/01/2023 | LABO0157-001 |
| Laborer Heavy & Highway | $39.59 | $26.75 | $66.34 | 07/01/2023 | LABO0157-001 |
| Laborer Heavy & Highway | $39.39 | $26.75 | $66.14 | 07/01/2023 | LABO0157-001 |
| Laborer Heavy & Highway | $39.19 | $26.75 | $65.94 | 07/01/2023 | LABO0157-001 |
| Laborers | $37.51 | $26.68 | $64.19 | 07/01/2024 | LABO0190-001 |
| Laborers | $36.16 | $26.68 | $62.84 | 07/01/2024 | LABO0190-001 |
| Laborers | $44.19 | $27.65 | $71.84 | 07/01/2024 | LABO0190-002 |
| Laborers | $42.29 | $27.65 | $69.94 | 07/01/2024 | LABO0190-002 |
| Laborers | $42.09 | $27.65 | $69.74 | 07/01/2024 | LABO0190-002 |
| Laborers | $41.89 | $27.65 | $69.54 | 07/01/2024 | LABO0190-002 |
| Laborers | $41.69 | $27.65 | $69.34 | 07/01/2024 | LABO0190-002 |
| Laborers | $43.90 | $27.80 | $71.70 | 05/01/2023 | LABO0235-006 |
| Laborers | $42.80 | $27.80 | $70.60 | 05/01/2023 | LABO0235-006 |
| Laborers | $36.45 | $27.80 | $64.25 | 05/01/2023 | LABO0235-006 |
| Glazier | $37.25 | $33.54 | $70.79 | 05/01/2025 | PAIN0009-013 |
| Painters | $36.94 | $24.66 | $61.60 | 05/01/2021 | PAIN0155-002 |
| Painters | $35.94 | $24.66 | $60.60 | 05/01/2021 | PAIN0155-002 |
| Painters | $35.94 | $24.66 | $60.60 | 05/01/2021 | PAIN0155-002 |
| Painters | $35.94 | $24.66 | $60.60 | 05/01/2021 | PAIN0155-002 |
| Painters | $33.50 | $21.69 | $55.19 | 05/01/2025 | PAIN0201-001 |
| Painters | $34.50 | $21.69 | $56.19 | 05/01/2025 | PAIN0201-001 |
| Painters | $33.50 | $21.69 | $55.19 | 05/01/2025 | PAIN0201-001 |
| Painters | $34.50 | $21.69 | $56.19 | 05/01/2025 | PAIN0201-001 |
| Painters | $56.25 | $55.14 | $111.39 | 10/01/2024 | PAIN0806-002 |
| Plumber/pipefitter | $55.26 | $29.12 | $84.38 | 05/01/2025 | PLUM0007-001 |
| Plumber, Including Steamfitting | $31.40 | $31.70 | $63.10 | 05/01/2023 | PLUM0112-019 |
| Plumber/pipefitter | $44.88 | $33.60 | $78.48 | 05/01/2025 | PLUM0773-002 |
| Roofer | $30.50 | $19.84 | $50.34 | 06/01/2023 | ROOF0203-003 |
| Roofer | $38.05 | $24.27 | $62.32 | 07/01/2025 | ROOF0241-001 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $33.73 | $33.04 | $66.77 | 06/01/2019 | SHEE0083-001 |
| Truck Drivers | $41.69 | $31.42 | $73.11 | 07/01/2025 | TEAM0294-003 |
| Truck Drivers | $41.52 | $31.42 | $72.94 | 07/01/2025 | TEAM0294-003 |
| Truck Drivers | $41.38 | $31.42 | $72.80 | 07/01/2025 | TEAM0294-003 |
| Truck Drivers | $41.29 | $31.42 | $72.71 | 07/01/2025 | TEAM0294-003 |
| Truck Drivers | $41.23 | $31.42 | $72.65 | 07/01/2025 | TEAM0294-003 |
| Truck Drivers | $33.95 | $30.79 | $64.74 | 07/01/2025 | TEAM0294-004 |
| Truck Drivers | $33.65 | $30.79 | $64.44 | 07/01/2025 | TEAM0294-004 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.