Wage determination NY20260004, modification 2
Effective May 18, 2026. Covers 2 New York counties for Building, Heavy, Highway work, with 88 rate lines. Base rates run $20.53–$64.59 and fringe $6.39–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260004 |
| Modification | 2 |
| Effective | May 18, 2026 |
| Construction types | Building, Heavy, Highway |
| Counties | 2 |
| Rate lines | 88 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $38.50 | $25.04 | $63.54 | 05/01/2023 | ASBE0030-004 |
| Asbestos/insulator Worker | $43.25 | $27.29 | $70.54 | 05/01/2023 | ASBE0030-004 |
| Hazardous Material Handler | $38.50 | $25.04 | $63.54 | 05/01/2025 | ASBE0030-004 |
| Asbestos/insulator Worker | $43.25 | $27.29 | $70.54 | 05/01/2025 | ASBE0030-004 |
| Boilermaker Broome | $43.34 | $27.66 | $71.00 | 01/01/2025 | BOIL0197-004 |
| Marble, Tile And Terrazzo Finishers | $34.34 | $28.46 | $62.80 | 07/01/2025 | BRNY0003-002 |
| Marble Masons, Tile Layers, And Terrazzo Workers | $34.34 | $28.46 | $62.80 | 07/01/2025 | BRNY0003-002 |
| Cement Masons | $38.63 | $25.05 | $63.68 | 07/01/2025 | BRNY0003-002 |
| Bricklayers, Cement Masons, Stone Masons, Pointers, Caulkers And… | $34.34 | $28.46 | $62.80 | 07/01/2025 | BRNY0003-002 |
| Carpenter | $31.69 | $21.92 | $53.61 | 07/01/2025 | CARP0277-010 |
| Carpenter, Building Construction | $31.69 | $21.92 | $53.61 | 07/01/2025 | CARP0277-010 |
| Carpenter Heavy & Highway Construction Chenango County Footnotes | $44.52 | $27.16 | $71.68 | 07/01/2025 | CARP0277-010 |
| Carpenter Heavy & Highway Construction Broome County Footnotes | $39.52 | $27.16 | $66.68 | 07/01/2025 | CARP0277-010 |
| Electrician Chenango | $50.50 | $35.03 | $85.53 | 06/01/2025 | ELEC0043-003 |
| Electrician | $42.68 | $33.06 | $75.74 | 06/01/2025 | ELEC0325-002 |
| Cable Splicer | $50.43 | $33.29 | $83.72 | 06/01/2025 | ELEC0325-002 |
| Electrician | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-010 |
| Electrician | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-010 |
| Electrician | $44.93 | $30.85 | $75.78 | 05/05/2025 | ELEC1249-010 |
| Electrician | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-010 |
| Electrician | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-010 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-011 |
| Electrician, Line Construction | $63.14 | $42.82 | $105.96 | 05/05/2025 | ELEC1249-011 |
| Electrician Line Construction | $52.33 | $31.36 | $83.69 | 05/05/2025 | ELEC1249-011 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-011 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-011 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-012 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-012 |
| Electrician Line Construction Installer Repairman-teledata… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-012 |
| Elevator Mechanic Broome | $58.44 | $38.44 | $96.88 | 01/01/2025 | ELEV0062-003 |
| Power Equipment Operators | $46.54 | $32.80 | $79.34 | 07/01/2025 | ENGI0158-005 |
| Power Equipment Operators | $48.85 | $32.80 | $81.65 | 07/01/2025 | ENGI0158-005 |
| Power Equipment Operators | $49.31 | $32.80 | $82.11 | 07/01/2025 | ENGI0158-005 |
| Power Equipment Operators | $51.71 | $32.80 | $84.51 | 07/01/2025 | ENGI0158-005 |
| Power Equipment Operators | $53.82 | $33.55 | $87.37 | 07/01/2025 | ENGI0158-019 |
| Power Equipment Operators | $58.61 | $33.55 | $92.16 | 07/01/2025 | ENGI0158-019 |
| Power Equipment Operators | $60.30 | $33.55 | $93.85 | 07/01/2025 | ENGI0158-019 |
| Power Equipment Operators | $61.80 | $33.55 | $95.35 | 07/01/2025 | ENGI0158-019 |
| Power Equipment Operators | $63.30 | $33.55 | $96.85 | 07/01/2025 | ENGI0158-019 |
| Power Equipment Operators | $56.39 | $33.55 | $89.94 | 07/01/2025 | ENGI0158-019 |
| Power Equipment Operators | $57.30 | $33.55 | $90.85 | 07/01/2025 | ENGI0158-019 |
| Ironworker | $37.16 | $30.68 | $67.84 | 07/01/2025 | IRON0060-001 |
| Ironworker | $35.50 | $31.39 | $66.89 | 07/01/2025 | IRON0440-003 |
| Laborer Heavy And Highway | $46.75 | $30.40 | $77.15 | 06/01/2023 | LABO0017-003 |
| Laborer Heavy And Highway | $41.90 | $30.40 | $72.30 | 06/01/2023 | LABO0017-003 |
| Laborer Heavy And Highway | $38.40 | $30.40 | $68.80 | 06/01/2023 | LABO0017-003 |
| Laborer Heavy And Highway | $38.40 | $30.40 | $68.80 | 06/01/2023 | LABO0017-003 |
| Laborer Laborer Heavy And Highway | $38.76 | $25.60 | $64.36 | 07/01/2024 | LABO0785-012 |
| Laborer Laborer Heavy And Highway | $36.16 | $25.60 | $61.76 | 07/01/2024 | LABO0785-012 |
| Laborer Laborer Heavy And Highway | $35.96 | $25.60 | $61.56 | 07/01/2024 | LABO0785-012 |
| Laborer Laborer Heavy And Highway | $35.76 | $25.60 | $61.36 | 07/01/2024 | LABO0785-012 |
| Laborer Laborer Heavy And Highway | $35.56 | $25.60 | $61.16 | 07/01/2024 | LABO0785-012 |
| Laborer Laborers Building | $28.50 | $22.46 | $50.96 | 07/01/2024 | LABO0785-013 |
| Laborer Laborers Building | $28.50 | $22.46 | $50.96 | 07/01/2024 | LABO0785-013 |
| Laborer Laborers Building | $26.50 | $22.46 | $48.96 | 07/01/2024 | LABO0785-013 |
| Painters | $28.10 | $23.83 | $51.93 | 05/01/2024 | PAIN0004-056 |
| Painters | $28.10 | $23.83 | $51.93 | 05/01/2024 | PAIN0004-056 |
| Painters | $28.50 | $23.83 | $52.33 | 05/01/2024 | PAIN0004-056 |
| Painters | $29.00 | $23.83 | $52.83 | 05/01/2024 | PAIN0004-056 |
| Painters | $28.88 | $23.83 | $52.71 | 05/01/2024 | PAIN0004-056 |
| Painters | $28.60 | $23.83 | $52.43 | 05/01/2024 | PAIN0004-056 |
| Glazier | $30.00 | $31.95 | $61.95 | 05/01/2025 | PAIN0677-003 |
| Plumber/pipefitter | $44.91 | $33.31 | $78.22 | 05/01/2025 | PLUM0112-010 |
| Roofer | $30.50 | $19.84 | $50.34 | 06/01/2023 | ROOF0203-004 |
| Sprinkler Fitter Broome | $45.06 | $30.71 | $75.77 | 01/01/2026 | SFNY0669-005 |
| Sheetmetal Worker | $36.29 | $23.31 | $59.60 | 05/01/2025 | SHEE0058-002 |
| Sheet Metal Worker, Includes HVAC Duct Installation | $46.29 | $23.31 | $69.60 | 05/01/2025 | SHEE0058-002 |
| Sheet Metal Worker | $35.94 | $20.89 | $56.83 | 05/01/2023 | SHEE0112-003 |
| Truck Drivers | $37.47 | $29.29 | $66.76 | 07/01/2025 | TEAM0317-009 |
| Truck Drivers | $37.47 | $29.29 | $66.76 | 07/01/2025 | TEAM0317-009 |
| Truck Drivers | $37.27 | $29.29 | $66.56 | 07/01/2025 | TEAM0317-009 |
| Truck Drivers | $37.27 | $29.29 | $66.56 | 07/01/2025 | TEAM0317-009 |
| Truck Drivers | $37.27 | $29.29 | $66.56 | 07/01/2025 | TEAM0317-009 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.