Wage determination NY20260006, modification 2
Effective Jul 30, 2026. Covers 2 New York counties for Heavy, Highway work, with 55 rate lines. Base rates run $20.53–$64.59 and fringe $6.39–$55.14 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260006 |
| Modification | 2 |
| Effective | Jul 30, 2026 |
| Construction types | Heavy, Highway |
| Counties | 2 |
| Rate lines | 55 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Cement Mason/concrete Finisher | $37.23 | $19.51 | $56.74 | 06/01/2018 | BRNY0002-013 |
| Carpenter | $41.03 | $24.50 | $65.53 | 07/01/2024 | CARP0291-006 |
| Electrician | $43.50 | $28.38 | $71.88 | 04/01/2025 | ELEC0910-001 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Power Equipment Operators | $54.90 | $32.45 | $87.35 | 07/01/2024 | ENGI0158-027 |
| Power Equipment Operators | $53.99 | $32.45 | $86.44 | 07/01/2024 | ENGI0158-027 |
| Power Equipment Operators | $60.90 | $32.45 | $93.35 | 07/01/2024 | ENGI0158-027 |
| Power Equipment Operators | $59.40 | $32.45 | $91.85 | 07/01/2024 | ENGI0158-027 |
| Power Equipment Operators | $57.90 | $32.45 | $90.35 | 07/01/2024 | ENGI0158-027 |
| Power Equipment Operators | $57.01 | $32.45 | $89.46 | 07/01/2024 | ENGI0158-027 |
| Power Equipment Operators | $51.42 | $32.45 | $83.87 | 07/01/2024 | ENGI0158-027 |
| Ironworkers | $38.75 | $25.48 | $64.23 | 07/01/2024 | IRON0012-002 |
| Ironworkers | $38.50 | $25.48 | $63.98 | 07/01/2024 | IRON0012-002 |
| Laborers | $31.27 | $27.80 | $59.07 | 07/01/2023 | LABO1822-001 |
| Laborers | $31.27 | $27.80 | $59.07 | 07/01/2023 | LABO1822-001 |
| Laborers | $31.47 | $27.80 | $59.27 | 07/01/2023 | LABO1822-001 |
| Laborers | $31.67 | $27.80 | $59.47 | 07/01/2023 | LABO1822-001 |
| Laborers | $34.27 | $27.80 | $62.07 | 07/01/2023 | LABO1822-001 |
| Painters | $34.50 | $21.69 | $56.19 | 05/01/2025 | PAIN0201-002 |
| Painters | $34.50 | $21.69 | $56.19 | 05/01/2025 | PAIN0201-002 |
| Painters | $33.50 | $21.69 | $55.19 | 05/01/2025 | PAIN0201-002 |
| Painters | $33.50 | $21.69 | $55.19 | 05/01/2025 | PAIN0201-002 |
| Painters | $56.25 | $55.14 | $111.39 | 10/01/2024 | PAIN0806-003 |
| Plumber And Steamfitter | $44.88 | $33.60 | $78.48 | 05/01/2025 | PLUM0773-001 |
| Plumber And Steamfitter | $45.88 | $33.60 | $79.48 | 05/01/2025 | PLUM0773-001 |
| Sheet Metal Worker | $33.73 | $33.04 | $66.77 | 06/01/2019 | SHEE0083-001 |
| Truck Drivers | $34.81 | $27.02 | $61.83 | 07/01/2025 | TEAM0687-003 |
| Truck Drivers | $35.03 | $27.02 | $62.05 | 07/01/2025 | TEAM0687-003 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.