Wage determination NY20260008, modification 3
Effective Jul 30, 2026. Covers 3 New York counties for Heavy, Highway work, with 106 rate lines. Base rates run $14.20–$64.59 and fringe $0.00–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260008 |
| Modification | 3 |
| Effective | Jul 30, 2026 |
| Construction types | Heavy, Highway |
| Counties | 3 |
| Rate lines | 106 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $34.15 | $26.09 | $60.24 | 05/01/2021 | ASBE0004-001 |
| Asbestos Worker/heat & Frost Insulator | $37.65 | $30.69 | $68.34 | 05/01/2025 | ASBE0004-001 |
| Boilermaker | $39.35 | $33.18 | $72.53 | 01/01/2025 | BOIL0007-001 |
| Cement Mason/concrete Finisher | $38.63 | $25.05 | $63.68 | 07/01/2024 | BRNY0008-004 |
| Tilesetter & Terrazzo Worker | $31.21 | $20.54 | $51.75 | 07/01/2015 | BRNY0045-001 |
| Marble Setter | $31.72 | $29.18 | $60.90 | 07/01/2020 | BRNY0045-001 |
| Cement Mason | $36.82 | $31.33 | $68.15 | 07/01/2023 | BRNY0045-001 |
| Bricklayer, Stonemason | $37.44 | $32.71 | $70.15 | 07/01/2024 | BRNY0045-001 |
| Terrazzo Finisher | $34.71 | $17.54 | $52.25 | 07/01/2024 | BRNY0045-001 |
| Tile Finisher | $34.71 | $17.54 | $52.25 | 07/01/2024 | BRNY0045-001 |
| Carpenters | $38.18 | $26.11 | $64.29 | 07/01/2024 | CARP0276-002 |
| Carpenter, Heavy & Highway | $41.19 | $31.55 | $72.74 | 07/01/2024 | CARP0276-013 |
| Carpenter, Heavy & Highway | $38.18 | $26.11 | $64.29 | 07/01/2024 | CARP0276-021 |
| Cable Splicer | $36.73 | $23.39 | $60.12 | 04/01/2014 | ELEC0041-007 |
| Electrician | $44.50 | $36.06 | $80.56 | 05/26/2025 | ELEC0041-007 |
| Communications System | $14.20 | $14.02 | $28.22 | 05/26/2025 | ELEC0041-008 |
| Communications System, Installer | $22.90 | $21.38 | $44.28 | 05/26/2025 | ELEC0041-008 |
| Communications System, Master Technician | $44.50 | $36.05 | $80.55 | 05/26/2025 | ELEC0041-008 |
| Communications System, Sound Wireman | $44.50 | $36.05 | $80.55 | 05/26/2025 | ELEC0041-008 |
| Cable Splicer | $35.75 | $20.68 | $56.43 | 01/01/2014 | ELEC0106-002 |
| Electrician | $42.50 | $27.23 | $69.73 | 01/01/2024 | ELEC0106-002 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Elevator Mechanic | $62.39 | $38.44 | $100.83 | 01/01/2025 | ELEV0014-001 |
| Power Equipment Operators | $47.39 | $36.89 | $84.28 | 07/01/2025 | ENGI0017-012 |
| Power Equipment Operators | $42.89 | $36.89 | $79.78 | 07/01/2025 | ENGI0017-012 |
| Power Equipment Operators | $50.64 | $36.89 | $87.53 | 07/01/2025 | ENGI0017-012 |
| Power Equipment Operators | $51.64 | $36.89 | $88.53 | 07/01/2025 | ENGI0017-012 |
| Power Equipment Operators | $52.14 | $36.89 | $89.03 | 07/01/2025 | ENGI0017-012 |
| Power Equipment Operators | $52.64 | $36.89 | $89.53 | 07/01/2025 | ENGI0017-012 |
| Power Equipment Operators | $48.46 | $36.89 | $85.35 | 07/01/2025 | ENGI0017-012 |
| Ironworker | $34.06 | $30.80 | $64.86 | 07/01/2024 | IRON0006-003 |
| Ironworker | $35.49 | $32.30 | $67.79 | 07/01/2024 | IRON0006-003 |
| Ironworker | $33.14 | $32.30 | $65.44 | 07/01/2024 | IRON0006-003 |
| Ironworker | $35.49 | $32.30 | $67.79 | 07/01/2024 | IRON0006-015 |
| Ironworker | $35.49 | $32.30 | $67.79 | 07/01/2024 | IRON0006-015 |
| Laborer | $34.66 | $28.65 | $63.31 | 07/01/2023 | LABO0210-003 |
| Laborer | $34.86 | $28.65 | $63.51 | 07/01/2023 | LABO0210-003 |
| Laborer | $35.06 | $28.65 | $63.71 | 07/01/2023 | LABO0210-003 |
| Laborer | $35.26 | $28.65 | $63.91 | 07/01/2023 | LABO0210-003 |
| Laborer | $34.66 | $28.65 | $63.31 | 07/01/2023 | LABO0210-003 |
| Laborer | $36.16 | $28.65 | $64.81 | 07/01/2023 | LABO0210-003 |
| Laborer | $36.31 | $28.65 | $64.96 | 07/01/2023 | LABO0210-003 |
| Laborer | $34.76 | $28.65 | $63.41 | 07/01/2023 | LABO0210-003 |
| Laborer | $34.81 | $28.65 | $63.46 | 07/01/2023 | LABO0210-003 |
| Laborer | $36.41 | $28.65 | $65.06 | 07/01/2023 | LABO0210-003 |
| Laborer | $34.91 | $28.65 | $63.56 | 07/01/2023 | LABO0210-003 |
| Laborer | $36.91 | $28.65 | $65.56 | 07/01/2023 | LABO0210-003 |
| Laborer | $35.26 | $28.65 | $63.91 | 07/01/2023 | LABO0210-003 |
| Laborer | $37.01 | $28.65 | $65.66 | 07/01/2023 | LABO0210-003 |
| Laborer | $35.66 | $28.65 | $64.31 | 07/01/2023 | LABO0210-003 |
| Laborer | $37.41 | $28.65 | $66.06 | 07/01/2023 | LABO0210-003 |
| Laborer | $37.66 | $28.65 | $66.31 | 07/01/2023 | LABO0210-003 |
| Laborers | $33.93 | $28.69 | $62.62 | 07/01/2025 | LABO0621-001 |
| Laborers | $34.33 | $28.69 | $63.02 | 07/01/2025 | LABO0621-001 |
| Laborers | $34.33 | $28.69 | $63.02 | 07/01/2025 | LABO0621-002 |
| Laborers | $33.93 | $28.69 | $62.62 | 07/01/2025 | LABO0621-002 |
| Painters | $38.50 | $28.40 | $66.90 | 05/01/2019 | PAIN0004-001 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-001 |
| Painters | $34.00 | $28.51 | $62.51 | 05/01/2025 | PAIN0004-001 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-001 |
| Painters | $42.06 | $30.59 | $72.65 | 05/01/2023 | PAIN0004-004 |
| Glazier | $34.68 | $27.64 | $62.32 | 05/01/2025 | PAIN0004-007 |
| Painters | $42.06 | $30.59 | $72.65 | 05/01/2023 | PAIN0004-008 |
| Painters | $42.06 | $30.59 | $72.65 | 05/01/2023 | PAIN0004-017 |
| Plasterer | $33.05 | $25.09 | $58.14 | 04/01/2025 | PLAS0009-001 |
| Cement Finisher | $33.65 | $31.47 | $65.12 | 07/01/2025 | PLAS0111-001 |
| Plumber/pipefitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-001 |
| Steamfitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-001 |
| Plumber/pipefitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-004 |
| Roofers | $34.96 | $26.03 | $60.99 | 06/01/2024 | ROOF0074-001 |
| Roofers | $35.11 | $26.03 | $61.14 | 06/01/2024 | ROOF0074-001 |
| Roofer | $23.65 | $11.99 | $35.64 | 06/01/2010 | ROOF0210-005 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $39.50 | $29.18 | $68.68 | 05/27/2024 | SHEE0071-001 |
| Sheet Metal Worker | $31.00 | $24.56 | $55.56 | 07/01/2023 | SHEE0112-001 |
| Truck Drivers | $49.66 | $16.82 | $66.48 | 07/01/2025 | TEAM0264-001 |
| Truck Drivers | $49.66 | $16.82 | $66.48 | 07/01/2025 | TEAM0264-001 |
| Truck Drivers | $49.23 | $8.75 | $57.98 | 07/01/2025 | TEAM0449-002 |
| Truck Drivers | $32.00 | $0.00 | $32.00 | 06/01/2025 | TEAM0449-005 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.