Wage determination NY20260011, modification 3
Effective Jul 30, 2026. Covers 1 New York county for Heavy, Highway work, with 73 rate lines. Base rates run $20.53–$64.59 and fringe $0.00–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260011 |
| Modification | 3 |
| Effective | Jul 30, 2026 |
| Construction types | Heavy, Highway |
| Counties | 1 |
| Rate lines | 73 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Boilermaker | $39.35 | $33.18 | $72.53 | 01/01/2025 | BOIL0007-001 |
| Marble Mason | $36.85 | $30.80 | $67.65 | 07/01/2023 | BRNY0045-002 |
| Pointer, Cleaner And Caulker | $36.82 | $31.33 | $68.15 | 07/01/2023 | BRNY0045-002 |
| Bricklayer, Stonemason | $37.44 | $32.71 | $70.15 | 07/01/2024 | BRNY0045-002 |
| Tile & Terrazzo Worker | $37.85 | $31.80 | $69.65 | 07/01/2024 | BRNY0045-002 |
| Tile, Marble & Terrazzo Finisher | $34.71 | $17.54 | $52.25 | 07/01/2024 | BRNY0045-002 |
| Carpenter | $41.19 | $29.81 | $71.00 | 07/01/2024 | CARP0276-015 |
| Carpenter | $41.19 | $31.55 | $72.74 | 07/01/2024 | CARP0276-015 |
| Electricians | $44.20 | $32.90 | $77.10 | 05/26/2025 | ELEC0237-001 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Power Equipment Operator Group A1 | $47.39 | $34.84 | $82.23 | 07/01/2025 | ENGI0017-007 |
| Power Equipment Operator Group B | $42.89 | $34.84 | $77.73 | 07/01/2025 | ENGI0017-007 |
| Power Equipment Operator Master Mechanic | $48.46 | $34.84 | $83.30 | 07/01/2025 | ENGI0017-007 |
| Power Equipment Operator | $47.39 | $34.84 | $82.23 | 07/01/2025 | ENGI0017-007 |
| Power Equipment Operator | $38.06 | $28.10 | $66.16 | 07/01/2016 | ENGI0017-008 |
| Power Equipment Operator | $36.29 | $28.10 | $64.39 | 07/01/2016 | ENGI0017-008 |
| Power Equipment Operator | $39.29 | $28.10 | $67.39 | 07/01/2016 | ENGI0017-008 |
| Power Equipment Operator | $34.58 | $28.10 | $62.68 | 07/01/2016 | ENGI0017-008 |
| Power Equipment Operator | $28.53 | $28.10 | $56.63 | 07/01/2016 | ENGI0017-008 |
| Ironworker | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-003 |
| Ironworkers | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-003 |
| Laborer Compressed Air | $26.00 | $35.96 | $61.96 | 07/01/2017 | LABO0091-002 |
| Laborer | $26.00 | $35.96 | $61.96 | 07/01/2017 | LABO0091-002 |
| Laborer | $26.30 | $35.96 | $62.26 | 07/01/2017 | LABO0091-002 |
| Laborer | $26.50 | $35.96 | $62.46 | 07/01/2017 | LABO0091-002 |
| Laborer | $26.60 | $35.96 | $62.56 | 07/01/2017 | LABO0091-002 |
| Laborer | $26.85 | $35.96 | $62.81 | 07/01/2017 | LABO0091-002 |
| Laborer | $27.00 | $35.96 | $62.96 | 07/01/2017 | LABO0091-002 |
| Laborer | $28.00 | $35.96 | $63.96 | 07/01/2017 | LABO0091-002 |
| Laborer | $28.60 | $35.96 | $64.56 | 07/01/2017 | LABO0091-002 |
| Laborer | $31.00 | $35.96 | $66.96 | 07/01/2017 | LABO0091-002 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-002 |
| Painters | $34.00 | $28.51 | $62.51 | 05/01/2025 | PAIN0004-002 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-002 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-005 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-005 |
| Painters | $34.00 | $28.51 | $62.51 | 05/01/2025 | PAIN0004-005 |
| Glazier | $34.68 | $27.64 | $62.32 | 05/01/2025 | PAIN0004-011 |
| Cement Finisher | $33.55 | $34.17 | $67.72 | 07/01/2025 | PLAS0111-002 |
| Plumber And Steamfitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-005 |
| Roofers | $34.96 | $26.03 | $60.99 | 06/01/2024 | ROOF0074-002 |
| Roofers | $35.11 | $26.03 | $61.14 | 06/01/2024 | ROOF0074-002 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $39.50 | $29.18 | $68.68 | 05/27/2024 | SHEE0071-002 |
| Truck Drivers | $49.23 | $8.75 | $57.98 | 07/01/2025 | TEAM0449-003 |
| Truck Drivers | $32.00 | $0.00 | $32.00 | 06/01/2025 | TEAM0449-006 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.