Wage determination NY20260019, modification 1
Effective May 18, 2026. Covers 1 New York county for Building work, with 46 rate lines. Base rates run $30.15–$62.39 and fringe $17.54–$41.36 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260019 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Building |
| Counties | 1 |
| Rate lines | 46 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $34.15 | $26.09 | $60.24 | 05/01/2021 | ASBE0004-001 |
| Asbestos Worker/heat & Frost Insulator | $37.65 | $30.69 | $68.34 | 05/01/2021 | ASBE0004-001 |
| Hazardous Material Handler | $34.15 | $26.09 | $60.24 | 05/01/2025 | ASBE0004-001 |
| Asbestos Worker/heat & Frost Insulator | $37.65 | $30.69 | $68.34 | 05/01/2025 | ASBE0004-001 |
| Pointer, Cleaner And Caulker | $36.82 | $31.33 | $68.15 | 07/01/2023 | BRNY0045-002 |
| Marble Mason | $36.85 | $30.80 | $67.65 | 07/01/2023 | BRNY0045-002 |
| Tile, Marble & Terrazzo Finisher | $34.71 | $17.54 | $52.25 | 07/01/2023 | BRNY0045-002 |
| Tile & Terrazzo Worker | $37.85 | $31.80 | $69.65 | 07/01/2023 | BRNY0045-002 |
| Bricklayer, Stonemason | $37.44 | $32.71 | $70.15 | 07/01/2023 | BRNY0045-002 |
| Pointer, Cleaner And Caulker | $36.82 | $31.33 | $68.15 | 07/01/2024 | BRNY0045-002 |
| Marble Mason | $36.85 | $30.80 | $67.65 | 07/01/2024 | BRNY0045-002 |
| Tile, Marble & Terrazzo Finisher | $34.71 | $17.54 | $52.25 | 07/01/2024 | BRNY0045-002 |
| Tile & Terrazzo Worker | $37.85 | $31.80 | $69.65 | 07/01/2024 | BRNY0045-002 |
| Bricklayer, Stonemason | $37.44 | $32.71 | $70.15 | 07/01/2024 | BRNY0045-002 |
| Carpenters | $34.26 | $25.94 | $60.20 | 07/01/2024 | CARP0276-016 |
| Electricians | $44.20 | $32.90 | $77.10 | 05/26/2025 | ELEC0237-001 |
| Elevator Mechanic | $62.39 | $38.44 | $100.83 | 01/01/2025 | ELEV0014-001 |
| Power Equipment Operator | $44.23 | $35.40 | $79.63 | 07/01/2025 | ENGI0017-010 |
| Power Equipment Operator | $44.23 | $35.40 | $79.63 | 07/01/2025 | ENGI0017-010 |
| Power Equipment Operator | $44.23 | $35.40 | $79.63 | 07/01/2025 | ENGI0017-010 |
| Power Equipment Operator | $44.23 | $35.40 | $79.63 | 07/01/2025 | ENGI0017-010 |
| Power Equipment Operator | $44.23 | $35.40 | $79.63 | 07/01/2025 | ENGI0017-010 |
| Ironworkers | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-003 |
| Ironworker | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-003 |
| Laborers | $37.45 | $41.36 | $78.81 | 07/01/2023 | LABO0091-001 |
| Laborers | $34.45 | $41.36 | $75.81 | 07/01/2023 | LABO0091-001 |
| Laborers | $32.75 | $41.36 | $74.11 | 07/01/2023 | LABO0091-001 |
| Laborers | $32.95 | $41.36 | $74.31 | 07/01/2023 | LABO0091-001 |
| Laborers | $33.05 | $41.36 | $74.41 | 07/01/2023 | LABO0091-001 |
| Laborers | $33.30 | $41.36 | $74.66 | 07/01/2023 | LABO0091-001 |
| Laborers | $33.45 | $41.36 | $74.81 | 07/01/2023 | LABO0091-001 |
| Laborers | $35.70 | $41.36 | $77.06 | 07/01/2023 | LABO0091-001 |
| Laborers | $32.45 | $41.36 | $73.81 | 07/01/2023 | LABO0091-001 |
| Painters | $34.00 | $28.51 | $62.51 | 05/01/2025 | PAIN0004-009 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-009 |
| Painters | $34.00 | $28.51 | $62.51 | 05/01/2025 | PAIN0004-010 |
| Painters | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-010 |
| Glazier | $34.68 | $27.64 | $62.32 | 05/01/2025 | PAIN0004-012 |
| Plasterer | $30.15 | $20.49 | $50.64 | 04/01/2019 | PLAS0111-003 |
| Cement Finisher | $33.55 | $34.17 | $67.72 | 04/01/2019 | PLAS0111-003 |
| Plasterer | $30.15 | $20.49 | $50.64 | 07/01/2025 | PLAS0111-003 |
| Cement Finisher | $33.55 | $34.17 | $67.72 | 07/01/2025 | PLAS0111-003 |
| Plumber And Steamfitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-005 |
| Roofers | $35.11 | $26.03 | $61.14 | 06/01/2024 | ROOF0074-002 |
| Roofers | $34.96 | $26.03 | $60.99 | 06/01/2024 | ROOF0074-002 |
| Sheet Metal Worker | $39.50 | $29.18 | $68.68 | 05/27/2024 | SHEE0071-002 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.