Wage determination NY20260029, modification 3
Effective Jul 30, 2026. Covers 1 New York county for Heavy, Highway work, with 104 rate lines. Base rates run $14.20–$64.59 and fringe $6.39–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260029 |
| Modification | 3 |
| Effective | Jul 30, 2026 |
| Construction types | Heavy, Highway |
| Counties | 1 |
| Rate lines | 104 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $34.15 | $26.09 | $60.24 | 05/01/2021 | ASBE0004-002 |
| Asbestos Worker/heat & Frost Insulator | $37.65 | $30.69 | $68.34 | 05/01/2025 | ASBE0004-002 |
| Asbestos Worker/heat & Frost Insulator | $40.26 | $25.41 | $65.67 | 06/01/2025 | ASBE0026-002 |
| Hazardous Material Handler | $40.26 | $25.41 | $65.67 | 06/01/2025 | ASBE0026-002 |
| Cement Mason/concrete Finisher | $38.63 | $25.05 | $63.68 | 07/01/2025 | BRNY0003-007 |
| Millwright | $31.93 | $25.11 | $57.04 | 07/01/2019 | CARP0276-017 |
| Carpenter | $34.26 | $25.94 | $60.20 | 07/01/2024 | CARP0276-017 |
| Cable Splicer | $36.73 | $23.39 | $60.12 | 04/01/2014 | ELEC0041-009 |
| Electrician | $44.50 | $36.06 | $80.56 | 05/26/2025 | ELEC0041-009 |
| Communications System | $14.20 | $14.02 | $28.22 | 05/26/2025 | ELEC0041-010 |
| Communications System, Installer | $22.90 | $21.38 | $44.28 | 05/26/2025 | ELEC0041-010 |
| Communications System, Master Technician | $44.50 | $36.05 | $80.55 | 05/26/2025 | ELEC0041-010 |
| Communications System, Sound Wireman | $44.50 | $36.05 | $80.55 | 05/26/2025 | ELEC0041-010 |
| Electrician | $44.30 | $30.20 | $74.50 | 05/26/2025 | ELEC0086-005 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Elevator Mechanic | $62.39 | $38.44 | $100.83 | 01/01/2025 | ELEV0014-001 |
| Power Equipment Operators | $47.39 | $36.89 | $84.28 | 07/01/2025 | ENGI0017-005 |
| Power Equipment Operators | $42.89 | $36.89 | $79.78 | 07/01/2025 | ENGI0017-005 |
| Power Equipment Operators | $50.64 | $36.89 | $87.53 | 07/01/2025 | ENGI0017-005 |
| Power Equipment Operators | $51.64 | $36.89 | $88.53 | 07/01/2025 | ENGI0017-005 |
| Power Equipment Operators | $52.14 | $36.89 | $89.03 | 07/01/2025 | ENGI0017-005 |
| Power Equipment Operators | $52.64 | $36.89 | $89.53 | 07/01/2025 | ENGI0017-005 |
| Power Equipment Operators | $48.46 | $36.89 | $85.35 | 07/01/2025 | ENGI0017-005 |
| Power Equipment Operators | $36.66 | $32.74 | $69.40 | 07/01/2022 | ENGI0158-013 |
| Power Equipment Operators | $35.86 | $32.74 | $68.60 | 07/01/2022 | ENGI0158-013 |
| Power Equipment Operators | $33.16 | $32.74 | $65.90 | 07/01/2022 | ENGI0158-013 |
| Power Equipment Operators | $28.60 | $32.74 | $61.34 | 07/01/2022 | ENGI0158-013 |
| Power Equipment Operators | $41.16 | $32.74 | $73.90 | 07/01/2022 | ENGI0158-013 |
| Power Equipment Operators | $43.66 | $32.74 | $76.40 | 07/01/2022 | ENGI0158-013 |
| Power Equipment Operators | $44.66 | $32.74 | $77.40 | 07/01/2022 | ENGI0158-013 |
| Power Equipment Operators | $43.66 | $32.74 | $76.40 | 07/01/2022 | ENGI0158-013 |
| Operating Engineer | $55.38 | $34.85 | $90.23 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $55.38 | $35.75 | $91.13 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $58.43 | $35.00 | $93.43 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $40.79 | $34.85 | $75.64 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $54.68 | $35.75 | $90.43 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $57.21 | $35.00 | $92.21 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $40.10 | $34.85 | $74.95 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $51.81 | $35.75 | $87.56 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $54.42 | $35.00 | $89.42 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $36.61 | $34.85 | $71.46 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $61.38 | $35.75 | $97.13 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $51.41 | $35.00 | $86.41 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $59.88 | $35.75 | $95.63 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $58.38 | $35.75 | $94.13 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $56.81 | $35.75 | $92.56 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $43.26 | $34.85 | $78.11 | 07/01/2025 | ENGI0158-034 |
| Operating Engineer | $60.84 | $35.00 | $95.84 | 07/01/2025 | ENGI0158-034 |
| Ironworkers | $34.06 | $30.80 | $64.86 | 07/01/2024 | IRON0006-005 |
| Ironworkers | $35.49 | $32.30 | $67.79 | 07/01/2024 | IRON0006-005 |
| Ironworkers | $33.14 | $32.30 | $65.44 | 07/01/2024 | IRON0006-005 |
| Ironworkers | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-001 |
| Ironworkers | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-001 |
| Ironworkers | $35.75 | $30.80 | $66.55 | 07/01/2025 | IRON0033-004 |
| Ironworkers | $36.00 | $30.80 | $66.80 | 07/01/2025 | IRON0033-004 |
| Laborer | $32.96 | $25.30 | $58.26 | 07/01/2024 | LABO0435-008 |
| Laborer | $33.66 | $25.30 | $58.96 | 07/01/2024 | LABO0435-008 |
| Laborer | $33.86 | $25.30 | $59.16 | 07/01/2024 | LABO0435-008 |
| Laborer | $34.69 | $25.30 | $59.99 | 07/01/2024 | LABO0435-008 |
| Laborer | $35.44 | $25.30 | $60.74 | 07/01/2024 | LABO0435-008 |
| Painter | $34.00 | $28.51 | $62.51 | 05/01/2025 | PAIN0004-003 |
| Painter | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-003 |
| Painter | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-003 |
| Glazier | $34.68 | $27.64 | $62.32 | 05/01/2025 | PAIN0004-013 |
| Plumber And Steamfitter | $42.68 | $27.88 | $70.56 | 05/06/2025 | PLUM0013-002 |
| Plumbers And Pipefitters | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-002 |
| Steamfitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-002 |
| Roofers | $34.96 | $26.03 | $60.99 | 06/01/2024 | ROOF0074-002 |
| Roofers | $35.11 | $26.03 | $61.14 | 06/01/2024 | ROOF0074-002 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $39.50 | $29.18 | $68.68 | 05/27/2024 | SHEE0071-002 |
| Truck Drivers | $31.39 | $27.77 | $59.16 | 07/01/2025 | TEAM0118-002 |
| Truck Drivers | $31.44 | $27.77 | $59.21 | 07/01/2025 | TEAM0118-002 |
| Truck Drivers | $31.49 | $27.77 | $59.26 | 07/01/2025 | TEAM0118-002 |
| Truck Drivers | $31.64 | $27.77 | $59.41 | 07/01/2025 | TEAM0118-002 |
| Truck Drivers | $31.79 | $27.77 | $59.56 | 07/01/2025 | TEAM0118-002 |
| Truck Drivers | $49.23 | $8.75 | $57.98 | 07/01/2025 | TEAM0449-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.