Wage determination NY20260034, modification 2
Effective May 18, 2026. Covers 1 New York county for Building, Heavy, Highway work, with 76 rate lines. Base rates run $20.53–$64.59 and fringe $6.39–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260034 |
| Modification | 2 |
| Effective | May 18, 2026 |
| Construction types | Building, Heavy, Highway |
| Counties | 1 |
| Rate lines | 76 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $40.26 | $25.41 | $65.67 | 06/01/2025 | ASBE0026-003 |
| Asbestos Worker/heat & Frost Insulator | $40.26 | $25.41 | $65.67 | 06/01/2025 | ASBE0026-003 |
| Boilermaker | $39.35 | $33.18 | $72.53 | 01/01/2025 | BOIL0007-001 |
| Marble, Tile And Terrazzo Finishers | $35.71 | $18.26 | $53.97 | 07/01/2025 | BRNY0003-011 |
| Marble Tile And Terrazzo Workers | $37.85 | $31.80 | $69.65 | 07/01/2025 | BRNY0003-011 |
| Cement Masons | $38.63 | $25.05 | $63.68 | 07/01/2025 | BRNY0003-011 |
| Bricklayers, Stone Masons, Plasterers, Cement Masons, Pointer,… | $37.44 | $32.71 | $70.15 | 07/01/2025 | BRNY0003-011 |
| Millwright | $31.93 | $25.11 | $57.04 | 07/01/2019 | CARP0276-017 |
| Carpenter | $34.26 | $25.94 | $60.20 | 07/01/2019 | CARP0276-017 |
| Millwright | $31.93 | $25.11 | $57.04 | 07/01/2024 | CARP0276-017 |
| Carpenter | $34.26 | $25.94 | $60.20 | 07/01/2024 | CARP0276-017 |
| Electrician | $44.30 | $30.20 | $74.50 | 05/26/2025 | ELEC0086-006 |
| Cable Splicer | $37.40 | $27.44 | $64.84 | 05/29/2017 | ELEC0237-002 |
| Electrician | $44.20 | $32.90 | $77.10 | 05/29/2017 | ELEC0237-002 |
| Cable Splicer | $37.40 | $27.44 | $64.84 | 05/26/2025 | ELEC0237-002 |
| Electrician | $44.20 | $32.90 | $77.10 | 05/26/2025 | ELEC0237-002 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Power Equipment Operators | $45.47 | $35.40 | $80.87 | 07/01/2025 | ENGI0017-004 |
| Power Equipment Operators | $49.48 | $35.40 | $84.88 | 07/01/2025 | ENGI0017-004 |
| Power Equipment Operators | $48.98 | $35.40 | $84.38 | 07/01/2025 | ENGI0017-004 |
| Power Equipment Operators | $48.48 | $35.40 | $83.88 | 07/01/2025 | ENGI0017-004 |
| Power Equipment Operators | $47.48 | $35.40 | $82.88 | 07/01/2025 | ENGI0017-004 |
| Power Equipment Operators | $39.14 | $35.40 | $74.54 | 07/01/2025 | ENGI0017-004 |
| Power Equipment Operators | $44.23 | $35.40 | $79.63 | 07/01/2025 | ENGI0017-004 |
| Ironworkers | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-001 |
| Ironworkers | $36.25 | $33.12 | $69.37 | 07/01/2025 | IRON0009-001 |
| Ironworkers | $36.00 | $30.80 | $66.80 | 07/01/2025 | IRON0033-011 |
| Ironworkers | $35.75 | $30.80 | $66.55 | 07/01/2025 | IRON0033-011 |
| Laborers | $35.44 | $25.30 | $60.74 | 07/01/2024 | LABO0435-004 |
| Laborers | $34.69 | $25.30 | $59.99 | 07/01/2024 | LABO0435-004 |
| Laborers | $33.86 | $25.30 | $59.16 | 07/01/2024 | LABO0435-004 |
| Laborers | $33.66 | $25.30 | $58.96 | 07/01/2024 | LABO0435-004 |
| Laborers | $32.96 | $25.30 | $58.26 | 07/01/2024 | LABO0435-004 |
| Painter | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-003 |
| Painter | $33.00 | $28.21 | $61.21 | 05/01/2025 | PAIN0004-003 |
| Painter | $34.00 | $28.51 | $62.51 | 05/01/2025 | PAIN0004-003 |
| Glazier | $34.68 | $27.64 | $62.32 | 05/01/2025 | PAIN0004-013 |
| Plumber And Steamfitter | $42.68 | $27.88 | $70.56 | 05/06/2025 | PLUM0013-003 |
| Plumber And Steamfitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-006 |
| Roofers | $35.11 | $26.03 | $61.14 | 06/01/2024 | ROOF0074-002 |
| Roofers | $34.96 | $26.03 | $60.99 | 06/01/2024 | ROOF0074-002 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $39.50 | $29.18 | $68.68 | 05/27/2024 | SHEE0071-002 |
| Truck Drivers | $31.79 | $27.77 | $59.56 | 07/01/2025 | TEAM0118-003 |
| Truck Drivers | $31.64 | $27.77 | $59.41 | 07/01/2025 | TEAM0118-003 |
| Truck Drivers | $31.49 | $27.77 | $59.26 | 07/01/2025 | TEAM0118-003 |
| Truck Drivers | $31.44 | $27.77 | $59.21 | 07/01/2025 | TEAM0118-003 |
| Truck Drivers | $31.39 | $27.77 | $59.16 | 07/01/2025 | TEAM0118-003 |
| Truck Drivers | $49.23 | $8.75 | $57.98 | 07/01/2025 | TEAM0449-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.