Wage determination NY20260074, modification 1
Effective May 18, 2026. Covers 1 New York county for Residential work, with 16 rate lines. Base rates run $14.25–$27.74 and fringe $0.00–$23.40 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260074 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Residential |
| Counties | 1 |
| Rate lines | 16 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Plumber | $27.44 | $23.40 | $50.84 | 05/02/2016 | PLUM0022-014 |
| Sheet Metal Worker | $17.41 | $2.46 | $19.87 | 03/17/2015 | SUNY2013-001 |
| Roofer | $16.64 | $0.00 | $16.64 | 03/17/2015 | SUNY2013-001 |
| Plumber | $20.91 | $0.00 | $20.91 | 03/17/2015 | SUNY2013-001 |
| Painter | $18.47 | $0.00 | $18.47 | 03/17/2015 | SUNY2013-001 |
| Operator | $21.72 | $0.00 | $21.72 | 03/17/2015 | SUNY2013-001 |
| Operator | $27.74 | $0.00 | $27.74 | 03/17/2015 | SUNY2013-001 |
| Operator | $21.73 | $0.00 | $21.73 | 03/17/2015 | SUNY2013-001 |
| Laborer | $16.00 | $10.45 | $26.45 | 03/17/2015 | SUNY2013-001 |
| Laborer | $14.25 | $0.00 | $14.25 | 03/17/2015 | SUNY2013-001 |
| Electrician | $17.08 | $0.00 | $17.08 | 03/17/2015 | SUNY2013-001 |
| Drywall Finisher/taper | $21.51 | $0.00 | $21.51 | 03/17/2015 | SUNY2013-001 |
| Cement Mason/concrete Finisher | $22.60 | $5.75 | $28.35 | 03/17/2015 | SUNY2013-001 |
| Carpenter, Excluding Siding Installation | $20.89 | $0.00 | $20.89 | 03/17/2015 | SUNY2013-001 |
| Carpenter | $16.35 | $0.00 | $16.35 | 03/17/2015 | SUNY2013-001 |
| Carpenter | $23.14 | $0.00 | $23.14 | 03/17/2015 | SUNY2013-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.