Wage determination NY20260093, modification 1
Effective May 18, 2026. Covers 4 New York counties for Residential work, with 17 rate lines. Base rates run $14.96–$42.63 and fringe $0.00–$53.70 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260093 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Residential |
| Counties | 4 |
| Rate lines | 17 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Bricklayer | $25.38 | $12.02 | $37.40 | 07/01/2025 | BRNY0003-001 |
| Carpenter | $31.59 | $23.24 | $54.83 | 07/01/2025 | CARP0277-002 |
| Ironworker, Structural | $35.75 | $30.80 | $66.55 | 07/01/2025 | IRON0033-019 |
| Ironworker, Ornamental A) | $42.63 | $53.70 | $96.33 | 07/01/2025 | IRON0417-004 |
| Painter | $23.25 | $21.21 | $44.46 | 05/01/2017 | PAIN0031-002 |
| Sheet Metal Worker, Includes HVAC Duct Installation | $17.41 | $2.46 | $19.87 | 03/17/2015 | SUNY2013-021 |
| Roofer | $14.96 | $0.00 | $14.96 | 03/17/2015 | SUNY2013-021 |
| Plumber | $22.71 | $0.00 | $22.71 | 03/17/2015 | SUNY2013-021 |
| Operator | $27.88 | $21.40 | $49.28 | 03/17/2015 | SUNY2013-021 |
| Operator | $20.80 | $0.00 | $20.80 | 03/17/2015 | SUNY2013-021 |
| Operator | $21.36 | $0.00 | $21.36 | 03/17/2015 | SUNY2013-021 |
| Laborer | $19.69 | $0.00 | $19.69 | 03/17/2015 | SUNY2013-021 |
| Laborer | $18.03 | $0.00 | $18.03 | 03/17/2015 | SUNY2013-021 |
| Laborer | $15.35 | $0.00 | $15.35 | 03/17/2015 | SUNY2013-021 |
| Ironworker, Reinforcing | $27.06 | $23.02 | $50.08 | 03/17/2015 | SUNY2013-021 |
| Electrician | $26.08 | $12.92 | $39.00 | 03/17/2015 | SUNY2013-021 |
| Cement Mason/concrete Finisher | $21.30 | $13.27 | $34.57 | 03/17/2015 | SUNY2013-021 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.