Prevailing wage rates in Massachusetts
Every active federal Davis-Bacon determination that covers Massachusetts: 24 determinations, 14 counties, 993 rate lines, newest effective Aug 6, 2026. Pick your county below, or read the rate ranges by trade.
What this page covers
State-funded work is separate. Massachusetts public works are governed by M.G.L. c. 149, §§ 26-27D and administered by Department of Labor Standards (rates); Attorney General's Fair Labor Division (enforcement), covering contracts with no dollar threshold. The state form is the Weekly Certified Payroll Report + Weekly Statement of Compliance. A federal determination does not replace the state rate, and on a project covered by both laws you must satisfy both — usually the higher rate plus each law's paperwork.
State rules, the filing clock and the penalty: Massachusetts certified payroll.
Counties covered
Each row is a Massachusetts county that appears in an active federal determination. The count is the number of determinations naming that county — usually one per construction type.
| County | Determinations | Construction types | Newest effective | Look up |
|---|---|---|---|---|
| Barnstable | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Berkshire | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Bristol | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Dukes | 5 | Building, Heavy, Residential, Highway | May 18, 2026 | Rates → |
| Essex | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Franklin | 5 | Building, Heavy, Highway, Residential | May 18, 2026 | Rates → |
| Hampden | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Hampshire | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Middlesex | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Nantucket | 5 | Building, Heavy, Residential, Highway | May 18, 2026 | Rates → |
| Norfolk | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Plymouth | 5 | Residential, Heavy, Building, Highway | Aug 6, 2026 | Rates → |
| Suffolk | 5 | Building, Residential, Heavy, Highway | Aug 6, 2026 | Rates → |
| Worcester | 5 | Heavy, Residential, Building, Highway | Aug 6, 2026 | Rates → |
Rates by trade and construction type
These are the ranges across every Massachusetts county in the current determinations. A range means the same classification carries different rates in different counties, or the determination lists regional sub-rates — the exact figure for a job comes from the determination that names that county.
| Classification | Type | Basic hourly rate | Fringe | Rate lines |
|---|---|---|---|---|
| Asbestos Worker/heat & Frost Insulator | Building | $49.10 – $55.45 | $36.63 | 2 |
| Boilermaker | Building | $50.62 | $28.82 | 2 |
| Boilermaker | Heavy | $50.62 | $28.82 | 3 |
| Boilermaker | Residential | $50.62 | $28.82 | 2 |
| Bricklayer | Building | $50.81 – $64.50 | $32.27 – $37.54 | 6 |
| Bricklayer | Heavy | $50.81 – $64.50 | $32.27 – $37.54 | 5 |
| Bricklayer | Residential | $62.40 – $64.50 | $34.40 – $37.54 | 3 |
| Bricklayer And Plasterer | Building | $60.26 – $64.50 | $33.71 – $37.54 | 2 |
| Bricklayer, Cement Mason And Plasterer | Building | $64.50 | $37.54 | 4 |
| Bricklayer, Cement Mason, Plasterer | Building | $60.26 | $33.71 | 1 |
| Bricklayer, Cement Mason, Plasterer | Residential | $64.50 | $37.54 | 1 |
| Bricklayer, Cement Mason, Plasterer & Stonemason | Heavy | $50.81 | $32.27 | 1 |
| Bricklayer, Cement Mason, Plasterer & | Heavy | $60.26 | $33.71 | 3 |
| Bricklayer, Plasterer | Heavy | $64.50 | $37.54 | 1 |
| Bricklayer, Plasterer | Residential | $64.50 | $37.54 | 4 |
| Bricklayer, Plasterer, Stonemason | Residential | $60.26 – $62.40 | $33.71 – $34.40 | 2 |
| Bricklayer, Plasterers, Stonemasons, Tile Layers | Residential | $50.81 | $32.27 | 1 |
| Bricklayer/cement Mason | Heavy | $60.35 – $64.50 | $34.40 – $37.54 | 4 |
| Bricklayers | Heavy | $50.81 | $32.27 | 1 |
| Bricklayers | Residential | $50.81 | $32.27 | 1 |
| Carpenter | Building | $39.28 – $61.19 | $27.82 – $31.55 | 9 |
| Carpenter | Heavy | $39.28 – $61.19 | $27.82 – $31.55 | 8 |
| Carpenter | Highway | $43.33 – $50.10 | $21.41 – $31.45 | 6 |
| Carpenter | Residential | $43.33 | $27.82 | 1 |
| Carpenter, Includes Form Work | Highway | $33.03 – $66.59 | $15.41 – $22.09 | 6 |
| Carpenter, New Wood Frame Construction Not Exceeding 4… | Residential | $26.55 | $13.02 | 8 |
| Carpenter/lather | Heavy | $50.10 | $31.45 | 2 |
| Carpenter/lather/drywall Applicator | Building | $43.33 | $27.82 | 1 |
| Carpenters | Residential | $39.28 – $61.19 | $27.82 – $31.55 | 7 |
| Carpenters, New Wood Frame Construction Not Exceeding 4… | Residential | $31.61 | $14.02 | 2 |
| Cement Mason/concrete Finisher | Building | $49.19 | $40.86 | 1 |
| Cement Mason/concrete Finisher | Heavy | $49.19 | $40.86 | 1 |
| Cement Mason/concrete Finisher | Highway | $52.13 – $56.70 | $20.89 – $21.08 | 11 |
| Cement Mason/concrete Finisher | Residential | $39.38 | $0.00 | 1 |
| Diver | Heavy | $78.11 | $35.47 | 3 |
| Diver Tender | Heavy | $61.70 | $35.47 | 3 |
| Dredging | Heavy | $30.86 – $48.48 | $14.15 – $15.34 | 7 |
| Electrician | Building | $36.12 – $66.17 | $24.74 – $37.08 | 11 |
| Electrician | Heavy | $48.16 – $66.17 | $24.74 – $37.08 | 9 |
| Electrician | Highway | $47.13 – $66.17 | $13.41 – $37.08 | 10 |
| Electrician | Residential | $48.16 – $66.17 | $24.74 – $37.08 | 11 |
| Electrician, Includes Traffic Signalization | Highway | $45.13 | $13.86 | 1 |
| Elevator Mechanic | Building | $66.41 | $38.44 | 2 |
| Elevator Mechanic | Heavy | $66.41 | $38.44 | 1 |
| Elevator Mechanic | Residential | $66.41 – $74.17 | $38.44 | 3 |
| Elevator Mechanic Footnote For Elevator Mechanics | Building | $74.17 | $38.44 | 2 |
| Elevator Mechanic Footnote For Elevator Mechanics | Residential | $74.17 | $38.44 | 1 |
| Floor Layer | Building | $43.23 – $57.49 | $27.79 – $31.75 | 4 |
| Floor Layer | Residential | $31.96 – $49.18 | $0.00 – $31.75 | 3 |
| Glazier | Building | $43.13 – $46.26 | $21.00 – $36.00 | 4 |
| Glazier | Heavy | $46.26 | $36.00 | 1 |
| Glazier | Residential | $43.13 | $21.00 | 1 |
| Hazardous Material Handler | Building | $55.45 | $36.63 | 1 |
| Insulator/asbestos Worker | Building | $44.36 – $55.45 | $36.63 | 4 |
| Insulator/asbestos Worker | Heavy | $49.10 | $36.63 | 1 |
| Insulator/asbestos Worker | Residential | $44.36 | $36.63 | 1 |
| Ironworker | Building | $40.75 – $57.87 | $31.91 – $37.67 | 6 |
| Ironworker | Heavy | $40.75 – $57.87 | $31.91 – $37.67 | 7 |
| Ironworker | Highway | $41.89 – $57.87 | $33.90 – $37.67 | 12 |
| Ironworker | Residential | $41.89 – $43.03 | $33.53 – $33.90 | 2 |
| Ironworker, Reinforcing | Highway | $41.89 – $57.39 | $18.15 – $33.90 | 11 |
| Ironworker, Structural | Highway | $43.03 – $57.57 | $17.30 – $37.67 | 3 |
| Ironworkers | Building | $40.75 – $57.87 | $31.91 – $37.67 | 4 |
| Ironworkers | Heavy | $40.75 – $41.00 | $31.91 | 2 |
| Laborer | Building | $38.95 – $39.84 | $12.04 – $29.81 | 4 |
| Laborer | Highway | $30.80 – $46.20 | $4.49 – $29.85 | 73 |
| Laborer | Residential | $18.73 | $6.33 | 1 |
| Laborer Landscape | Highway | $33.25 – $38.95 | $22.92 – $29.41 | 3 |
| Laborers | Building | $27.01 – $47.25 | $25.63 – $29.70 | 37 |
| Laborers | Heavy | $27.01 – $58.43 | $26.65 – $29.70 | 124 |
| Laborers | Residential | $27.01 – $47.25 | $25.63 – $29.70 | 32 |
| Line Construction | Building | $32.13 – $58.41 | $12.70 – $30.19 | 7 |
| Line Construction | Heavy | $32.13 – $58.41 | $12.70 – $30.19 | 8 |
| Marble & Tile Finisher | Building | $49.32 | $35.26 | 1 |
| Marble & Tile Finisher | Heavy | $49.32 | $35.26 | 2 |
| Marble & Tile Finisher | Residential | $49.32 | $35.26 | 1 |
| Marble Finisher | Building | $28.43 | $25.85 | 1 |
| Marble, Tile & Terrazzo Workers | Building | $64.52 | $37.51 | 1 |
| Marble, Tile & Terrazzo Workers | Heavy | $64.52 | $37.51 | 2 |
| Marble, Tile & Terrazzo Workers | Residential | $64.52 | $37.51 | 1 |
| Millwright | Building | $43.42 – $50.47 | $33.00 – $33.50 | 3 |
| Millwright | Heavy | $43.42 – $50.47 | $33.00 – $33.50 | 4 |
| Operator | Highway | $40.83 – $64.67 | $0.00 – $23.49 | 40 |
| Painter | Building | $38.08 – $46.26 | $31.95 – $36.00 | 4 |
| Painter | Heavy | $38.78 – $56.76 | $31.85 – $36.00 | 8 |
| Painter | Highway | $37.50 – $56.76 | $0.00 – $36.00 | 23 |
| Painter | Residential | $30.86 – $39.86 | $0.00 – $31.85 | 5 |
| Painter Bridge | Heavy | $56.76 | $36.00 | 2 |
| Painter Brush, Taper | Building | $44.32 – $46.26 | $36.00 | 4 |
| Painter Brush, Taper | Heavy | $44.32 – $46.26 | $36.00 | 2 |
| Painter Repaint | Building | $35.40 – $36.80 | $31.95 | 2 |
| Painter Repaint | Heavy | $35.40 – $56.76 | $31.85 – $36.00 | 4 |
| Painter Spay New Construction | Heavy | $47.66 | $36.00 | 1 |
| Painter Spray, Sandblast | Building | $45.72 – $47.66 | $36.00 | 4 |
| Painters | Residential | $44.32 – $47.66 | $36.00 | 4 |
| Piledriverman | Building | $49.19 – $55.79 | $35.47 | 4 |
| Piledriverman | Heavy | $49.19 – $55.79 | $35.47 | 5 |
| Piledriverman | Highway | $45.65 | $23.33 | 3 |
| Pipefitter | Building | $66.58 | $39.22 | 1 |
| Pipefitter | Heavy | $66.58 | $39.22 | 1 |
| Pipefitter Including HVAC Work | Residential | $66.58 | $39.22 | 1 |
| Plasterer | Building | $49.19 | $40.86 | 1 |
| Plasterer | Residential | $43.97 | $33.87 | 1 |
| Plasterer Tender | Building | $38.95 – $46.10 | $29.70 | 3 |
| Plumber | Building | $69.84 | $36.43 | 2 |
| Plumber | Heavy | $69.84 | $36.43 | 3 |
| Plumber | Residential | $69.84 | $36.43 | 2 |
| Plumber And Steamfitter | Building | $52.26 – $55.00 | $31.05 – $31.57 | 2 |
| Plumber And Steamfitter | Heavy | $52.26 – $55.00 | $31.05 – $31.57 | 2 |
| Plumber And Steamfitter | Residential | $52.26 – $55.00 | $31.05 – $31.57 | 3 |
| Plumber, Pipefitter, Steamfitter | Heavy | $69.84 | $36.43 | 1 |
| Plumber/pipefitter | Building | $52.49 – $55.00 | $31.57 – $33.60 | 2 |
| Plumbers And Pipefitters | Building | $52.26 – $55.00 | $31.05 – $33.60 | 3 |
| Plumbers And Pipefitters | Heavy | $52.26 – $55.00 | $31.05 – $33.60 | 4 |
| Plumbers And Pipefitters | Residential | $52.49 | $33.60 | 1 |
| Plumbers, Pipefitters | Residential | $52.26 – $55.00 | $31.05 – $33.60 | 4 |
| Power Equipment Operator | Building | $57.18 – $57.83 | $33.70 | 4 |
| Power Equipment Operator | Highway | $39.12 – $57.83 | $31.04 – $33.70 | 36 |
| Power Equipment Operator | Residential | $41.23 – $57.18 | $30.58 – $33.70 | 3 |
| Power Equipment Operators | Building | $25.02 – $57.83 | $30.58 – $33.70 | 21 |
| Power Equipment Operators | Heavy | $25.02 – $57.83 | $31.04 – $33.70 | 42 |
| Power Equipment Operators | Highway | $39.12 – $46.38 | $31.04 | 4 |
| Power Equipment Operators | Residential | $25.02 – $57.83 | $30.58 – $33.70 | 21 |
| Roofer | Building | $53.53 | $35.69 | 2 |
| Roofer | Residential | $42.48 | $30.14 | 1 |
| Roofer, Waterproofers/caulkers | Residential | $42.48 – $53.53 | $30.14 – $35.69 | 2 |
| Roofers | Building | $42.48 – $53.53 | $30.14 – $35.69 | 3 |
| Roofers | Heavy | $53.53 | $35.69 | 1 |
| Roofers | Residential | $42.48 – $53.53 | $30.14 – $35.69 | 3 |
| Sheet Metal Worker | Building | $43.48 – $60.00 | $36.46 – $48.78 | 5 |
| Sheet Metal Worker | Heavy | $43.48 – $60.00 | $36.46 – $48.78 | 2 |
| Sheet Metal Worker | Residential | $43.48 – $60.00 | $36.46 – $48.78 | 6 |
| Sprinkler Fitter | Building | $53.25 – $72.05 | $29.75 – $40.76 | 5 |
| Sprinkler Fitter | Heavy | $53.25 | $29.75 | 1 |
| Sprinkler Fitter | Residential | $49.70 | $29.75 | 2 |
| Teledata System Installer | Building | $36.12 – $52.94 | $19.71 – $34.74 | 5 |
| Teledata System Installer | Heavy | $36.12 – $42.09 | $19.71 – $34.51 | 2 |
| Teledata System Installer | Residential | $36.12 – $52.94 | $28.47 – $34.74 | 4 |
| Terrazzo Finisher | Building | $63.44 | $37.33 | 1 |
| Terrazzo Finisher | Heavy | $63.44 | $37.33 | 2 |
| Terrazzo Finisher | Residential | $63.44 | $37.33 | 1 |
| Tile Finisher | Building | $49.32 | $35.26 | 2 |
| Tile Layer | Residential | $64.50 | $37.54 | 1 |
| Tile Setter | Building | $64.52 | $37.51 | 2 |
| Traffic Control | Highway | $23.00 – $53.35 | $12.41 – $26.65 | 20 |
| Truck Driver | Highway | $30.00 – $48.53 | $0.00 – $37.35 | 33 |
| Truck Drivers | Building | $40.78 – $41.82 | $37.35 | 14 |
| Truck Drivers | Heavy | $40.78 – $41.82 | $37.35 | 21 |
| Truck Drivers | Residential | $40.78 – $41.82 | $37.35 | 14 |
The determinations
Read the scope before the table: a determination covers the counties and construction types listed here, and the contract that incorporates it fixes its version.
| Determination | Newest effective | Types | Counties | Rate lines |
|---|---|---|---|---|
| MA20260001 Mod 1 | May 18, 2026 | Building | 8 | 113 |
| MA20260002 Mod 1 | May 18, 2026 | Heavy | 1 | 113 |
| MA20260003 Mod 1 | May 18, 2026 | Building | 4 | 68 |
| MA20260004 Mod 2 | Aug 6, 2026 | Residential | 11 | 62 |
| MA20260006 Mod 2 | May 18, 2026 | Heavy | 14 | 7 |
| MA20260007 Mod 1 | May 18, 2026 | Highway | 1 | 11 |
| MA20260008 Mod 1 | May 18, 2026 | Heavy | 9 | 123 |
| MA20260009 Mod 1 | May 18, 2026 | Residential | 2 | 49 |
| MA20260010 Mod 1 | May 18, 2026 | Heavy | 4 | 70 |
| MA20260011 Mod 1 | May 18, 2026 | Residential | 1 | 58 |
| MA20260012 Mod 1 | May 18, 2026 | Building | 1 | 18 |
| MA20260013 Mod 1 | May 18, 2026 | Building | 1 | 17 |
| MA20260014 Mod 1 | May 18, 2026 | Highway | 2 | 9 |
| MA20260015 Mod 1 | May 18, 2026 | Highway | 1 | 25 |
| MA20260016 Mod 1 | May 18, 2026 | Highway | 1 | 25 |
| MA20260017 Mod 1 | May 18, 2026 | Highway | 1 | 25 |
| MA20260018 Mod 1 | May 18, 2026 | Highway | 1 | 24 |
| MA20260019 Mod 1 | May 18, 2026 | Highway | 1 | 24 |
| MA20260020 Mod 1 | May 18, 2026 | Highway | 1 | 24 |
| MA20260021 Mod 1 | May 18, 2026 | Highway | 1 | 24 |
| MA20260022 Mod 1 | May 18, 2026 | Highway | 1 | 26 |
| MA20260023 Mod 1 | May 18, 2026 | Highway | 1 | 26 |
| MA20260024 Mod 1 | May 18, 2026 | Highway | 1 | 26 |
| MA20260025 Mod 1 | May 18, 2026 | Highway | 1 | 26 |
How to use a federal rate on a Massachusetts job
- Confirm which law governs. Federal or federally assisted money brings Davis-Bacon and the determination. State money brings the state schedule. A job with both must satisfy both.
- Take the determination from the contract. The number and modification printed there control, even if a newer determination exists.
- Split base from fringe. Overtime is 1.5× the basic hourly rate; the fringe obligation continues and is not multiplied.
- Map it onto the payroll. Field 5 takes the determination and modification, columns 6A–6C take base, plan credit and cash fringe — see the WH-347 guide.
Questions
What is the prevailing wage in Massachusetts?
There is no single number. 24 active federal determinations cover 14 counties with 993 rate lines; the rate depends on the classification, the county, the construction type and the determination your contract incorporates.
Are these the rates for state-funded work?
No. These are federal Davis-Bacon determinations. Massachusetts state public works use the state agency's own schedule, which is a separate set and often higher.
Why do some counties show several determinations?
Because building, heavy, highway and residential work are published separately, and a county is usually named in more than one of them. Use the construction type that matches the work, not the one with the highest rate.
Turn this rate into a checked payroll
Pick the county and type once, and WageDecoder fills the determination number, checks the classification, the fringe credit and the overtime base, then writes the official WH-347. Free, no account, nothing uploaded.