Prevailing wage rates in Pennsylvania
Every active federal Davis-Bacon determination that covers Pennsylvania: 110 determinations, 67 counties, 3500 rate lines, newest effective Nov 12, 2026. Pick your county below, or read the rate ranges by trade.
What this page covers
State-funded work is separate. Pennsylvania public works are governed by Pennsylvania Prevailing Wage Act of 1961, 43 P.S. §§ 165-1 to 165-17 and administered by Department of Labor & Industry, Bureau of Labor Law Compliance, covering contracts above $25,000. The state form is the Certified Payroll. A federal determination does not replace the state rate, and on a project covered by both laws you must satisfy both — usually the higher rate plus each law's paperwork.
State rules, the filing clock and the penalty: Pennsylvania certified payroll.
Counties covered
Each row is a Pennsylvania county that appears in an active federal determination. The count is the number of determinations naming that county — usually one per construction type.
| County | Determinations | Construction types | Newest effective | Look up |
|---|---|---|---|---|
| Adams | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Allegheny | 6 | Building, Heavy, Highway, Residential | Nov 12, 2026 | Rates → |
| Armstrong | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Beaver | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Bedford | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Berks | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Blair | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Bradford | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Bucks | 5 | Heavy, Highway, Building, Residential | Oct 1, 2026 | Rates → |
| Butler | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Cambria | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Cameron | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Carbon | 6 | Heavy, Highway, Building, Residential | Sep 17, 2026 | Rates → |
| Centre | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Chester | 5 | Heavy, Highway, Building, Residential | Oct 1, 2026 | Rates → |
| Clarion | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Clearfield | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Clinton | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Columbia | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Crawford | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Cumberland | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Dauphin | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Delaware | 5 | Heavy, Highway, Building, Residential | Oct 1, 2026 | Rates → |
| Elk | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Erie | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Fayette | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Forest | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Franklin | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Fulton | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Greene | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Huntingdon | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Indiana | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Jefferson | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Juniata | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Lackawanna | 6 | Heavy, Highway, Residential, Building | Sep 17, 2026 | Rates → |
| Lancaster | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Lawrence | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Lebanon | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Lehigh | 6 | Heavy, Highway, Building, Residential | Sep 17, 2026 | Rates → |
| Luzerne | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Lycoming | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| McKean | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Mercer | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Mifflin | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Monroe | 6 | Heavy, Highway, Residential, Building | Sep 17, 2026 | Rates → |
| Montgomery | 5 | Heavy, Highway, Building, Residential | Oct 1, 2026 | Rates → |
| Montour | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Northampton | 6 | Heavy, Highway, Building, Residential | Sep 24, 2026 | Rates → |
| Northumberland | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Perry | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
| Philadelphia | 5 | Building, Heavy, Highway, Residential | Oct 1, 2026 | Rates → |
| Pike | 6 | Heavy, Highway, Residential, Building | Sep 17, 2026 | Rates → |
| Potter | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Schuylkill | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Snyder | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Somerset | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Sullivan | 6 | Heavy, Highway, Residential, Building | Sep 17, 2026 | Rates → |
| Susquehanna | 6 | Heavy, Highway, Residential, Building | Sep 17, 2026 | Rates → |
| Tioga | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Union | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Venango | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Warren | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Washington | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Wayne | 6 | Heavy, Highway, Residential, Building | Sep 17, 2026 | Rates → |
| Westmoreland | 6 | Heavy, Highway, Residential, Building | Nov 12, 2026 | Rates → |
| Wyoming | 6 | Heavy, Highway, Residential, Building | Sep 17, 2026 | Rates → |
| York | 6 | Heavy, Highway, Building, Residential | Nov 12, 2026 | Rates → |
Rates by trade and construction type
These are the ranges across every Pennsylvania county in the current determinations. A range means the same classification carries different rates in different counties, or the determination lists regional sub-rates — the exact figure for a job comes from the determination that names that county.
| Classification | Type | Basic hourly rate | Fringe | Rate lines |
|---|---|---|---|---|
| Asbestos Worker/heat & Frost Insulator | Building | $39.18 – $60.84 | $26.07 – $48.38 | 35 |
| Asbestos Worker/heat & Frost Insulator - Mechanical | Building | $30.41 – $43.00 | $18.79 – $29.81 | 30 |
| Asbestos Worker/insulator | Building | $46.50 – $60.84 | $29.43 – $48.38 | 2 |
| Asbestos Workers/insulator | Residential | $39.18 – $46.50 | $26.07 – $29.43 | 2 |
| Boilermaker | Building | $48.28 – $55.00 | $33.17 – $35.48 | 67 |
| Boilermaker | Heavy | $35.34 – $55.00 | $18.48 – $35.48 | 9 |
| Boilermaker | Highway | $35.34 – $55.00 | $18.48 – $35.48 | 5 |
| Boilermaker | Residential | $48.28 – $55.00 | $33.17 – $35.48 | 2 |
| Bricklayer | Building | $30.34 – $48.70 | $13.85 – $31.61 | 60 |
| Bricklayer | Heavy | $28.64 – $37.83 | $16.98 – $24.67 | 18 |
| Bricklayer | Highway | $28.64 – $36.55 | $17.20 – $24.49 | 8 |
| Bricklayer | Residential | $7.25 – $45.45 | $0.00 – $30.16 | 44 |
| Bricklayer, Includes Pointing, Caulking, And Cleaning | Building | $28.56 | $11.56 | 1 |
| Bricklayer, Including Pointing, Caulking Cleaning And Brick… | Building | $34.17 – $37.17 | $22.94 – $23.43 | 7 |
| Bricklayer, Stonemason | Heavy | $31.35 – $37.07 | $13.85 – $24.14 | 12 |
| Bricklayer, Stonemason | Highway | $32.66 – $34.14 | $16.87 – $22.77 | 3 |
| Bricklayer, Stonemason | Residential | $32.39 – $37.07 | $16.06 – $18.82 | 2 |
| Bricklayer, Stonemason & Marble Setter | Heavy | $34.14 | $22.00 | 2 |
| Bricklayer, Stonemason & Marble Setter | Highway | $34.14 | $22.00 | 1 |
| Carpenter | Building | $23.39 – $51.67 | $0.00 – $32.66 | 133 |
| Carpenter | Heavy | $27.03 – $57.36 | $11.43 – $30.09 | 14 |
| Carpenter | Highway | $37.63 – $57.36 | $21.18 – $30.09 | 7 |
| Carpenter | Residential | $7.50 – $57.72 | $0.00 – $30.39 | 43 |
| Carpenter & Soft Floor Layer | Heavy | $24.77 – $28.88 | $8.69 – $15.65 | 7 |
| Carpenter & Soft Floor Layer | Residential | $28.02 | $12.59 | 1 |
| Carpenter, Excludes Acoustical Ceiling Installation, Batt… | Residential | $47.60 | $28.94 | 2 |
| Carpenter, Excludes Acoustical Ceiling Installation, Drywall… | Building | $22.68 – $25.57 | $7.71 – $10.53 | 2 |
| Carpenter, Excludes Acoustical Ceiling Installation, Drywall… | Building | $17.32 – $25.93 | $6.08 – $11.29 | 4 |
| Carpenter, Excludes Drywall Hanging And Metal Stud… | Building | $25.71 | $10.62 | 1 |
| Carpenter/lather | Building | $42.11 – $57.72 | $23.21 – $30.39 | 2 |
| Cement Mason | Residential | $21.94 | $10.39 | 1 |
| Cement Mason/concrete Finisher | Building | $19.07 – $48.70 | $5.50 – $32.26 | 67 |
| Cement Mason/concrete Finisher | Heavy | $34.05 – $46.55 | $14.30 – $32.66 | 13 |
| Cement Mason/concrete Finisher | Highway | $34.05 – $46.55 | $14.30 – $32.66 | 7 |
| Cement Mason/concrete Finisher | Residential | $7.25 – $37.13 | $0.00 – $21.89 | 7 |
| Diver | Heavy | $64.70 | $23.42 | 2 |
| Diver | Highway | $64.70 | $23.42 | 1 |
| Dredging | Heavy | $30.86 – $48.48 | $14.15 – $15.34 | 7 |
| Drywall Finisher | Residential | $15.08 | $3.40 | 1 |
| Drywall Finisher/taper | Building | $32.39 – $42.25 | $23.26 – $32.16 | 2 |
| Drywall Finisher/taper | Residential | $7.88 – $32.39 | $0.48 – $23.26 | 7 |
| Drywall Hanger | Residential | $10.00 | $0.00 | 1 |
| Drywall Taper | Residential | $7.25 | $0.00 | 1 |
| Electrician | Building | $15.00 – $75.05 | $2.21 – $47.77 | 127 |
| Electrician | Heavy | $35.00 – $75.05 | $23.29 – $47.02 | 38 |
| Electrician | Highway | $35.00 – $75.05 | $23.70 – $47.02 | 16 |
| Electrician | Residential | $8.80 – $75.05 | $0.00 – $47.02 | 35 |
| Electrician, Excludes Alarm Installation, Sound And… | Building | $26.80 – $30.42 | $13.68 – $16.73 | 4 |
| Elevator Mechanic | Building | $61.07 | $38.44 | 1 |
| Elevator Mechanic | Residential | $61.07 | $38.44 | 3 |
| Elevator Mechanic Footnotes | Building | $58.70 – $61.41 | $38.44 | 31 |
| Elevator Mechanic Footnotes | Residential | $61.41 | $38.44 | 1 |
| Elevator Mechanic Footnotes For Elevator Mechanics | Building | $71.85 | $38.44 | 5 |
| Floor Layer | Building | $18.78 – $56.51 | $5.02 – $32.39 | 21 |
| Floor Layer | Heavy | $28.11 – $33.75 | $13.88 – $24.69 | 5 |
| Floor Layer | Residential | $7.25 – $35.20 | $0.00 – $17.02 | 5 |
| For Brick Refractory Work | Building | $34.14 – $37.00 | $22.00 – $24.49 | 13 |
| Glazier | Building | $20.00 – $46.09 | $1.54 – $34.83 | 48 |
| HVAC Mechanic | Building | $17.00 – $53.09 | $2.35 – $34.80 | 4 |
| Industrial | Building | $43.62 | $20.23 | 2 |
| Insulation Mechanic | Residential | $7.25 | $0.00 | 1 |
| Ironworker | Building | $32.29 – $56.50 | $22.55 – $45.30 | 82 |
| Ironworker | Heavy | $31.65 – $56.50 | $24.50 – $45.30 | 24 |
| Ironworker | Highway | $31.65 – $56.50 | $24.50 – $45.30 | 16 |
| Ironworker | Residential | $33.57 – $38.89 | $28.16 – $34.54 | 4 |
| Ironworker, Ornamental | Building | $34.27 | $22.55 | 1 |
| Ironworker, Reinforcing | Building | $26.24 – $56.50 | $6.47 – $45.30 | 11 |
| Ironworker, Rigger | Building | $35.22 – $38.89 | $30.56 – $34.54 | 6 |
| Ironworker, Structural | Building | $25.96 – $38.89 | $21.20 – $34.54 | 14 |
| Ironworker, Structural | Heavy | $37.26 | $32.63 | 1 |
| Ironworker, Structural, Reinforcing And Ornamental | Building | $37.26 – $38.89 | $32.63 – $34.54 | 6 |
| Ironworkers | Residential | $37.26 | $32.63 | 1 |
| Laborer | Building | $10.04 – $41.00 | $0.00 – $27.04 | 288 |
| Laborer | Heavy | $20.21 – $43.90 | $12.93 – $27.14 | 69 |
| Laborer | Highway | $26.61 – $43.90 | $19.99 – $27.14 | 34 |
| Laborer | Residential | $7.25 – $39.10 | $0.45 – $26.69 | 20 |
| Laborer, Common | Residential | $26.09 | $19.93 | 1 |
| Laborer, Unskilled | Residential | $7.25 – $16.32 | $0.00 – $9.09 | 18 |
| Landscape Laborer Farm Tractor Driver, Hydroseeder Nozzleman… | Building | $31.73 | $23.72 | 1 |
| Landscaping | Building | $26.37 – $27.09 | $19.03 | 3 |
| Line Construction | Building | $32.63 – $62.54 | $22.68 – $32.92 | 9 |
| Line Construction | Heavy | $31.92 – $68.06 | $16.02 – $44.04 | 31 |
| Line Construction | Highway | $31.92 – $68.06 | $16.02 – $44.04 | 31 |
| Marble & Tile Setter | Heavy | $31.12 – $35.13 | $16.52 – $21.11 | 5 |
| Marble Finisher | Building | $25.10 | $20.75 | 1 |
| Marble Mason | Heavy | $31.39 – $34.14 | $22.77 – $22.97 | 4 |
| Marble Mason | Highway | $34.14 | $22.77 | 1 |
| Marble Setter | Building | $44.90 | $30.75 | 1 |
| Mason - Stone | Building | $31.24 – $48.40 | $13.85 – $31.95 | 38 |
| Mason - Stone | Heavy | $38.56 | $23.36 | 1 |
| Mechanical Insulator, Including Duct And Pipe And Excluding… | Building | $30.60 | $17.16 | 8 |
| Millwright | Building | $28.48 – $55.54 | $12.65 – $40.47 | 55 |
| Millwright | Heavy | $34.00 – $55.54 | $17.05 – $40.47 | 9 |
| Millwright | Highway | $45.20 – $55.54 | $25.30 – $40.47 | 5 |
| Millwright | Residential | $49.00 – $55.54 | $26.29 – $40.47 | 5 |
| Operator | Building | $26.96 – $44.13 | $0.00 – $29.82 | 42 |
| Operator | Residential | $31.05 – $50.80 | $15.75 – $28.89 | 14 |
| Painter | Building | $25.84 – $42.49 | $13.53 – $30.72 | 157 |
| Painter | Heavy | $22.75 – $61.81 | $12.05 – $32.09 | 53 |
| Painter | Highway | $22.75 – $61.81 | $12.05 – $32.09 | 31 |
| Painter | Residential | $7.25 – $42.97 | $0.00 – $31.19 | 30 |
| Painters | Residential | $14.30 – $30.02 | $6.31 – $21.14 | 6 |
| Piledriverman | Building | $37.63 – $48.25 | $21.18 – $44.92 | 19 |
| Piledriverman | Heavy | $37.63 – $48.25 | $21.18 – $44.92 | 9 |
| Piledriverman | Highway | $37.63 – $48.25 | $21.18 – $44.92 | 5 |
| Pipefitter | Building | $40.02 – $72.52 | $6.89 – $44.58 | 111 |
| Plasterer | Building | $20.97 – $45.08 | $10.78 – $33.59 | 34 |
| Plasterer | Heavy | $24.91 – $43.78 | $12.86 – $32.89 | 11 |
| Plasterer | Highway | $31.33 – $43.78 | $20.75 – $32.89 | 3 |
| Plasterer | Residential | $18.04 – $37.81 | $4.94 – $13.70 | 5 |
| Plumber | Building | $24.31 – $73.73 | $2.62 – $42.78 | 81 |
| Plumber | Heavy | $56.28 – $73.73 | $35.51 – $39.86 | 2 |
| Plumber | Highway | $73.73 | $39.86 | 1 |
| Plumber | Residential | $7.25 – $73.73 | $0.00 – $39.86 | 34 |
| Plumber And Pipefitter | Heavy | $35.54 – $48.65 | $19.97 – $25.47 | 6 |
| Plumber And Pipefitter | Highway | $35.54 – $48.65 | $19.97 – $25.47 | 3 |
| Plumber And Steamfitter | Heavy | $41.36 – $51.69 | $27.07 – $29.45 | 2 |
| Plumber And Steamfitter | Residential | $23.75 – $51.69 | $15.30 – $27.07 | 2 |
| Plumber, Excludes HVAC Pipe Installation And Work On… | Building | $30.14 | $18.83 | 1 |
| Plumber, Excludes HVAC Unit Installation | Building | $29.28 | $13.45 | 1 |
| Plumber/pipefitter | Residential | $23.75 | $15.30 | 1 |
| Pointer, Caulker And Cleaner | Building | $50.00 | $30.70 | 1 |
| Power Equipment Operator | Building | $21.89 – $57.52 | $5.87 – $35.38 | 499 |
| Power Equipment Operator | Heavy | $33.68 – $56.37 | $24.03 – $34.53 | 68 |
| Power Equipment Operator | Highway | $37.05 – $56.37 | $24.66 – $34.53 | 38 |
| Power Equipment Operator | Residential | $17.34 – $42.12 | $4.06 – $28.60 | 15 |
| Power Equipment Operator Paver | Building | $36.87 | $21.32 | 1 |
| Power Equipment Operators | Residential | $7.25 – $31.05 | $0.00 – $15.75 | 23 |
| Roofer | Building | $22.55 – $41.48 | $2.51 – $33.37 | 75 |
| Roofer | Heavy | $29.81 – $41.21 | $18.09 – $31.80 | 7 |
| Roofer | Residential | $7.25 – $36.70 | $0.00 – $21.75 | 24 |
| Roofer, Excludes Installation Of Metal Roofs | Building | $22.98 – $24.13 | $11.86 – $11.95 | 8 |
| Roofer, Excludes Metal Roof Installation And Waterproofing | Building | $26.56 | $17.98 | 2 |
| Roofer, Excludes Waterproofing | Building | $16.76 – $33.50 | $2.78 – $22.10 | 9 |
| Roofers | Residential | $34.35 – $37.35 | $21.85 | 2 |
| Sheet Metal | Residential | $28.00 | $10.87 | 1 |
| Sheet Metal Mechanic | Residential | $7.25 | $0.00 | 1 |
| Sheet Metal Worker | Building | $29.56 – $62.62 | $19.21 – $50.66 | 97 |
| Sheet Metal Worker | Heavy | $29.51 – $46.75 | $22.14 – $44.09 | 6 |
| Sheet Metal Worker | Residential | $8.23 – $62.62 | $0.00 – $50.66 | 21 |
| Sheet Metal Worker, Excludes HVAC Duct Installation | Building | $28.66 – $32.03 | $19.73 – $27.03 | 5 |
| Soft Floor Layer | Residential | $35.20 – $41.93 | $17.02 – $29.49 | 5 |
| Sprinkler Fitter | Building | $30.95 – $66.22 | $18.46 – $34.25 | 61 |
| Sprinkler Fitter | Residential | $49.75 | $28.96 | 1 |
| Steamfitter | Building | $72.52 | $44.58 | 1 |
| Steamfitter | Heavy | $59.65 – $72.52 | $42.78 – $44.58 | 2 |
| Steamfitter | Highway | $72.52 | $44.58 | 1 |
| Tender | Heavy | $43.13 | $23.42 | 2 |
| Tender | Highway | $43.13 | $23.42 | 1 |
| Terrazzo Finisher | Building | $27.03 – $33.23 | $19.03 – $20.58 | 7 |
| Terrazzo Finisher | Heavy | $32.26 | $18.48 | 1 |
| Terrazzo Worker/grinder | Building | $33.94 | $19.03 | 6 |
| Terrazzo Worker/setter | Building | $33.83 – $48.01 | $20.78 – $28.67 | 7 |
| Terrazzo Worker/setter | Heavy | $32.91 – $35.49 | $20.11 – $20.32 | 2 |
| Terrazzo Worker/setter | Residential | $35.49 | $20.32 | 1 |
| Tile Finisher | Building | $20.65 – $32.62 | $8.24 – $21.00 | 66 |
| Tile Setter | Building | $24.30 – $51.36 | $10.14 – $30.02 | 67 |
| Tile Setter | Heavy | $35.64 | $21.63 | 2 |
| Tile Setter | Residential | $7.25 – $35.64 | $0.00 – $21.63 | 3 |
| Truck Driver | Building | $19.77 – $38.39 | $0.00 – $24.02 | 67 |
| Truck Driver | Heavy | $25.96 – $42.43 | $0.00 – $24.02 | 23 |
| Truck Driver | Highway | $25.96 – $42.43 | $0.00 – $24.02 | 13 |
| Truck Driver | Residential | $7.25 – $42.43 | $0.00 | 7 |
| Truck Driver, Building Construction | Building | $37.57 – $37.92 | $23.32 | 3 |
| Truck Driver, Site Preparation, Paving And Utilities On… | Building | $37.57 – $37.92 | $23.32 | 3 |
| Tv Inspection And Grouting | Heavy | $8.69 – $11.58 | $0.17 – $1.36 | 4 |
| Window Tinter | Building | $25.02 | $13.06 | 1 |
The determinations
Read the scope before the table: a determination covers the counties and construction types listed here, and the contract that incorporates it fixes its version.
| Determination | Newest effective | Types | Counties | Rate lines |
|---|---|---|---|---|
| PA20260001 Mod 7 | Nov 12, 2026 | Building | 1 | 37 |
| PA20260002 Mod 6 | Sep 17, 2026 | Heavy, Highway | 33 | 101 |
| PA20260003 Mod 2 | Oct 1, 2026 | Building | 1 | 63 |
| PA20260004 Mod 8 | Oct 1, 2026 | Heavy, Highway | 5 | 60 |
| PA20260005 Mod 4 | Nov 12, 2026 | Residential | 3 | 23 |
| PA20260006 Mod 2 | Sep 17, 2026 | Heavy, Highway | 29 | 70 |
| PA20260008 Mod 1 | May 18, 2026 | Heavy | 67 | 4 |
| PA20260011 Mod 2 | Aug 20, 2026 | Residential | 1 | 13 |
| PA20260012 Mod 4 | Nov 12, 2026 | Residential | 1 | 15 |
| PA20260015 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260018 Mod 6 | Sep 17, 2026 | Heavy | 29 | 112 |
| PA20260019 Mod 2 | May 18, 2026 | Residential | 2 | 15 |
| PA20260020 Mod 7 | Sep 18, 2026 | Heavy | 33 | 117 |
| PA20260021 Mod 2 | May 18, 2026 | Residential | 1 | 7 |
| PA20260023 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260025 Mod 1 | May 18, 2026 | Residential | 5 | 19 |
| PA20260026 Mod 1 | May 18, 2026 | Residential | 2 | 9 |
| PA20260027 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260028 Mod 2 | May 18, 2026 | Heavy | 67 | 7 |
| PA20260029 Mod 1 | May 18, 2026 | Residential | 7 | 12 |
| PA20260030 Mod 1 | May 18, 2026 | Residential | 6 | 6 |
| PA20260031 Mod 1 | May 18, 2026 | Residential | 1 | 10 |
| PA20260033 Mod 1 | May 18, 2026 | Residential | 1 | 11 |
| PA20260034 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260035 Mod 1 | May 18, 2026 | Residential | 2 | 8 |
| PA20260036 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260037 Mod 2 | May 18, 2026 | Residential | 1 | 34 |
| PA20260038 Mod 1 | May 18, 2026 | Residential | 7 | 11 |
| PA20260039 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260040 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260041 Mod 3 | Sep 24, 2026 | Residential | 1 | 21 |
| PA20260042 Mod 3 | Nov 12, 2026 | Residential | 1 | 9 |
| PA20260043 Mod 5 | Nov 12, 2026 | Building | 1 | 36 |
| PA20260044 Mod 3 | Nov 12, 2026 | Building | 1 | 32 |
| PA20260045 Mod 5 | Nov 12, 2026 | Building | 1 | 36 |
| PA20260046 Mod 6 | Nov 12, 2026 | Building | 1 | 44 |
| PA20260047 Mod 4 | Nov 12, 2026 | Building | 1 | 33 |
| PA20260048 Mod 5 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260049 Mod 7 | Nov 12, 2026 | Building | 1 | 50 |
| PA20260050 Mod 5 | Nov 12, 2026 | Building | 1 | 36 |
| PA20260051 Mod 6 | Nov 12, 2026 | Building | 1 | 44 |
| PA20260052 Mod 5 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260053 Mod 6 | Nov 12, 2026 | Building | 1 | 41 |
| PA20260054 Mod 5 | Nov 12, 2026 | Building | 1 | 34 |
| PA20260055 Mod 6 | Nov 12, 2026 | Building | 1 | 41 |
| PA20260056 Mod 5 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260057 Mod 3 | Nov 12, 2026 | Building | 1 | 40 |
| PA20260058 Mod 6 | Nov 12, 2026 | Building | 1 | 40 |
| PA20260059 Mod 5 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260060 Mod 4 | Nov 12, 2026 | Building | 1 | 42 |
| PA20260061 Mod 2 | Nov 12, 2026 | Building | 1 | 40 |
| PA20260062 Mod 5 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260063 Mod 4 | Nov 12, 2026 | Building | 1 | 38 |
| PA20260064 Mod 3 | Nov 12, 2026 | Building | 1 | 39 |
| PA20260065 Mod 5 | Nov 12, 2026 | Building | 1 | 34 |
| PA20260066 Mod 2 | May 18, 2026 | Building | 1 | 32 |
| PA20260067 Mod 2 | May 18, 2026 | Building | 1 | 32 |
| PA20260068 Mod 3 | Nov 12, 2026 | Building | 1 | 33 |
| PA20260069 Mod 4 | Nov 12, 2026 | Building | 1 | 40 |
| PA20260070 Mod 6 | Nov 12, 2026 | Building | 1 | 43 |
| PA20260071 Mod 6 | Nov 12, 2026 | Building | 1 | 43 |
| PA20260072 Mod 2 | May 18, 2026 | Building | 1 | 31 |
| PA20260073 Mod 3 | Nov 12, 2026 | Building | 1 | 53 |
| PA20260074 Mod 8 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260075 Mod 7 | Nov 12, 2026 | Building | 1 | 40 |
| PA20260076 Mod 3 | Nov 12, 2026 | Building | 1 | 36 |
| PA20260077 Mod 4 | Nov 12, 2026 | Building | 1 | 33 |
| PA20260078 Mod 3 | Oct 1, 2026 | Building | 1 | 38 |
| PA20260079 Mod 8 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260080 Mod 6 | Nov 12, 2026 | Building | 1 | 36 |
| PA20260081 Mod 3 | May 18, 2026 | Building | 1 | 43 |
| PA20260082 Mod 4 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260083 Mod 3 | Oct 1, 2026 | Building | 1 | 42 |
| PA20260084 Mod 3 | Nov 12, 2026 | Building | 1 | 37 |
| PA20260085 Mod 3 | Nov 12, 2026 | Building | 1 | 47 |
| PA20260086 Mod 3 | Nov 12, 2026 | Building | 1 | 43 |
| PA20260087 Mod 2 | Oct 1, 2026 | Building | 1 | 40 |
| PA20260088 Mod 8 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260089 Mod 7 | Nov 12, 2026 | Building | 1 | 37 |
| PA20260090 Mod 4 | Nov 12, 2026 | Building | 1 | 52 |
| PA20260091 Mod 3 | May 18, 2026 | Building | 1 | 37 |
| PA20260092 Mod 4 | Nov 12, 2026 | Building | 1 | 50 |
| PA20260093 Mod 4 | Nov 12, 2026 | Building | 1 | 55 |
| PA20260094 Mod 3 | May 18, 2026 | Building | 1 | 42 |
| PA20260095 Mod 4 | Nov 12, 2026 | Building | 1 | 39 |
| PA20260096 Mod 3 | Nov 12, 2026 | Building | 1 | 36 |
| PA20260097 Mod 8 | Nov 12, 2026 | Building | 1 | 34 |
| PA20260098 Mod 3 | May 18, 2026 | Building | 1 | 34 |
| PA20260099 Mod 2 | Oct 1, 2026 | Building | 1 | 41 |
| PA20260100 Mod 4 | Nov 12, 2026 | Building | 1 | 36 |
| PA20260101 Mod 3 | May 18, 2026 | Building | 1 | 39 |
| PA20260102 Mod 3 | Nov 12, 2026 | Building | 1 | 44 |
| PA20260103 Mod 3 | May 18, 2026 | Building | 1 | 34 |
| PA20260104 Mod 7 | Nov 12, 2026 | Building | 1 | 35 |
| PA20260105 Mod 8 | Nov 12, 2026 | Building | 1 | 37 |
| PA20260106 Mod 3 | May 18, 2026 | Building | 1 | 40 |
| PA20260107 Mod 3 | Nov 12, 2026 | Building | 1 | 46 |
| PA20260108 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260109 Mod 2 | Sep 24, 2026 | Residential | 1 | 13 |
| PA20260110 Mod 2 | Sep 24, 2026 | Residential | 1 | 12 |
| PA20260111 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260112 Mod 3 | Sep 24, 2026 | Residential | 1 | 8 |
| PA20260113 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260114 Mod 5 | Oct 1, 2026 | Residential | 1 | 14 |
| PA20260116 Mod 1 | May 18, 2026 | Residential | 1 | 8 |
| PA20260117 Mod 1 | May 18, 2026 | Residential | 2 | 8 |
| PA20260118 Mod 2 | Sep 24, 2026 | Residential | 2 | 14 |
| PA20260119 Mod 2 | May 18, 2026 | Residential | 2 | 8 |
| PA20260121 Mod 1 | May 18, 2026 | Residential | 2 | 8 |
| PA20260123 Mod 2 | Sep 24, 2026 | Residential | 2 | 8 |
How to use a federal rate on a Pennsylvania job
- Confirm which law governs. Federal or federally assisted money brings Davis-Bacon and the determination. State money brings the state schedule. A job with both must satisfy both.
- Take the determination from the contract. The number and modification printed there control, even if a newer determination exists.
- Split base from fringe. Overtime is 1.5× the basic hourly rate; the fringe obligation continues and is not multiplied.
- Map it onto the payroll. Field 5 takes the determination and modification, columns 6A–6C take base, plan credit and cash fringe — see the WH-347 guide.
Questions
What is the prevailing wage in Pennsylvania?
There is no single number. 110 active federal determinations cover 67 counties with 3500 rate lines; the rate depends on the classification, the county, the construction type and the determination your contract incorporates.
Are these the rates for state-funded work?
No. These are federal Davis-Bacon determinations. Pennsylvania state public works use the state agency's own schedule, which is a separate set and often higher.
Why do some counties show several determinations?
Because building, heavy, highway and residential work are published separately, and a county is usually named in more than one of them. Use the construction type that matches the work, not the one with the highest rate.
Turn this rate into a checked payroll
Pick the county and type once, and WageDecoder fills the determination number, checks the classification, the fringe credit and the overtime base, then writes the official WH-347. Free, no account, nothing uploaded.