Certified payroll for prevailing wage work
A normal payroll report says what you paid. A certified payroll has to prove the amount was legal: the right classification, the rate fixed by the determination, the fringe paid or credited, and overtime multiplied on the right number — signed, and filed on someone else's clock.
The short answer
A certified payroll for prevailing wage work is the payroll statement that proves each worker was paid at least the rate fixed by the wage determination, for the classification of work actually performed, with fringe accounted for separately and overtime calculated on the basic hourly rate — certified under penalty of perjury and filed with the awarding agency.
The gap between that and a normal payroll is six items. Everything else on the form follows from them.
Six differences from a normal payroll
| Item | Normal payroll | Prevailing wage payroll |
|---|---|---|
| Rate floor | Whatever the employer sets, above minimum wage | A rate fixed by the determination for the classification, the county and the construction type |
| Classification | Internal job title | A title the determination lists; an invented one is a rejection even at a higher rate |
| Fringe | A benefit, optional | A required component, credited by plan contributions and paid in cash where the credit falls short |
| Overtime base | Usually the regular rate | 1.5× the basic hourly rate; fringe is not multiplied but the obligation continues |
| Certification | None | A signed statement of compliance, under penalty of perjury |
| Delivery | Internal record | Filed with the awarding agency, on a statutory clock — weekly, monthly, or 30/35-day intervals depending on the state |
The practical consequence: you cannot take a payroll register built for internal accounting and paste it onto the form. The register has the hours and the gross; the form needs the determination number, the classification, the base rate, the plan credit, the cash fringe and the two gross figures — one for this project, one for all work in the week.
What a reviewer actually checks
- Does the determination number carry its modification? A number without the mod does not identify which version of the rates you applied.
- Is every classification in the determination? Compare the row titles against the table for that county and construction type — not against the company's own titles.
- Does base plus fringe reach the required package? A $30 cash rate against a $30 base plus $10 fringe is a $10 shortfall, not compliance.
- Was overtime multiplied on the basic rate only? Multiplying the package is an overpayment that hides a mis-stated fringe; multiplying a reduced rate is an underpayment.
- Do the gross figures agree? The project gross and the all-work gross are different fields for a reason: a worker who also worked elsewhere has a larger all-work figure.
The field-by-field mapping is in the WH-347 guide; the arithmetic behind the fringe columns is in fringe benefits.
Which form, and how often
Federal work uses the WH-347. State-funded work usually requires the state's own form, on the state's own clock — and seven of the nine states covered here do not accept the federal form for state projects.
| Jurisdiction | Form | Filing clock |
|---|---|---|
| Federal (Davis-Bacon) | WH-347, Rev. January 2025 | Weekly |
| California | Certified Payroll Record (DIR eCPR) | At least every 30 days |
| Illinois | Certified Transcript of Payroll | By the 15th of the following month |
| Massachusetts | Weekly CPR + Statement of Compliance | Weekly |
| New Jersey | MW-562 | Within 10 days after wages are paid |
| Oregon | WH-38 | 35-day intervals from the first day of work |
| Pennsylvania | LLC-25 | Weekly |
| Washington | Online CPR + Intent and Affidavit | At least every 30 days |
| Florida | No state form | Federal WH-347 on federal work only |
| Texas | No state form | Set by the contract |
Two clocks that are routinely misread: New Jersey counts from the date wages are paid, not the week-ending date, and Oregon counts in 35-day intervals from the first day of work. Filing "weekly because that is what everyone does" produces a late filing in both.
What gets a payroll returned
- A missing modification. The reviewer cannot verify the version, so the filing is unverifiable rather than wrong.
- A classification that is not in the determination. Common with "helper", "lead man" and company-specific titles.
- Fringe omitted, or counted twice. Either the package falls short, or the same credit appears in 6B and in the cash rate.
- The wrong overtime clock. California and Washington run on a daily eight-hour test; most other states on forty hours in a workweek.
- Late filing. A correct payroll on the wrong date is a violation on its own in several states.
Do it yourself, buy software, or outsource
All three exist because the work is repetitive, not because it is hard. A one-page form with ten workers can be filled by hand in twenty minutes — the risk is the arithmetic, not the formatting. Outsourced payroll services advertise heavily for this segment, which tells you the market is real; it does not tell you the work is worth outsourcing at a one-crew scale.
What actually reduces risk is a check that runs before you sign: does the classification exist, does base plus fringe reach the package, does the overtime use the basic rate, is the modification present. That is what this tool does — free, no account, nothing uploaded.
Questions
What is a certified payroll for prevailing wage work?
The weekly payroll statement filed on public construction work, showing each worker's classification, the required rate, the fringe paid, hours by day and gross pay, signed as a statement of compliance.
Is it the same as a normal payroll report?
No. A normal report shows what you chose to pay; a certified payroll proves the amount was at least the rate fixed for that classification, that fringe was paid or credited, and that overtime used the basic rate — and it is filed with the agency.
Do I need software to file one?
No. The WH-347 is a one-page form that can be completed and signed by hand, and most state forms are similar. Software matters when volume or frequency makes manual checking unreliable.
Why do certified payrolls get rejected?
Usually scope or arithmetic: a classification the determination does not list, a missing modification, fringe omitted or double-counted, the wrong overtime base, or a late filing.
Who signs it?
The contractor or subcontractor, or an authorized officer. The signature certifies the statement under penalty of perjury, which is why falsifying one is a criminal matter in several states.
Check the payroll before the reviewer does