Wage determination FL20260058, modification 1
Effective May 18, 2026. Covers 1 Florida county for Residential work, with 42 rate lines. Base rates run $8.05–$37.50 and fringe $0.00–$17.59 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Florida are governed by the state's own schedule, which is a separate set of rates — see Florida rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | FL20260058 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Residential |
| Counties | 1 |
| Rate lines | 42 |
| Other Florida determinations | 229 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Power Equipment Operator | $23.05 | $13.60 | $36.65 | 05/01/2024 | ENGI0673-009 |
| Power Equipment Operator | $35.41 | $13.60 | $49.01 | 05/01/2024 | ENGI0673-009 |
| Power Equipment Operator | $35.41 | $13.60 | $49.01 | 05/01/2024 | ENGI0673-009 |
| Plumber, Including HVAC Pipe Installation | $37.50 | $17.59 | $55.09 | 09/01/2025 | PLUM0234-003 |
| Sheet Metal Worker | $31.64 | $15.98 | $47.62 | 04/01/2025 | SHEE0435-001 |
| Truck Driver | $12.14 | $0.00 | $12.14 | 06/08/2009 | SUFL2009-097 |
| Truck Driver, Includes Dump Truck | $10.62 | $0.00 | $10.62 | 06/08/2009 | SUFL2009-097 |
| Tile Setter | $12.46 | $0.00 | $12.46 | 06/08/2009 | SUFL2009-097 |
| Roofer | $16.99 | $0.00 | $16.99 | 06/08/2009 | SUFL2009-097 |
| Roofer, Includes Built Up, Modified Bitumen, And Shake & Shingle Roofs | $9.68 | $0.00 | $9.68 | 06/08/2009 | SUFL2009-097 |
| Plasterer | $15.10 | $0.00 | $15.10 | 06/08/2009 | SUFL2009-097 |
| Painter | $10.68 | $0.00 | $10.68 | 06/08/2009 | SUFL2009-097 |
| Operator | $10.20 | $0.00 | $10.20 | 06/08/2009 | SUFL2009-097 |
| Operator | $15.68 | $0.00 | $15.68 | 06/08/2009 | SUFL2009-097 |
| Operator | $10.93 | $0.00 | $10.93 | 06/08/2009 | SUFL2009-097 |
| Operator | $10.59 | $0.00 | $10.59 | 06/08/2009 | SUFL2009-097 |
| Operator | $12.75 | $0.00 | $12.75 | 06/08/2009 | SUFL2009-097 |
| Operator | $15.50 | $0.00 | $15.50 | 06/08/2009 | SUFL2009-097 |
| Operator | $17.50 | $0.00 | $17.50 | 06/08/2009 | SUFL2009-097 |
| Operator | $11.41 | $0.00 | $11.41 | 06/08/2009 | SUFL2009-097 |
| Operator | $12.40 | $0.00 | $12.40 | 06/08/2009 | SUFL2009-097 |
| Operator | $12.72 | $0.00 | $12.72 | 06/08/2009 | SUFL2009-097 |
| Operator | $17.04 | $0.00 | $17.04 | 06/08/2009 | SUFL2009-097 |
| Operator | $11.63 | $0.00 | $11.63 | 06/08/2009 | SUFL2009-097 |
| Lather | $14.20 | $0.00 | $14.20 | 06/08/2009 | SUFL2009-097 |
| Laborer | $8.05 | $0.00 | $8.05 | 06/08/2009 | SUFL2009-097 |
| Laborer | $9.00 | $0.00 | $9.00 | 06/08/2009 | SUFL2009-097 |
| Laborer | $11.93 | $0.00 | $11.93 | 06/08/2009 | SUFL2009-097 |
| Laborer | $10.46 | $0.00 | $10.46 | 06/08/2009 | SUFL2009-097 |
| Laborer | $11.51 | $0.00 | $11.51 | 06/08/2009 | SUFL2009-097 |
| Laborer | $9.00 | $0.00 | $9.00 | 06/08/2009 | SUFL2009-097 |
| Laborer | $10.12 | $0.00 | $10.12 | 06/08/2009 | SUFL2009-097 |
| Ironworker, Ornamental, Reinforcing And Structural | $9.00 | $0.00 | $9.00 | 06/08/2009 | SUFL2009-097 |
| HVAC Mechanic | $13.99 | $0.00 | $13.99 | 06/08/2009 | SUFL2009-097 |
| Form Worker | $12.00 | $0.46 | $12.46 | 06/08/2009 | SUFL2009-097 |
| Floor Layer | $10.00 | $0.00 | $10.00 | 06/08/2009 | SUFL2009-097 |
| Electrician | $11.79 | $0.00 | $11.79 | 06/08/2009 | SUFL2009-097 |
| Drywall Hanger | $12.35 | $0.00 | $12.35 | 06/08/2009 | SUFL2009-097 |
| Drywall Finisher/taper | $16.13 | $0.00 | $16.13 | 06/08/2009 | SUFL2009-097 |
| Cement Mason/concrete Finisher | $12.97 | $0.00 | $12.97 | 06/08/2009 | SUFL2009-097 |
| Carpenter, Excludes Drywall Hanging, And Form Work | $14.14 | $0.00 | $14.14 | 06/08/2009 | SUFL2009-097 |
| Bricklayer | $20.00 | $0.00 | $20.00 | 06/08/2009 | SUFL2009-097 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.