Wage determination FL20260087, modification 1
Effective May 18, 2026. Covers 1 Florida county for Residential work, with 36 rate lines. Base rates run $9.00–$40.40 and fringe $0.00–$15.66 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Florida are governed by the state's own schedule, which is a separate set of rates — see Florida rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | FL20260087 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Residential |
| Counties | 1 |
| Rate lines | 36 |
| Other Florida determinations | 229 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Electrician | $40.25 | $15.20 | $55.45 | 03/01/2025 | ELEC0728-002 |
| Operator | $37.57 | $14.90 | $52.47 | 07/01/2023 | ENGI0487-023 |
| Operator | $39.38 | $14.90 | $54.28 | 07/01/2023 | ENGI0487-023 |
| Operator | $40.40 | $14.90 | $55.30 | 07/01/2023 | ENGI0487-023 |
| Operator | $37.07 | $14.90 | $51.97 | 07/01/2023 | ENGI0487-023 |
| Operator | $27.53 | $14.90 | $42.43 | 07/01/2023 | ENGI0487-024 |
| Operator | $27.00 | $14.90 | $41.90 | 07/01/2023 | ENGI0487-024 |
| Ironworker, Ornamental, Reinforcing And Structural | $28.90 | $15.66 | $44.56 | 10/01/2024 | IRON0402-002 |
| Painter | $23.84 | $14.75 | $38.59 | 08/01/2025 | PAIN0452-001 |
| Sheet Metal Worker, Excludes Metal Roof Installation | $29.10 | $14.68 | $43.78 | 08/12/2023 | SHEE0032-005 |
| Truck Driver | $12.10 | $0.00 | $12.10 | 06/08/2009 | SUFL2009-126 |
| Truck Driver, Includes Dump Truck | $10.22 | $0.00 | $10.22 | 06/08/2009 | SUFL2009-126 |
| Roofer | $16.99 | $0.00 | $16.99 | 06/08/2009 | SUFL2009-126 |
| Roofer, Includes Built Up, Modified Bitumen, And Shake & Shingle Roofs | $14.50 | $0.00 | $14.50 | 06/08/2009 | SUFL2009-126 |
| Plumber | $25.00 | $1.17 | $26.17 | 06/08/2009 | SUFL2009-126 |
| Operator | $10.20 | $0.00 | $10.20 | 06/08/2009 | SUFL2009-126 |
| Operator | $15.68 | $0.00 | $15.68 | 06/08/2009 | SUFL2009-126 |
| Operator | $10.93 | $0.00 | $10.93 | 06/08/2009 | SUFL2009-126 |
| Operator | $10.58 | $0.00 | $10.58 | 06/08/2009 | SUFL2009-126 |
| Operator | $16.48 | $0.00 | $16.48 | 06/08/2009 | SUFL2009-126 |
| Operator | $15.50 | $0.00 | $15.50 | 06/08/2009 | SUFL2009-126 |
| Operator | $17.50 | $0.00 | $17.50 | 06/08/2009 | SUFL2009-126 |
| Operator | $13.50 | $0.00 | $13.50 | 06/08/2009 | SUFL2009-126 |
| Operator | $11.41 | $0.00 | $11.41 | 06/08/2009 | SUFL2009-126 |
| Operator | $13.67 | $0.00 | $13.67 | 06/08/2009 | SUFL2009-126 |
| Operator | $17.04 | $0.00 | $17.04 | 06/08/2009 | SUFL2009-126 |
| Operator | $11.63 | $0.00 | $11.63 | 06/08/2009 | SUFL2009-126 |
| Laborer | $9.15 | $0.00 | $9.15 | 06/08/2009 | SUFL2009-126 |
| Laborer | $9.00 | $0.00 | $9.00 | 06/08/2009 | SUFL2009-126 |
| Laborer | $11.79 | $0.00 | $11.79 | 06/08/2009 | SUFL2009-126 |
| Laborer | $10.46 | $0.00 | $10.46 | 06/08/2009 | SUFL2009-126 |
| Laborer | $11.51 | $0.00 | $11.51 | 06/08/2009 | SUFL2009-126 |
| Laborer | $9.65 | $0.00 | $9.65 | 06/08/2009 | SUFL2009-126 |
| Cement Mason/concrete Finisher | $16.19 | $0.00 | $16.19 | 06/08/2009 | SUFL2009-126 |
| Carpenter | $14.89 | $0.00 | $14.89 | 06/08/2009 | SUFL2009-126 |
| Bricklayer | $20.00 | $0.00 | $20.00 | 06/08/2009 | SUFL2009-126 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.