Wage determination FL20260103, modification 1
Effective May 18, 2026. Covers 1 Florida county for Heavy work, with 27 rate lines. Base rates run $7.25–$37.01 and fringe $0.00–$16.85 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Florida are governed by the state's own schedule, which is a separate set of rates — see Florida rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | FL20260103 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 1 |
| Rate lines | 27 |
| Other Florida determinations | 229 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Electrician | $33.50 | $13.85 | $47.35 | 06/01/2025 | ELEC1205-004 |
| Power Equipment Operator | $37.01 | $16.85 | $53.86 | 06/01/2023 | ENGI0487-033 |
| Ironworker, Structural | $29.50 | $12.98 | $42.48 | 04/01/2024 | IRON0597-005 |
| Laborer | $22.61 | $11.59 | $34.20 | 05/01/2023 | LABO0517-002 |
| Painter | $20.21 | $12.38 | $32.59 | 06/01/2021 | PAIN0088-007 |
| Truck Driver | $12.21 | $1.97 | $14.18 | 06/24/2009 | SUFL2009-142 |
| Truck Driver | $13.06 | $2.18 | $15.24 | 06/24/2009 | SUFL2009-142 |
| Truck Driver, Includes Dump Truck | $14.63 | $0.00 | $14.63 | 06/24/2009 | SUFL2009-142 |
| Painter | $11.94 | $0.00 | $11.94 | 06/24/2009 | SUFL2009-142 |
| Operator | $10.54 | $0.00 | $10.54 | 06/24/2009 | SUFL2009-142 |
| Operator | $20.92 | $5.50 | $26.42 | 06/24/2009 | SUFL2009-142 |
| Operator | $11.00 | $1.74 | $12.74 | 06/24/2009 | SUFL2009-142 |
| Operator | $10.03 | $0.00 | $10.03 | 06/24/2009 | SUFL2009-142 |
| Operator | $14.32 | $0.00 | $14.32 | 06/24/2009 | SUFL2009-142 |
| Operator | $11.31 | $2.02 | $13.33 | 06/24/2009 | SUFL2009-142 |
| Operator | $16.00 | $2.84 | $18.84 | 06/24/2009 | SUFL2009-142 |
| Operator | $21.30 | $0.00 | $21.30 | 06/24/2009 | SUFL2009-142 |
| Operator | $13.40 | $1.19 | $14.59 | 06/24/2009 | SUFL2009-142 |
| Operator | $14.10 | $1.34 | $15.44 | 06/24/2009 | SUFL2009-142 |
| Operator | $16.10 | $2.44 | $18.54 | 06/24/2009 | SUFL2009-142 |
| Operator | $11.59 | $0.00 | $11.59 | 06/24/2009 | SUFL2009-142 |
| Laborer | $10.63 | $2.20 | $12.83 | 06/24/2009 | SUFL2009-142 |
| Laborer | $11.51 | $1.16 | $12.67 | 06/24/2009 | SUFL2009-142 |
| Laborer | $7.25 | $0.00 | $7.25 | 06/24/2009 | SUFL2009-142 |
| Laborer | $9.85 | $1.53 | $11.38 | 06/24/2009 | SUFL2009-142 |
| Cement Mason/concrete Finisher | $13.23 | $2.15 | $15.38 | 06/24/2009 | SUFL2009-142 |
| Carpenter | $15.80 | $0.00 | $15.80 | 06/24/2009 | SUFL2009-142 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.