Wage determination FL20260129, modification 1
Effective May 18, 2026. Covers 1 Florida county for Heavy work, with 27 rate lines. Base rates run $7.25–$37.01 and fringe $0.00–$16.85 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Florida are governed by the state's own schedule, which is a separate set of rates — see Florida rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | FL20260129 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 1 |
| Rate lines | 27 |
| Other Florida determinations | 229 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Power Equipment Operator | $37.01 | $16.85 | $53.86 | 06/01/2023 | ENGI0487-033 |
| Ironworker | $31.50 | $16.45 | $47.95 | 01/01/2024 | IRON0808-008 |
| Laborer | $22.61 | $11.59 | $34.20 | 05/01/2023 | LABO0517-002 |
| Painter - Brush, Roller & Spray | $25.86 | $14.73 | $40.59 | 08/01/2025 | PAIN1010-011 |
| Truck Driver | $12.21 | $1.97 | $14.18 | 06/24/2009 | SUFL2009-168 |
| Truck Driver | $11.00 | $0.00 | $11.00 | 06/24/2009 | SUFL2009-168 |
| Truck Driver | $14.12 | $0.00 | $14.12 | 06/24/2009 | SUFL2009-168 |
| Truck Driver, Includes Dump Truck | $11.22 | $1.70 | $12.92 | 06/24/2009 | SUFL2009-168 |
| Operator | $10.00 | $0.00 | $10.00 | 06/24/2009 | SUFL2009-168 |
| Operator | $20.92 | $5.50 | $26.42 | 06/24/2009 | SUFL2009-168 |
| Operator | $11.00 | $1.74 | $12.74 | 06/24/2009 | SUFL2009-168 |
| Operator | $10.67 | $1.87 | $12.54 | 06/24/2009 | SUFL2009-168 |
| Operator | $13.83 | $2.19 | $16.02 | 06/24/2009 | SUFL2009-168 |
| Operator | $13.00 | $1.84 | $14.84 | 06/24/2009 | SUFL2009-168 |
| Operator | $16.00 | $2.84 | $18.84 | 06/24/2009 | SUFL2009-168 |
| Operator | $16.17 | $3.89 | $20.06 | 06/24/2009 | SUFL2009-168 |
| Operator | $12.88 | $2.92 | $15.80 | 06/24/2009 | SUFL2009-168 |
| Operator | $13.21 | $2.88 | $16.09 | 06/24/2009 | SUFL2009-168 |
| Operator | $16.10 | $2.44 | $18.54 | 06/24/2009 | SUFL2009-168 |
| Operator | $11.88 | $0.00 | $11.88 | 06/24/2009 | SUFL2009-168 |
| Laborer | $10.63 | $2.20 | $12.83 | 06/24/2009 | SUFL2009-168 |
| Laborer | $12.39 | $1.97 | $14.36 | 06/24/2009 | SUFL2009-168 |
| Laborer | $7.25 | $0.00 | $7.25 | 06/24/2009 | SUFL2009-168 |
| Laborer | $9.59 | $1.72 | $11.31 | 06/24/2009 | SUFL2009-168 |
| Electrician | $16.71 | $3.51 | $20.22 | 06/24/2009 | SUFL2009-168 |
| Cement Mason/concrete Finisher | $13.44 | $0.00 | $13.44 | 06/24/2009 | SUFL2009-168 |
| Carpenter, Includes Form Work | $13.37 | $1.78 | $15.15 | 06/24/2009 | SUFL2009-168 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.