Wage determination FL20260137, modification 1
Effective May 18, 2026. Covers 1 Florida county for Heavy work, with 27 rate lines. Base rates run $8.44–$31.50 and fringe $0.00–$16.45 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Florida are governed by the state's own schedule, which is a separate set of rates — see Florida rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | FL20260137 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 1 |
| Rate lines | 27 |
| Other Florida determinations | 229 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Operator | $24.50 | $15.10 | $39.60 | 05/01/2024 | ENGI0673-013 |
| Ironworker, Structural | $31.50 | $16.45 | $47.95 | 01/01/2024 | IRON0808-003 |
| Laborer | $22.61 | $11.59 | $34.20 | 05/01/2023 | LABO0517-002 |
| Painter - Brush, Roller & Spray | $25.86 | $14.73 | $40.59 | 08/01/2025 | PAIN1010-011 |
| Truck Driver | $12.21 | $1.97 | $14.18 | 06/24/2009 | SUFL2009-176 |
| Truck Driver | $11.00 | $0.00 | $11.00 | 06/24/2009 | SUFL2009-176 |
| Truck Driver, Includes Dump Truck | $11.07 | $0.00 | $11.07 | 06/24/2009 | SUFL2009-176 |
| Operator | $10.00 | $0.00 | $10.00 | 06/24/2009 | SUFL2009-176 |
| Operator | $20.92 | $5.50 | $26.42 | 06/24/2009 | SUFL2009-176 |
| Operator | $11.00 | $1.74 | $12.74 | 06/24/2009 | SUFL2009-176 |
| Operator | $10.50 | $0.00 | $10.50 | 06/24/2009 | SUFL2009-176 |
| Operator | $13.83 | $2.19 | $16.02 | 06/24/2009 | SUFL2009-176 |
| Operator | $13.38 | $0.00 | $13.38 | 06/24/2009 | SUFL2009-176 |
| Operator | $16.00 | $2.84 | $18.84 | 06/24/2009 | SUFL2009-176 |
| Operator | $14.88 | $3.17 | $18.05 | 06/24/2009 | SUFL2009-176 |
| Operator | $12.88 | $0.00 | $12.88 | 06/24/2009 | SUFL2009-176 |
| Operator | $13.12 | $2.58 | $15.70 | 06/24/2009 | SUFL2009-176 |
| Operator | $16.10 | $2.44 | $18.54 | 06/24/2009 | SUFL2009-176 |
| Operator | $11.88 | $0.00 | $11.88 | 06/24/2009 | SUFL2009-176 |
| Laborer | $10.63 | $2.20 | $12.83 | 06/24/2009 | SUFL2009-176 |
| Laborer | $11.17 | $1.27 | $12.44 | 06/24/2009 | SUFL2009-176 |
| Laborer | $8.44 | $0.00 | $8.44 | 06/24/2009 | SUFL2009-176 |
| Laborer | $9.03 | $0.81 | $9.84 | 06/24/2009 | SUFL2009-176 |
| Form Worker | $11.36 | $0.00 | $11.36 | 06/24/2009 | SUFL2009-176 |
| Electrician | $16.71 | $3.51 | $20.22 | 06/24/2009 | SUFL2009-176 |
| Cement Mason/concrete Finisher | $12.63 | $0.00 | $12.63 | 06/24/2009 | SUFL2009-176 |
| Carpenter, Excludes Form Work | $13.56 | $1.84 | $15.40 | 06/24/2009 | SUFL2009-176 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.