Wage determination NJ20260032, modification 1
Effective May 18, 2026. Covers 1 New Jersey county for Building work, with 42 rate lines. Base rates run $28.37–$71.85 and fringe $0.00–$50.76 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New Jersey are governed by the state's own schedule, which is a separate set of rates — see New Jersey rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NJ20260032 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Building |
| Counties | 1 |
| Rate lines | 42 |
| Other New Jersey determinations | 65 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Asbestos Worker/heat & Frost Insulator | $60.84 | $48.38 | $109.22 | 05/01/2025 | ASBE0014-004 |
| Work On High Stacks | $45.20 | $33.26 | $78.46 | 05/01/2021 | BRNJ0002-013 |
| Marble Setter | $64.66 | $40.97 | $105.63 | 07/07/2025 | BRNJ0007-012 |
| Terrazzo Worker/setter | $61.77 | $42.82 | $104.59 | 07/01/2025 | BRNJ0007-014 |
| Tile Setter | $52.31 | $38.01 | $90.32 | 06/02/2025 | BRNJ0007-017 |
| Tile Finisher Work Grouting All Epoxy per day | $43.63 | $32.12 | $75.75 | 06/02/2025 | BRNJ0007-017 |
| Carpenter | $57.42 | $34.17 | $91.59 | 05/01/2025 | CARP0006-009 |
| Carpenter | $57.42 | $34.17 | $91.59 | 05/01/2025 | CARP0006-010 |
| Soft Floor Layer | $57.42 | $34.17 | $91.59 | 05/01/2025 | CARP0029-006 |
| Paid New Year's Day, Washington's Birthday, Memorial Day,… | $46.73 | $41.69 | $88.42 | 05/01/2023 | CARP0454-009 |
| Work Of Erection And Dismantling Of Elevators And Towers, Such As… | $58.84 | $35.06 | $93.90 | 05/01/2025 | CARP0715-007 |
| Electrician | $55.05 | $48.76 | $103.81 | 09/30/2024 | ELEC0351-007 |
| Electrician | $46.51 | $34.39 | $80.90 | 09/30/2024 | ELEC0351-007 |
| Elevator | $71.85 | $38.44 | $110.29 | 01/01/2025 | ELEV0005-004 |
| Power Equipment Operators | $52.88 | $37.50 | $90.38 | 07/01/2025 | ENGI0825-020 |
| Power Equipment Operators | $56.59 | $37.50 | $94.09 | 07/01/2025 | ENGI0825-020 |
| Power Equipment Operators | $58.22 | $37.50 | $95.72 | 07/01/2025 | ENGI0825-020 |
| Power Equipment Operators | $60.13 | $37.50 | $97.63 | 07/01/2025 | ENGI0825-020 |
| Power Equipment Operators | $61.72 | $37.50 | $99.22 | 07/01/2025 | ENGI0825-020 |
| Ironworker | $54.24 | $40.40 | $94.64 | 07/01/2025 | IRON0399-007 |
| Ironworker | $53.24 | $40.40 | $93.64 | 07/01/2025 | IRON0399-007 |
| Asbestos Removal Laborer The Removal, Abatement, Enclosure And… | $28.37 | $21.62 | $49.99 | 05/01/2011 | LABO0008-001 |
| Laborer | $36.50 | $30.22 | $66.72 | 05/01/2022 | LABO0077-002 |
| Laborer | $35.75 | $30.22 | $65.97 | 05/01/2022 | LABO0077-005 |
| Work At 30 Ft. Above The Working Surface, Or On The Swing Stage | $49.96 | $35.11 | $85.07 | 05/01/2025 | PAIN0021-035 |
| Drywall Finisher/taper | $44.87 | $30.15 | $75.02 | 05/01/2025 | PAIN0711-018 |
| Painter | $45.55 | $29.86 | $75.41 | 05/01/2025 | PAIN0711-019 |
| Painter | $45.55 | $29.86 | $75.41 | 05/01/2025 | PAIN0711-019 |
| Cement Mason/concrete Finisher | $49.57 | $37.06 | $86.63 | 05/01/2025 | PLAS0592-035 |
| Plumber | $56.30 | $50.76 | $107.06 | 05/01/2025 | PLUM0322-009 |
| Pipefitter | $56.30 | $50.76 | $107.06 | 05/01/2025 | PLUM0322-009 |
| Roofer | $35.95 | $21.85 | $57.80 | 05/01/2025 | ROOF0030-027 |
| Roofer | $38.95 | $21.85 | $60.80 | 05/01/2025 | ROOF0030-027 |
| Roofer | $46.03 | $34.27 | $80.30 | 05/01/2025 | ROOF0030-027 |
| Sprinkler Fitter | $60.83 | $30.34 | $91.17 | 05/01/2021 | SFNJ0692-003 |
| Sheet Metal Worker | $62.62 | $50.66 | $113.28 | 05/01/2025 | SHEE0019-018 |
| Sheet Metal Worker | $35.13 | $24.76 | $59.89 | 05/01/2025 | SHEE0019-018 |
| Sheet Metal Worker | $62.62 | $50.66 | $113.28 | 07/15/2025 | SHEE0019-018 |
| Sheet Metal Worker | $35.13 | $24.76 | $59.89 | 07/15/2025 | SHEE0019-018 |
| Plasterer | $42.33 | $0.00 | $42.33 | 01/02/2009 | SUNJ2004-008 |
| Truck Driver | $44.65 | $34.11 | $78.76 | 05/01/2025 | TEAM0676-003 |
| Truck Driver | $44.30 | $34.11 | $78.41 | 05/01/2025 | TEAM0676-003 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.