Prevailing wage rates in New Jersey
Every active federal Davis-Bacon determination that covers New Jersey: 65 determinations, 21 counties, 1882 rate lines, newest effective Oct 1, 2026. Pick your county below, or read the rate ranges by trade.
What this page covers
State-funded work is separate. New Jersey public works are governed by New Jersey Prevailing Wage Act, N.J.S.A. 34:11-56.25 et seq. and administered by Department of Labor & Workforce Development, Division of Wage & Hour Compliance, covering contracts above $2,000. The state form is the Payroll Certification for Public Works Projects. A federal determination does not replace the state rate, and on a project covered by both laws you must satisfy both — usually the higher rate plus each law's paperwork.
State rules, the filing clock and the penalty: New Jersey certified payroll.
Counties covered
Each row is a New Jersey county that appears in an active federal determination. The count is the number of determinations naming that county — usually one per construction type.
| County | Determinations | Construction types | Newest effective | Look up |
|---|---|---|---|---|
| Atlantic | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Bergen | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Burlington | 4 | Highway, Residential, Building, Heavy | Oct 1, 2026 | Rates → |
| Camden | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Cape May | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Cumberland | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Essex | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Gloucester | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Hudson | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Hunterdon | 4 | Highway, Residential, Building, Heavy | Aug 13, 2026 | Rates → |
| Mercer | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Middlesex | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Monmouth | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Morris | 4 | Highway, Residential, Building, Heavy | Aug 13, 2026 | Rates → |
| Ocean | 5 | Highway, Heavy, Residential, Building | May 18, 2026 | Rates → |
| Passaic | 4 | Highway, Residential, Building, Heavy | Aug 13, 2026 | Rates → |
| Salem | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Somerset | 4 | Highway, Residential, Building, Heavy | Aug 13, 2026 | Rates → |
| Sussex | 4 | Highway, Residential, Building, Heavy | Aug 13, 2026 | Rates → |
| Union | 5 | Highway, Heavy, Residential, Building | Aug 13, 2026 | Rates → |
| Warren | 4 | Highway, Residential, Building, Heavy | Aug 13, 2026 | Rates → |
Rates by trade and construction type
These are the ranges across every New Jersey county in the current determinations. A range means the same classification carries different rates in different counties, or the determination lists regional sub-rates — the exact figure for a job comes from the determination that names that county.
| Classification | Type | Basic hourly rate | Fringe | Rate lines |
|---|---|---|---|---|
| Asbestos Removal Laborer The Removal, Abatement, Enclosure… | Building | $28.37 | $21.62 | 11 |
| Asbestos Removal The Removal, Abatement, Enclosure And… | Building | $28.37 | $21.62 | 3 |
| Asbestos Worker/ Heat & Frost Insulator | Building | $51.74 | $46.20 | 1 |
| Asbestos Worker/heat & Frost Insulator | Building | $47.34 – $60.84 | $30.99 – $48.38 | 25 |
| Asbestos Worker/heat & Frost Insulator | Heavy | $47.34 – $60.84 | $30.99 – $48.38 | 8 |
| Asbestos Worker/heat & | Building | $51.74 | $46.20 | 1 |
| Bricklayer | Building | $45.20 – $49.60 | $33.26 – $37.96 | 9 |
| Bricklayer | Heavy | $49.60 | $37.96 | 1 |
| Bricklayer | Highway | $43.56 – $49.60 | $32.50 – $37.96 | 3 |
| Bricklayer | Residential | $49.60 | $37.96 | 20 |
| Bricklayer Work 100 Degrees F. And Over | Highway | $57.70 | $45.92 | 1 |
| Bricklayer Work On High Stacks | Building | $43.56 – $45.20 | $32.50 – $33.26 | 10 |
| Bricklayer Work On High Stacks | Heavy | $49.60 | $37.96 | 1 |
| Carpenter | Building | $57.42 | $34.17 | 39 |
| Carpenter | Heavy | $52.02 – $57.42 | $34.02 – $52.44 | 39 |
| Carpenter | Highway | $57.42 | $34.02 | 2 |
| Carpenter | Residential | $15.60 – $48.27 | $2.46 – $22.78 | 19 |
| Carpenter Dock Builder | Heavy | $52.02 – $52.98 | $39.23 – $52.44 | 4 |
| Carpenter The First Sixty Feet At The Regular Rate, 10% Per… | Heavy | $57.42 | $34.17 | 1 |
| Carpenter, Includes Drywall Hanging | Residential | $48.27 | $11.38 | 1 |
| Carpenter, Includes Drywall Hanging, And Form Work | Residential | $37.19 | $22.18 | 4 |
| Carpenter, Including Acoustical Ceiling Installation,… | Building | $57.42 | $34.17 | 2 |
| Cement Mason | Building | $49.60 | $37.96 | 8 |
| Cement Mason | Heavy | $49.60 | $37.96 | 14 |
| Cement Mason | Highway | $43.56 – $54.64 | $30.95 – $37.96 | 6 |
| Cement Mason | Residential | $45.20 – $49.60 | $33.26 – $37.96 | 15 |
| Cement Mason/concrete Finisher | Building | $49.57 – $54.64 | $30.95 – $37.06 | 13 |
| Cement Mason/concrete Finisher | Heavy | $49.57 – $53.21 | $33.42 – $37.06 | 7 |
| Cement Mason/concrete Finisher | Residential | $25.00 – $54.64 | $0.00 – $30.95 | 4 |
| Dock Builder & Piledrivermen | Highway | $52.98 | $52.44 | 1 |
| Dock Builder & Piledrivermen Work On Land Pile Driving,… | Highway | $52.98 | $52.44 | 1 |
| Dredging | Heavy | $30.86 – $48.48 | $14.15 – $15.34 | 7 |
| Drywall Finisher/taper | Building | $44.87 | $30.15 | 21 |
| Drywall Finisher/taper | Residential | $43.41 | $29.86 | 3 |
| Electrcian | Building | $62.90 | $39.31 | 1 |
| Electrician | Building | $41.00 – $73.59 | $32.75 – $48.76 | 40 |
| Electrician | Heavy | $46.51 – $73.59 | $33.46 – $46.56 | 32 |
| Electrician | Highway | $37.35 – $65.35 | $27.17 – $46.56 | 4 |
| Electrician | Residential | $13.63 – $65.43 | $5.52 – $48.76 | 18 |
| Electrician & Cable Splicer | Building | $57.70 | $45.92 | 2 |
| Electrician & Cable Splicer | Heavy | $57.70 | $45.92 | 1 |
| Electrician And Cable Splicer | Building | $55.05 – $63.82 | $41.99 – $48.76 | 6 |
| Electrician And Cable Splicer | Heavy | $55.05 – $57.70 | $45.92 – $48.76 | 8 |
| Electrician Burlington County | Heavy | $61.84 | $40.32 | 1 |
| Electrician Hunterdon County | Highway | $63.82 | $41.99 | 1 |
| Electrician Work Forty Ft. Or More Above The Ground Or… | Heavy | $65.43 | $42.86 | 1 |
| Electrician Work On Line Voltage Of 440 Or 480 Volts | Heavy | $62.90 | $39.31 | 1 |
| Electrician, Including Low Voltage Wiring | Building | $61.40 – $69.72 | $39.14 – $46.56 | 4 |
| Electricians | Highway | $45.20 – $59.29 | $33.26 – $48.76 | 3 |
| Electricians | Residential | $13.25 – $65.43 | $5.52 – $42.86 | 15 |
| Elevator | Building | $61.41 – $71.85 | $38.44 | 7 |
| Elevator Mechanic | Building | $40.21 – $71.85 | $11.22 – $38.44 | 16 |
| Elevator Mechanic Work On The Addition, Replacement,… | Building | $45.14 | $27.45 – $27.46 | 2 |
| Glazier | Building | $30.82 – $52.68 | $15.60 – $35.11 | 11 |
| Glazier Work At 30 Ft. Above The Working Surface, Or On A… | Building | $49.96 | $35.11 | 2 |
| Glazier Work Welding Or Using A Cutting Torch | Building | $52.68 | $31.29 | 6 |
| Ironworker | Building | $48.44 – $54.24 | $38.40 – $50.32 | 48 |
| Ironworker | Heavy | $48.44 – $54.24 | $38.40 – $50.32 | 46 |
| Ironworker | Highway | $54.24 | $38.40 – $40.40 | 2 |
| Ironworker | Residential | $49.94 – $54.24 | $38.40 – $50.32 | 36 |
| Ironworkers | Building | $49.94 – $52.24 | $50.32 | 2 |
| Ironworkers | Heavy | $49.94 – $52.24 | $50.32 | 4 |
| Ironworkers | Highway | $34.05 – $54.24 | $24.00 – $50.32 | 6 |
| Ironworkers | Residential | $49.94 – $54.24 | $40.40 – $50.32 | 8 |
| Laborer | Building | $19.27 – $38.85 | $0.00 – $30.22 | 54 |
| Laborer | Heavy | $23.75 – $51.65 | $8.46 – $38.53 | 65 |
| Laborer | Highway | $50.95 – $55.45 | $38.53 | 4 |
| Laborer | Residential | $12.33 – $29.35 | $0.00 – $23.07 | 32 |
| Laborers | Heavy | $50.95 – $51.65 | $38.53 | 6 |
| Laborers | Highway | $50.95 – $55.45 | $38.53 | 12 |
| Line Construction | Highway | $30.88 – $71.97 | $18.80 – $49.77 | 44 |
| Marble Setter | Building | $64.66 | $40.97 | 10 |
| Mason - Stone | Building | $49.60 | $37.96 | 4 |
| Mason - Work On High Stacks | Building | $49.60 | $37.96 | 4 |
| Mason Tender | Residential | $29.35 | $23.07 | 1 |
| Millwright | Building | $58.84 | $35.06 | 8 |
| Millwright | Heavy | $58.84 | $35.06 | 12 |
| Millwright Work Of Erection And Dismantling Of Elevators And… | Building | $58.84 | $35.06 | 6 |
| Millwright Work Of Erection And Dismantling Of Elevators And… | Heavy | $58.84 | $35.06 | 6 |
| Millwright. Work Of Erection And Dismantling Of Elevators… | Heavy | $58.84 | $35.06 | 2 |
| Millwright. Work Of Erection And Dismantling Of Elevators… | Heavy | $58.84 | $35.06 | 1 |
| Operator | Heavy | $31.28 | $20.79 | 3 |
| Operator | Residential | $13.50 | $2.34 | 20 |
| Painter | Building | $32.91 – $45.55 | $5.77 – $29.86 | 44 |
| Painter | Heavy | $29.05 – $58.28 | $18.91 – $33.85 | 42 |
| Painter | Residential | $20.53 – $33.85 | $0.00 – $15.62 | 19 |
| Painters | Heavy | $29.05 – $58.28 | $18.91 – $33.85 | 21 |
| Painters | Highway | $45.55 – $59.29 | $29.86 – $40.40 | 6 |
| Piledriver | Highway | $46.73 | $41.69 | 1 |
| Piledriverman | Building | $46.73 | $41.69 | 3 |
| Piledriverman | Heavy | $46.73 | $41.69 | 9 |
| Pipefitter | Building | $46.23 – $59.57 | $29.23 – $50.80 | 31 |
| Pipefitter | Heavy | $46.23 – $59.57 | $29.23 – $50.80 | 29 |
| Pipefitter | Residential | $56.34 – $56.37 | $50.80 | 3 |
| Pipefitter, Includes HVAC Pipe Installation | Building | $59.57 | $46.45 | 1 |
| Pipefitter, Including HVAC Pipe Installation | Building | $56.34 – $59.57 | $46.45 – $50.80 | 2 |
| Plasterer | Building | $38.37 – $54.64 | $0.00 – $31.64 | 21 |
| Plumber | Building | $46.23 – $62.09 | $29.23 – $50.76 | 28 |
| Plumber | Heavy | $46.23 – $62.09 | $29.23 – $46.45 | 8 |
| Plumber | Residential | $31.50 – $62.09 | $13.41 – $45.05 | 15 |
| Plumber, Excludes HVAC Pipe Installation | Building | $62.09 | $45.05 | 1 |
| Plumber, Excluding HVAC Pipe Installation | Building | $59.57 – $62.09 | $45.05 – $46.45 | 3 |
| Plumber/pipefitter | Building | $46.23 | $29.23 | 2 |
| Plumber/pipefitter | Heavy | $46.23 – $59.57 | $29.23 – $46.45 | 4 |
| Plumber/pipefitter | Residential | $31.50 – $34.25 | $13.41 – $21.31 | 8 |
| Power Equipment Operator | Building | $52.88 – $61.72 | $37.50 | 30 |
| Power Equipment Operator | Heavy | $52.88 – $61.72 | $37.50 | 70 |
| Power Equipment Operators | Building | $52.88 – $70.24 | $37.50 | 77 |
| Power Equipment Operators | Heavy | $52.88 – $61.72 | $37.50 | 35 |
| Power Equipment Operators | Highway | $52.88 – $70.24 | $37.50 | 26 |
| Power Equipment Operators | Residential | $56.59 – $61.72 | $37.50 | 80 |
| Roofer | Building | $35.95 – $50.25 | $21.85 – $39.62 | 48 |
| Roofer | Residential | $34.35 – $50.25 | $21.75 – $35.25 | 25 |
| Roofer, All Other Work | Building | $46.03 | $34.27 | 1 |
| Roofer, Excludes Shake & Shingle, And Tile Roofs | Building | $30.21 | $15.25 | 1 |
| Roofer, Shingles | Building | $35.95 | $21.85 | 1 |
| Roofer, Slate And Tile | Building | $38.95 | $21.85 | 1 |
| Sheet Metal Worker | Building | $35.13 – $62.62 | $0.00 – $51.55 | 26 |
| Soft Floor Layer | Building | $57.42 | $34.17 | 15 |
| Sprinkler Fitter | Building | $49.97 – $69.97 | $30.34 – $41.35 | 28 |
| Terrazzo Finisher | Building | $43.63 | $32.12 | 3 |
| Terrazzo Worker/setter | Building | $61.77 | $42.82 | 4 |
| Tile Finisher day | Building | $50.05 | $33.90 | 6 |
| Tile Finisher Work Grouting All Epoxy day | Building | $43.63 – $50.05 | $32.12 – $33.90 | 7 |
| Tile Setter | Building | $52.31 – $64.90 | $37.28 – $38.01 | 24 |
| Tile Work Grouting All Epoxy day | Building | $43.63 – $50.05 | $32.12 – $33.90 | 5 |
| Truck Driver | Building | $44.30 – $48.78 | $25.98 – $44.02 | 46 |
| Truck Driver | Heavy | $44.30 – $48.78 | $25.93 – $44.02 | 35 |
| Truck Driver Off The Road Truck, Flatbed Truck, Pickup… | Heavy | $46.51 | $31.82 | 1 |
| Truck Drivers | Heavy | $44.30 – $48.78 | $34.11 – $42.66 | 10 |
| Truck Drivers | Highway | $44.30 – $48.88 | $25.98 – $44.17 | 24 |
| Work At 30 Ft. Above The Working Surface, Or On The Swing Stage | Building | $49.96 | $35.11 | 2 |
| Work Of Erection And Dismantling Of Elevators And Towers,… | Building | $58.84 | $35.06 | 5 |
| Work On High Stacks | Building | $45.20 | $33.26 | 2 |
| Work On High Stacks | Heavy | $49.60 | $37.96 | 1 |
The determinations
Read the scope before the table: a determination covers the counties and construction types listed here, and the contract that incorporates it fixes its version.
| Determination | Newest effective | Types | Counties | Rate lines |
|---|---|---|---|---|
| NJ20260001 Mod 2 | May 18, 2026 | Highway | 10 | 65 |
| NJ20260002 Mod 2 | May 18, 2026 | Highway | 11 | 82 |
| NJ20260003 Mod 2 | May 18, 2026 | Heavy | 14 | 7 |
| NJ20260005 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260006 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260007 Mod 3 | Oct 1, 2026 | Residential | 1 | 17 |
| NJ20260008 Mod 1 | May 18, 2026 | Residential | 1 | 18 |
| NJ20260009 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260010 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260011 Mod 1 | May 18, 2026 | Residential | 1 | 15 |
| NJ20260012 Mod 1 | May 18, 2026 | Residential | 1 | 10 |
| NJ20260013 Mod 1 | May 18, 2026 | Residential | 1 | 18 |
| NJ20260014 Mod 1 | May 18, 2026 | Residential | 1 | 19 |
| NJ20260015 Mod 1 | May 18, 2026 | Residential | 1 | 18 |
| NJ20260016 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260017 Mod 1 | May 18, 2026 | Residential | 1 | 20 |
| NJ20260018 Mod 1 | May 18, 2026 | Residential | 1 | 18 |
| NJ20260019 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260020 Mod 1 | May 18, 2026 | Residential | 1 | 24 |
| NJ20260021 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260022 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260023 Mod 1 | May 18, 2026 | Residential | 1 | 16 |
| NJ20260024 Mod 2 | May 18, 2026 | Residential | 2 | 25 |
| NJ20260025 Mod 1 | May 18, 2026 | Building | 1 | 42 |
| NJ20260026 Mod 1 | May 18, 2026 | Building | 1 | 37 |
| NJ20260027 Mod 2 | May 18, 2026 | Building | 1 | 50 |
| NJ20260028 Mod 1 | May 18, 2026 | Building | 1 | 42 |
| NJ20260029 Mod 1 | May 18, 2026 | Building | 1 | 39 |
| NJ20260030 Mod 1 | May 18, 2026 | Building | 1 | 40 |
| NJ20260031 Mod 1 | May 18, 2026 | Building | 1 | 37 |
| NJ20260032 Mod 1 | May 18, 2026 | Building | 1 | 42 |
| NJ20260033 Mod 1 | May 18, 2026 | Building | 1 | 38 |
| NJ20260034 Mod 2 | May 18, 2026 | Building | 1 | 43 |
| NJ20260035 Mod 2 | May 18, 2026 | Building | 1 | 43 |
| NJ20260036 Mod 1 | May 18, 2026 | Building | 1 | 48 |
| NJ20260037 Mod 1 | May 18, 2026 | Building | 1 | 38 |
| NJ20260038 Mod 1 | May 18, 2026 | Building | 1 | 39 |
| NJ20260039 Mod 1 | May 18, 2026 | Building | 1 | 39 |
| NJ20260040 Mod 2 | Aug 13, 2026 | Building | 1 | 37 |
| NJ20260041 Mod 2 | Aug 13, 2026 | Building | 1 | 41 |
| NJ20260042 Mod 2 | Aug 13, 2026 | Building | 1 | 48 |
| NJ20260043 Mod 2 | Aug 13, 2026 | Building | 1 | 36 |
| NJ20260044 Mod 2 | Aug 13, 2026 | Building | 1 | 37 |
| NJ20260045 Mod 2 | Aug 13, 2026 | Building | 1 | 37 |
| NJ20260046 Mod 2 | Aug 13, 2026 | Heavy | 1 | 24 |
| NJ20260047 Mod 2 | Aug 13, 2026 | Heavy | 1 | 24 |
| NJ20260048 Mod 3 | Aug 13, 2026 | Heavy | 1 | 31 |
| NJ20260049 Mod 2 | Aug 13, 2026 | Heavy | 1 | 24 |
| NJ20260050 Mod 2 | Aug 13, 2026 | Heavy | 1 | 24 |
| NJ20260051 Mod 2 | Aug 13, 2026 | Heavy | 1 | 23 |
| NJ20260052 Mod 2 | Aug 13, 2026 | Heavy | 1 | 22 |
| NJ20260053 Mod 2 | Aug 13, 2026 | Heavy | 1 | 24 |
| NJ20260054 Mod 2 | Aug 13, 2026 | Heavy | 1 | 24 |
| NJ20260055 Mod 3 | Aug 13, 2026 | Heavy | 1 | 29 |
| NJ20260056 Mod 3 | Aug 13, 2026 | Heavy | 1 | 28 |
| NJ20260057 Mod 2 | Aug 13, 2026 | Heavy | 1 | 30 |
| NJ20260058 Mod 2 | Aug 13, 2026 | Heavy | 1 | 24 |
| NJ20260059 Mod 2 | Aug 13, 2026 | Heavy | 1 | 23 |
| NJ20260060 Mod 1 | May 18, 2026 | Heavy | 1 | 26 |
| NJ20260061 Mod 1 | May 18, 2026 | Heavy | 1 | 24 |
| NJ20260062 Mod 1 | May 18, 2026 | Heavy | 1 | 24 |
| NJ20260063 Mod 1 | May 18, 2026 | Heavy | 1 | 31 |
| NJ20260064 Mod 2 | May 20, 2026 | Heavy | 1 | 22 |
| NJ20260065 Mod 2 | May 20, 2026 | Heavy | 1 | 25 |
| NJ20260066 Mod 2 | May 20, 2026 | Heavy | 1 | 23 |
How to use a federal rate on a New Jersey job
- Confirm which law governs. Federal or federally assisted money brings Davis-Bacon and the determination. State money brings the state schedule. A job with both must satisfy both.
- Take the determination from the contract. The number and modification printed there control, even if a newer determination exists.
- Split base from fringe. Overtime is 1.5× the basic hourly rate; the fringe obligation continues and is not multiplied.
- Map it onto the payroll. Field 5 takes the determination and modification, columns 6A–6C take base, plan credit and cash fringe — see the WH-347 guide.
Questions
What is the prevailing wage in New Jersey?
There is no single number. 65 active federal determinations cover 21 counties with 1882 rate lines; the rate depends on the classification, the county, the construction type and the determination your contract incorporates.
Are these the rates for state-funded work?
No. These are federal Davis-Bacon determinations. New Jersey state public works use the state agency's own schedule, which is a separate set and often higher.
Why do some counties show several determinations?
Because building, heavy, highway and residential work are published separately, and a county is usually named in more than one of them. Use the construction type that matches the work, not the one with the highest rate.
Turn this rate into a checked payroll
Pick the county and type once, and WageDecoder fills the determination number, checks the classification, the fringe credit and the overtime base, then writes the official WH-347. Free, no account, nothing uploaded.