Wage determination NY20260037, modification 3
Effective Jul 30, 2026. Covers 1 New York county for Heavy, Highway work, with 63 rate lines. Base rates run $20.53–$64.59 and fringe $6.39–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260037 |
| Modification | 3 |
| Effective | Jul 30, 2026 |
| Construction types | Heavy, Highway |
| Counties | 1 |
| Rate lines | 63 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Hazardous Material Handler | $38.50 | $25.04 | $63.54 | 05/01/2023 | ASBE0030-001 |
| Asbestos/insulator Worker | $43.25 | $27.29 | $70.54 | 05/01/2025 | ASBE0030-001 |
| Boilermaker | $43.34 | $27.66 | $71.00 | 01/01/2025 | BOIL0197-001 |
| Cement Mason | $38.63 | $25.05 | $63.68 | 07/01/2025 | BRNY0003-017 |
| Carpenter | $44.52 | $27.16 | $71.68 | 07/01/2025 | CARP0277-020 |
| Cable Splicer | $55.55 | $35.03 | $90.58 | 06/01/2025 | ELEC0043-004 |
| Electrician | $50.50 | $35.03 | $85.53 | 06/01/2025 | ELEC0043-004 |
| Electrician | $48.00 | $32.09 | $80.09 | 06/01/2024 | ELEC0236-002 |
| Cable Splicer | $50.43 | $33.29 | $83.72 | 06/01/2025 | ELEC0325-001 |
| Electrician | $42.68 | $33.06 | $75.74 | 06/01/2025 | ELEC0325-001 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Elevator Constructor | $57.73 | $38.44 | $96.17 | 01/01/2025 | ELEV0035-002 |
| Power Equipment Operators | $57.30 | $33.55 | $90.85 | 07/01/2025 | ENGI0158-028 |
| Power Equipment Operators | $56.39 | $33.55 | $89.94 | 07/01/2025 | ENGI0158-028 |
| Power Equipment Operators | $63.30 | $33.55 | $96.85 | 07/01/2025 | ENGI0158-028 |
| Power Equipment Operators | $61.80 | $33.55 | $95.35 | 07/01/2025 | ENGI0158-028 |
| Power Equipment Operators | $60.30 | $33.55 | $93.85 | 07/01/2025 | ENGI0158-028 |
| Power Equipment Operators | $58.91 | $33.55 | $92.46 | 07/01/2025 | ENGI0158-028 |
| Power Equipment Operators | $53.82 | $33.55 | $87.37 | 07/01/2025 | ENGI0158-028 |
| Ironworkers | $38.75 | $25.48 | $64.23 | 07/01/2024 | IRON0012-008 |
| Ironworkers | $38.75 | $25.48 | $64.23 | 07/01/2024 | IRON0012-008 |
| Ironworkers | $38.50 | $25.48 | $63.98 | 07/01/2024 | IRON0012-008 |
| Ironworker | $35.50 | $31.39 | $66.89 | 07/01/2025 | IRON0440-001 |
| Laborers | $38.40 | $30.40 | $68.80 | 06/01/2023 | LABO0017-006 |
| Laborers | $38.40 | $30.40 | $68.80 | 06/01/2023 | LABO0017-006 |
| Laborers | $41.90 | $30.40 | $72.30 | 06/01/2023 | LABO0017-006 |
| Laborers | $46.75 | $30.40 | $77.15 | 06/01/2023 | LABO0017-006 |
| Painters | $42.06 | $30.59 | $72.65 | 05/01/2023 | PAIN0004-006 |
| Glazier | $30.00 | $31.95 | $61.95 | 05/01/2025 | PAIN0677-003 |
| Plumber, Including Steamfitting | $45.93 | $33.77 | $79.70 | 05/01/2025 | PLUM0112-009 |
| Plumber, Including Steamfitting | $44.91 | $33.31 | $78.22 | 05/01/2025 | PLUM0112-009 |
| Roofer | $30.50 | $19.84 | $50.34 | 06/01/2023 | ROOF0203-001 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $35.94 | $20.89 | $56.83 | 05/01/2023 | SHEE0112-004 |
| Truck Driver | $35.48 | $31.58 | $67.06 | 06/01/2025 | TEAM0317-003 |
| Truck Driver | $35.83 | $31.58 | $67.41 | 06/01/2025 | TEAM0317-003 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.