Wage determination NY20260038, modification 3
Effective Jul 30, 2026. Covers 1 New York county for Heavy, Highway work, with 64 rate lines. Base rates run $15.22–$65.51 and fringe $2.09–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260038 |
| Modification | 3 |
| Effective | Jul 30, 2026 |
| Construction types | Heavy, Highway |
| Counties | 1 |
| Rate lines | 64 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Boilermaker | $35.23 | $26.61 | $61.84 | 01/01/2021 | BOIL0175-001 |
| Bricklayer | $34.15 | $19.71 | $53.86 | 07/01/2017 | BRNY0002-007 |
| Plasterer | $34.15 | $19.71 | $53.86 | 07/01/2017 | BRNY0002-007 |
| Tile Finisher | $26.46 | $19.64 | $46.10 | 07/01/2022 | BRNY0002-007 |
| Tile Setter | $32.92 | $20.42 | $53.34 | 07/01/2022 | BRNY0002-007 |
| Cement Mason/concrete Finisher | $37.23 | $19.51 | $56.74 | 06/01/2018 | BRNY0002-017 |
| Carpenter | $39.52 | $27.16 | $66.68 | 07/01/2025 | CARP0277-003 |
| Carpenter | $39.52 | $27.16 | $66.68 | 07/01/2025 | CARP0277-003 |
| Electrician | $55.55 | $35.03 | $90.58 | 06/01/2025 | ELEC0043-008 |
| Electrician | $50.50 | $35.03 | $85.53 | 06/01/2025 | ELEC0043-008 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Elevator Mechanic | $58.44 | $38.44 | $96.88 | 01/01/2025 | ELEV0062-002 |
| Power Equipment Operators | $55.85 | $33.40 | $89.25 | 07/01/2025 | ENGI0158-020 |
| Power Equipment Operators | $54.97 | $33.40 | $88.37 | 07/01/2025 | ENGI0158-020 |
| Power Equipment Operators | $51.69 | $33.40 | $85.09 | 07/01/2025 | ENGI0158-020 |
| Power Equipment Operators | $65.51 | $33.40 | $98.91 | 07/01/2025 | ENGI0158-020 |
| Power Equipment Operators | $60.35 | $33.40 | $93.75 | 07/01/2025 | ENGI0158-020 |
| Power Equipment Operators | $58.85 | $33.40 | $92.25 | 07/01/2025 | ENGI0158-020 |
| Power Equipment Operators | $57.20 | $33.40 | $90.60 | 07/01/2025 | ENGI0158-020 |
| Ironworker | $37.16 | $30.68 | $67.84 | 07/01/2025 | IRON0060-007 |
| Laborer | $33.95 | $23.10 | $57.05 | 06/01/2023 | LABO0633-001 |
| Laborer | $31.45 | $23.10 | $54.55 | 06/01/2023 | LABO0633-001 |
| Laborer | $36.30 | $25.70 | $62.00 | 07/01/2024 | LABO0633-002 |
| Laborer | $36.50 | $25.70 | $62.20 | 07/01/2024 | LABO0633-002 |
| Laborer | $36.70 | $25.70 | $62.40 | 07/01/2024 | LABO0633-002 |
| Laborer | $36.90 | $25.70 | $62.60 | 07/01/2024 | LABO0633-002 |
| Painter | $42.06 | $30.59 | $72.65 | 05/01/2023 | PAIN0004-023 |
| Painters | $29.90 | $26.25 | $56.15 | 05/01/2025 | PAIN0004-029 |
| Painters | $29.90 | $26.25 | $56.15 | 05/01/2025 | PAIN0004-029 |
| Painters | $30.90 | $26.25 | $57.15 | 05/01/2025 | PAIN0004-029 |
| Glazier | $30.00 | $27.59 | $57.59 | 05/01/2025 | PAIN0677-002 |
| Plumber, Pipefitter, Steamfitter | $32.90 | $23.61 | $56.51 | 05/01/2019 | PLUM0073-001 |
| Roofer | $35.80 | $25.99 | $61.79 | 07/01/2025 | ROOF0195-001 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker, Incl. HVAC Duct | $42.29 | $23.31 | $65.60 | 05/01/2025 | SHEE0058-005 |
| Sheet Metal Worker, Incl. HVAC Duct | $36.29 | $23.31 | $59.60 | 05/01/2025 | SHEE0058-005 |
| Floor Layer | $15.22 | $2.09 | $17.31 | 01/12/1996 | SUNY1996-003 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.