Wage determination NY20260046, modification 3
Effective Jul 30, 2026. Covers 1 New York county for Heavy, Highway work, with 75 rate lines. Base rates run $20.53–$64.59 and fringe $6.39–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260046 |
| Modification | 3 |
| Effective | Jul 30, 2026 |
| Construction types | Heavy, Highway |
| Counties | 1 |
| Rate lines | 75 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Asbestos Workers/insulator | $41.74 | $27.58 | $69.32 | 05/01/2025 | ASBE0040-001 |
| Hazardous Material Handler | $41.74 | $27.58 | $69.32 | 05/01/2025 | ASBE0040-001 |
| Boilermaker | $43.34 | $27.66 | $71.00 | 01/01/2025 | BOIL0197-001 |
| Bricklayer, Caulker, Cleaner, Pointer, Stonemason & Cement Mason | $33.82 | $19.95 | $53.77 | 07/01/2016 | BRNY0002-001 |
| Marble, Tile & Terrazzo Finisher | $25.59 | $16.34 | $41.93 | 07/01/2016 | BRNY0002-001 |
| Marble, Tile Layer & Terrazzo Worker | $32.59 | $19.05 | $51.64 | 07/01/2016 | BRNY0002-001 |
| Cement Mason/concrete Finisher, Heavy & Highway | $37.23 | $19.51 | $56.74 | 07/01/2018 | BRNY0002-001 |
| Carpenter | $41.03 | $24.50 | $65.53 | 07/01/2024 | CARP0291-004 |
| Electrician | $48.00 | $32.09 | $80.09 | 06/01/2024 | ELEC0236-003 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Power Equipment Operators | $54.93 | $33.20 | $88.13 | 07/01/2025 | ENGI0158-003 |
| Power Equipment Operators | $53.91 | $33.20 | $87.11 | 07/01/2025 | ENGI0158-003 |
| Power Equipment Operators | $51.01 | $33.20 | $84.21 | 07/01/2025 | ENGI0158-003 |
| Power Equipment Operators | $55.42 | $33.20 | $88.62 | 07/01/2025 | ENGI0158-003 |
| Power Equipment Operators | $57.30 | $33.55 | $90.85 | 07/01/2025 | ENGI0158-031 |
| Power Equipment Operators | $56.39 | $33.55 | $89.94 | 07/01/2025 | ENGI0158-031 |
| Power Equipment Operators | $63.30 | $33.55 | $96.85 | 07/01/2025 | ENGI0158-031 |
| Power Equipment Operators | $61.80 | $33.55 | $95.35 | 07/01/2025 | ENGI0158-031 |
| Power Equipment Operators | $60.30 | $33.55 | $93.85 | 07/01/2025 | ENGI0158-031 |
| Power Equipment Operators | $58.91 | $33.55 | $92.46 | 07/01/2025 | ENGI0158-031 |
| Power Equipment Operators | $53.82 | $33.55 | $87.37 | 07/01/2025 | ENGI0158-031 |
| Ironworkers | $38.75 | $25.48 | $64.23 | 07/01/2024 | IRON0012-009 |
| Ironworkers | $38.50 | $25.48 | $63.98 | 07/01/2024 | IRON0012-009 |
| Ironworkers | $38.75 | $25.48 | $64.23 | 07/01/2024 | IRON0012-009 |
| Ironworker | $35.50 | $31.39 | $66.89 | 07/01/2025 | IRON0440-001 |
| Laborer Building Construction | $24.00 | $20.64 | $44.64 | 07/01/2017 | LABO0035-007 |
| Laborer Building Construction | $24.00 | $20.64 | $44.64 | 07/01/2017 | LABO0035-007 |
| Laborer Building Construction | $23.00 | $20.64 | $43.64 | 07/01/2017 | LABO0035-007 |
| Laborer Building Construction | $22.50 | $20.64 | $43.14 | 07/01/2017 | LABO0035-007 |
| Laborer Building Construction | $22.65 | $20.64 | $43.29 | 07/01/2017 | LABO0035-007 |
| Laborer Building Construction | $22.90 | $20.64 | $43.54 | 07/01/2017 | LABO0035-007 |
| Laborer | $28.05 | $23.74 | $51.79 | 07/01/2017 | LABO0035-007 |
| Laborer | $28.25 | $23.74 | $51.99 | 07/01/2017 | LABO0035-007 |
| Laborer | $28.45 | $23.74 | $52.19 | 07/01/2017 | LABO0035-007 |
| Laborer | $28.65 | $23.74 | $52.39 | 07/01/2017 | LABO0035-007 |
| Laborer | $24.00 | $20.64 | $44.64 | 07/01/2017 | LABO0035-007 |
| Glazier | $37.25 | $33.54 | $70.79 | 05/01/2025 | PAIN0009-015 |
| Painters | $34.50 | $21.69 | $56.19 | 05/01/2025 | PAIN0201-005 |
| Painters | $33.50 | $21.69 | $55.19 | 05/01/2025 | PAIN0201-005 |
| Painters | $48.75 | $35.63 | $84.38 | 10/01/2014 | PAIN0806-006 |
| Plumber And Steamfitter | $55.26 | $29.12 | $84.38 | 05/01/2025 | PLUM0007-002 |
| Plumber | $45.93 | $33.77 | $79.70 | 05/01/2025 | PLUM0112-002 |
| Plumber And Steamfitter | $45.88 | $33.60 | $79.48 | 05/01/2025 | PLUM0773-004 |
| Roofer | $38.05 | $24.27 | $62.32 | 07/01/2025 | ROOF0241-001 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $33.73 | $33.04 | $66.77 | 06/01/2019 | SHEE0083-002 |
| Truck Drivers | $35.48 | $31.58 | $67.06 | 06/01/2025 | TEAM0317-001 |
| Truck Drivers | $35.83 | $31.58 | $67.41 | 06/01/2025 | TEAM0317-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.