Wage determination NY20260047, modification 2
Effective May 18, 2026. Covers 1 New York county for Highway work, with 65 rate lines. Base rates run $20.53–$64.59 and fringe $6.39–$42.92 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in New York are governed by the state's own schedule, which is a separate set of rates — see New York rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | NY20260047 |
| Modification | 2 |
| Effective | May 18, 2026 |
| Construction types | Highway |
| Counties | 1 |
| Rate lines | 65 |
| Other New York determinations | 98 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Cement Mason/concrete Finisher | $38.63 | $25.05 | $63.68 | 07/01/2025 | BRNY0003-016 |
| Piledriver Heavy And Highway Construction | $41.66 | $28.46 | $70.12 | 07/01/2024 | CARP0276-003 |
| Carpenter Heavy And Highway Construction | $38.18 | $26.11 | $64.29 | 07/01/2024 | CARP0276-003 |
| Carpenter, Piledriver | $41.66 | $28.46 | $70.12 | 07/01/2024 | CARP0276-018 |
| Carpenter | $38.18 | $26.11 | $64.29 | 07/01/2024 | CARP0276-018 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $52.86 | $35.60 | $88.46 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $47.57 | $31.03 | $78.60 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $42.29 | $30.66 | $72.95 | 05/05/2025 | ELEC1249-003 |
| Electrician Line Construction | $31.72 | $29.87 | $61.59 | 05/05/2025 | ELEC1249-003 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $55.40 | $31.78 | $87.18 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $35.34 | $30.12 | $65.46 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $64.59 | $42.92 | $107.51 | 05/05/2025 | ELEC1249-004 |
| Electrician, Line Construction | $63.14 | $33.82 | $96.96 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Switching Structures | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Substation | $49.25 | $31.15 | $80.40 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Overhead And Underground Distribution… | $61.56 | $36.21 | $97.77 | 05/05/2025 | ELEC1249-004 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $38.73 | $6.93 | $45.66 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $20.53 | $6.39 | $26.92 | 01/01/2025 | ELEC1249-008 |
| Electrician Line Construction Telephone, Catv Fiberoptics Cable And… | $40.81 | $6.99 | $47.80 | 01/01/2025 | ELEC1249-008 |
| Operating Engineer | $60.84 | $35.00 | $95.84 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $43.26 | $34.85 | $78.11 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $56.81 | $35.75 | $92.56 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $58.38 | $35.75 | $94.13 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $59.88 | $35.75 | $95.63 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $51.41 | $35.00 | $86.41 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $61.38 | $35.75 | $97.13 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $36.61 | $34.85 | $71.46 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $54.42 | $35.00 | $89.42 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $51.80 | $35.75 | $87.55 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $40.10 | $34.85 | $74.95 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $57.21 | $35.00 | $92.21 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $54.68 | $35.75 | $90.43 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $40.79 | $34.85 | $75.64 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $58.43 | $35.00 | $93.43 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $55.38 | $35.75 | $91.13 | 07/01/2025 | ENGI0158-024 |
| Operating Engineer | $41.26 | $34.85 | $76.11 | 07/01/2025 | ENGI0158-024 |
| Ironworkers | $33.14 | $32.30 | $65.44 | 07/01/2024 | IRON0006-001 |
| Ironworkers | $35.49 | $32.30 | $67.79 | 07/01/2024 | IRON0006-001 |
| Ironworkers | $34.06 | $30.80 | $64.86 | 07/01/2024 | IRON0006-001 |
| Ironworkers | $36.00 | $30.80 | $66.80 | 07/01/2025 | IRON0033-008 |
| Ironworkers | $35.75 | $30.80 | $66.55 | 07/01/2025 | IRON0033-008 |
| Laborers | $34.33 | $28.69 | $63.02 | 07/01/2025 | LABO0621-004 |
| Laborers | $33.93 | $28.69 | $62.62 | 07/01/2025 | LABO0621-004 |
| Painters | $42.06 | $30.59 | $72.65 | 05/01/2023 | PAIN0004-019 |
| Plumber/pipefitter | $42.20 | $29.80 | $72.00 | 04/29/2024 | PLUM0022-007 |
| Sprinkler Fitter | $47.85 | $28.94 | $76.79 | 01/01/2026 | SFNY0669-001 |
| Sheet Metal Worker | $35.94 | $20.89 | $56.83 | 05/01/2023 | SHEE0112-002 |
| Truck Drivers | $35.83 | $31.58 | $67.41 | 06/01/2025 | TEAM0317-001 |
| Truck Drivers | $35.48 | $31.58 | $67.06 | 06/01/2025 | TEAM0317-001 |
| Truck Driver | $35.83 | $31.58 | $67.41 | 06/01/2025 | TEAM0317-005 |
| Truck Driver | $35.48 | $31.58 | $67.06 | 06/01/2025 | TEAM0317-005 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.