Wage determination OR20260001, modification 4
Effective Nov 12, 2026. Covers 36 Oregon counties for Highway work, with 45 rate lines. Base rates run $8.35–$69.85 and fringe $3.74–$34.52 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Oregon are governed by the state's own schedule, which is a separate set of rates — see Oregon rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | OR20260001 |
| Modification | 4 |
| Effective | Nov 12, 2026 |
| Construction types | Highway |
| Counties | 36 |
| Rate lines | 45 |
| Other Oregon determinations | 74 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Bricklayer | $49.60 | $25.15 | $74.75 | 06/01/2025 | BROR0001-031 |
| Millwright | $59.35 | $22.38 | $81.73 | 06/01/2025 | CARP0096-005 |
| Piledriver | $55.79 | $15.81 | $71.60 | 01/01/2025 | CARP0196-003 |
| Carpenters | $53.94 | $16.81 | $70.75 | 06/01/2025 | CARP0503-020 |
| Electrician | $63.50 | $29.73 | $93.23 | 01/01/2025 | ELEC0048-006 |
| Cable Splicer | $69.85 | $30.44 | $100.29 | 01/01/2025 | ELEC0048-006 |
| Electrician | $60.00 | $27.78 | $87.78 | 06/01/2025 | ELEC0112-001 |
| Cable Splicer | $63.00 | $27.87 | $90.87 | 06/01/2025 | ELEC0112-001 |
| Electrician | $56.46 | $23.05 | $79.51 | 01/01/2025 | ELEC0280-003 |
| Cable Splicer | $60.80 | $22.24 | $83.04 | 01/01/2025 | ELEC0280-003 |
| Electrician | $42.55 | $19.86 | $62.41 | 12/01/2024 | ELEC0291-006 |
| Cable Splicer | $46.81 | $19.86 | $66.67 | 12/01/2024 | ELEC0291-006 |
| Electrician | $47.04 | $21.84 | $68.88 | 01/01/2026 | ELEC0659-004 |
| Cable Splicer | $64.58 | $23.31 | $87.89 | 01/01/2026 | ELEC0659-004 |
| Electrician | $50.03 | $24.00 | $74.03 | 01/01/2024 | ELEC0932-004 |
| Power Equipment Operator | $45.81 | $16.90 | $62.71 | 01/01/2024 | ENGI0701-005 |
| Power Equipment Operator | $49.03 | $16.90 | $65.93 | 01/01/2024 | ENGI0701-005 |
| Power Equipment Operator | $50.27 | $16.90 | $67.17 | 01/01/2024 | ENGI0701-005 |
| Power Equipment Operator | $53.60 | $16.90 | $70.50 | 01/01/2024 | ENGI0701-005 |
| Power Equipment Operator | $54.75 | $16.90 | $71.65 | 01/01/2024 | ENGI0701-005 |
| Power Equipment Operator | $60.98 | $16.90 | $77.88 | 01/01/2024 | ENGI0701-005 |
| Power Equipment Operator | $58.82 | $16.90 | $75.72 | 01/01/2024 | ENGI0701-005 |
| Power Equipment Operator | $56.66 | $16.90 | $73.56 | 01/01/2024 | ENGI0701-005 |
| Ironworker | $48.31 | $34.52 | $82.83 | 07/07/2025 | IRON0029-004 |
| Mason Tender/hod Carrier | $43.79 | $17.05 | $60.84 | 06/01/2024 | LABO0737-001 |
| Laborers | $34.39 | $17.30 | $51.69 | 06/01/2024 | LABO0737-008 |
| Laborers | $40.41 | $17.30 | $57.71 | 06/01/2024 | LABO0737-008 |
| Laborers | $39.00 | $17.30 | $56.30 | 06/01/2024 | LABO0737-008 |
| Painter | $41.19 | $17.09 | $58.28 | 07/01/2025 | PAIN0010-005 |
| Painter | $40.25 | $16.67 | $56.92 | 01/01/2025 | PAIN0010-008 |
| Cement Masons | $47.09 | $20.31 | $67.40 | 06/01/2025 | PLAS0555-001 |
| Cement Masons | $47.09 | $20.31 | $67.40 | 06/01/2025 | PLAS0555-001 |
| Cement Masons | $48.05 | $20.31 | $68.36 | 06/01/2025 | PLAS0555-001 |
| Cement Mason | $46.13 | $20.31 | $66.44 | 06/01/2025 | PLAS0555-001 |
| Timber Sales Roads | $9.74 | $3.74 | $13.48 | 04/01/1991 | SUOR1991-003 |
| Timber Sales Roads | $9.12 | $4.30 | $13.42 | 04/01/1991 | SUOR1991-003 |
| Timber Sales Roads | $10.37 | $4.15 | $14.52 | 04/01/1991 | SUOR1991-003 |
| Timber Sales Roads | $8.35 | $4.30 | $12.65 | 04/01/1991 | SUOR1991-003 |
| Truck Drivers | $36.82 | $18.30 | $55.12 | 06/01/2025 | TEAM0037-004 |
| Truck Drivers | $36.57 | $18.30 | $54.87 | 06/01/2025 | TEAM0037-004 |
| Truck Drivers | $36.35 | $18.30 | $54.65 | 06/01/2025 | TEAM0037-004 |
| Truck Drivers | $36.08 | $18.30 | $54.38 | 06/01/2025 | TEAM0037-004 |
| Truck Drivers | $35.74 | $18.30 | $54.04 | 06/01/2025 | TEAM0037-004 |
| Truck Drivers | $35.57 | $18.30 | $53.87 | 06/01/2025 | TEAM0037-004 |
| Truck Drivers | $35.41 | $18.30 | $53.71 | 06/01/2025 | TEAM0037-004 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.