Prevailing wage rates in Oregon
Every active federal Davis-Bacon determination that covers Oregon: 74 determinations, 36 counties, 2161 rate lines, newest effective Nov 12, 2026. Pick your county below, or read the rate ranges by trade.
What this page covers
State-funded work is separate. Oregon public works are governed by ORS 279C.800 – 279C.870 (state PWR law) and administered by Bureau of Labor and Industries (BOLI), covering contracts above $50,000. The state form is the Payroll and Certified Statement. A federal determination does not replace the state rate, and on a project covered by both laws you must satisfy both — usually the higher rate plus each law's paperwork.
State rules, the filing clock and the penalty: Oregon certified payroll.
Counties covered
Each row is a Oregon county that appears in an active federal determination. The count is the number of determinations naming that county — usually one per construction type.
| County | Determinations | Construction types | Newest effective | Look up |
|---|---|---|---|---|
| Baker | 5 | Highway, Building, Residential, Heavy | Nov 12, 2026 | Rates → |
| Benton | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Clackamas | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Clatsop | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Columbia | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Coos | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Crook | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Curry | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Deschutes | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Douglas | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Gilliam | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Grant | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Harney | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Hood River | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Jackson | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Jefferson | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Josephine | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Klamath | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Lake | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Lane | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Lincoln | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Linn | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Malheur | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Marion | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Morrow | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Multnomah | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Polk | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Sherman | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Tillamook | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Umatilla | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Union | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Wallowa | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Wasco | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Washington | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Wheeler | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
| Yamhill | 5 | Highway, Residential, Heavy, Building | Nov 12, 2026 | Rates → |
Rates by trade and construction type
These are the ranges across every Oregon county in the current determinations. A range means the same classification carries different rates in different counties, or the determination lists regional sub-rates — the exact figure for a job comes from the determination that names that county.
| Classification | Type | Basic hourly rate | Fringe | Rate lines |
|---|---|---|---|---|
| Asbestos Worker/heat & Frost Insulator | Heavy | $62.02 | $22.36 | 1 |
| Brick Finisher | Building | $32.68 | $16.48 | 5 |
| Bricklayer | Building | $49.60 | $25.15 | 24 |
| Bricklayer | Heavy | $49.60 | $25.15 | 7 |
| Bricklayer | Highway | $49.60 | $25.15 | 1 |
| Bricklayer | Residential | $49.60 | $25.15 | 10 |
| Cable Splicer | Highway | $46.81 – $69.85 | $19.86 – $30.44 | 5 |
| Carpenter | Building | $25.69 – $52.62 | $0.00 – $16.81 | 16 |
| Carpenter | Heavy | $23.50 – $53.94 | $9.27 – $16.81 | 31 |
| Carpenter | Residential | $12.50 – $19.99 | $2.06 – $7.78 | 9 |
| Carpenter, Excludes Drywall Hanging | Building | $27.75 – $28.17 | $5.69 – $5.77 | 3 |
| Carpenter, Excludes Form Work | Residential | $7.25 – $19.99 | $0.00 – $7.78 | 7 |
| Carpenter, Includes Form Work | Building | $52.62 | $16.81 | 5 |
| Carpenter, Includes Form Work | Heavy | $23.20 | $9.47 | 1 |
| Carpenter, Including Accoustical Ceiling Installation And… | Residential | $33.48 – $36.27 | $14.03 | 2 |
| Carpenter, Including Accoustical Ceiling Installation, Form… | Residential | $33.48 – $36.27 | $14.03 | 8 |
| Carpenters | Heavy | $53.94 | $16.81 | 7 |
| Carpenters | Highway | $53.94 | $16.81 | 1 |
| Carpenters | Residential | $33.48 – $36.27 | $14.03 | 20 |
| Caulker | Building | $47.58 | $28.45 | 5 |
| Cement Mason | Highway | $46.13 | $20.31 | 1 |
| Cement Mason/concrete Finisher | Building | $30.07 – $46.13 | $18.18 – $20.31 | 24 |
| Cement Mason/concrete Finisher | Heavy | $21.13 – $46.13 | $3.52 – $20.31 | 29 |
| Cement Mason/concrete Finisher | Residential | $46.13 | $20.31 | 18 |
| Cement Masons | Highway | $47.09 – $48.05 | $20.31 | 3 |
| Dredging | Heavy | $47.95 – $62.47 | $16.70 | 15 |
| Drywall Finisher/taper | Building | $45.52 | $22.03 | 18 |
| Drywall Finisher/taper | Heavy | $24.05 | $0.00 | 2 |
| Drywall Hanger | Building | $52.43 | $17.01 | 8 |
| Electrician | Building | $47.04 – $63.50 | $21.84 – $29.73 | 28 |
| Electrician | Heavy | $29.90 – $63.50 | $11.92 – $29.73 | 46 |
| Electrician | Highway | $42.55 – $63.50 | $19.86 – $29.73 | 6 |
| Electrician | Residential | $31.05 – $42.55 | $12.04 – $22.45 | 30 |
| Electrician, Excludes Low Voltage Wiring | Building | $40.48 – $56.46 | $19.97 – $23.05 | 8 |
| Electrician, Includes Low Voltage Wiring | Building | $63.50 | $29.73 | 1 |
| Fence Erector | Residential | $16.30 | $2.22 | 5 |
| Floor Layer | Building | $41.77 | $21.18 | 5 |
| Glazier | Building | $53.15 | $23.21 | 9 |
| Heat & Frost Insulator | Building | $46.64 – $62.02 | $18.88 – $22.36 | 29 |
| Highway/parking Lot Striping | Heavy | $23.79 – $24.74 | $5.43 – $6.57 | 4 |
| Highway/parking Lot Striping | Residential | $41.19 | $17.09 | 5 |
| Insulator - Batt | Residential | $18.57 | $0.00 | 1 |
| Ironworker | Building | $36.71 – $48.31 | $28.16 – $34.52 | 24 |
| Ironworker | Heavy | $48.31 | $34.52 | 29 |
| Ironworker | Highway | $48.31 | $34.52 | 1 |
| Laborer | Building | $15.05 – $43.79 | $0.00 – $17.30 | 115 |
| Laborer | Heavy | $10.60 – $28.14 | $0.00 – $9.39 | 135 |
| Laborer | Residential | $10.08 – $26.00 | $0.00 – $9.95 | 25 |
| Laborers | Heavy | $34.39 – $43.79 | $17.05 – $17.30 | 95 |
| Laborers | Highway | $34.39 – $40.41 | $17.30 | 3 |
| Laborers | Residential | $34.39 – $43.79 | $17.05 – $17.30 | 44 |
| Line Construction | Heavy | $31.36 – $64.17 | $7.27 – $24.54 | 16 |
| Mason Tender/hod Carrier | Highway | $43.79 | $17.05 | 1 |
| Mason Tender/hod Carrier | Residential | $43.79 | $17.05 | 1 |
| Millwright | Heavy | $59.35 | $22.38 | 21 |
| Millwright | Highway | $59.35 | $22.38 | 1 |
| Operator | Building | $20.43 – $58.82 | $0.00 – $16.90 | 163 |
| Operator | Heavy | $19.84 – $36.60 | $0.00 – $9.97 | 138 |
| Painter | Building | $40.85 | $16.68 | 11 |
| Painter | Heavy | $19.77 – $41.19 | $0.00 – $17.09 | 11 |
| Painter | Highway | $40.25 – $41.19 | $16.67 – $17.09 | 2 |
| Painter | Residential | $12.00 | $0.00 | 6 |
| Painters | Heavy | $39.94 | $16.68 | 27 |
| Painters | Residential | $40.85 | $16.68 | 10 |
| Piledriver | Highway | $55.79 | $15.81 | 1 |
| Piledriverman | Heavy | $26.19 – $53.94 | $11.58 – $16.81 | 7 |
| Pipefitter | Building | $60.77 | $34.72 | 11 |
| Pipefitter | Heavy | $60.77 | $34.72 | 5 |
| Plasterer | Building | $23.66 – $46.56 | $0.00 – $19.83 | 5 |
| Plasterer | Residential | $19.91 – $46.56 | $0.00 – $19.83 | 5 |
| Plumber | Building | $60.77 | $34.72 | 24 |
| Plumber | Residential | $48.62 | $34.72 | 5 |
| Plumbers | Residential | $48.62 | $34.72 | 5 |
| Plumbers And Pipefitters | Heavy | $39.90 – $65.20 | $18.67 – $34.91 | 13 |
| Power Equipment Operator | Heavy | $45.81 – $60.98 | $16.90 | 256 |
| Power Equipment Operator | Highway | $45.81 – $60.98 | $16.90 | 8 |
| Power Equipment Operator | Residential | $45.81 – $60.98 | $16.90 | 125 |
| Roofer | Building | $27.49 – $33.19 | $0.00 | 11 |
| Roofer | Residential | $12.00 – $14.41 | $0.00 | 19 |
| Sheet Metal Worker | Building | $45.09 – $54.99 | $30.40 – $33.92 | 24 |
| Sheet Metal Worker | Residential | $25.67 | $0.00 | 5 |
| Sheet Metal Worker, Excludes HVAC Duct And Unit Installation | Building | $54.99 | $33.92 | 1 |
| Sheet Metal Worker, Includes HVAC Duct Installation | Building | $54.99 | $33.92 | 1 |
| Sheet Metal Worker, Includes HVAC Unit Installation | Building | $47.76 | $30.40 | 6 |
| Sprinkler Fitter | Building | $51.65 | $27.57 | 5 |
| Tile Finisher | Building | $32.68 | $16.48 | 11 |
| Tile Finisher | Residential | $32.68 | $16.48 | 5 |
| Tile Setter | Building | $43.93 | $21.81 | 11 |
| Tile Setter | Residential | $43.93 | $21.81 | 5 |
| Timber Sales Roads | Highway | $8.35 – $10.37 | $3.74 – $4.30 | 4 |
| Truck Driver | Building | $21.30 | $5.66 | 11 |
| Truck Driver | Heavy | $15.01 – $36.82 | $3.04 – $18.30 | 136 |
| Truck Driver | Residential | $15.00 – $17.39 | $0.00 – $6.18 | 20 |
| Truck Drivers | Heavy | $35.41 | $18.30 | 4 |
| Truck Drivers | Highway | $35.41 – $36.82 | $18.30 | 7 |
| Truck Drivers | Residential | $35.41 – $36.82 | $18.30 | 63 |
The determinations
Read the scope before the table: a determination covers the counties and construction types listed here, and the contract that incorporates it fixes its version.
| Determination | Newest effective | Types | Counties | Rate lines |
|---|---|---|---|---|
| OR20260001 Mod 4 | Nov 12, 2026 | Highway | 36 | 45 |
| OR20260002 Mod 1 | May 18, 2026 | Building | 1 | 18 |
| OR20260003 Mod 1 | May 18, 2026 | Residential | 1 | 20 |
| OR20260004 Mod 1 | May 18, 2026 | Residential | 1 | 20 |
| OR20260005 Mod 2 | May 18, 2026 | Residential | 1 | 19 |
| OR20260006 Mod 2 | May 18, 2026 | Residential | 1 | 18 |
| OR20260007 Mod 2 | May 18, 2026 | Residential | 1 | 19 |
| OR20260008 Mod 1 | May 18, 2026 | Residential | 1 | 20 |
| OR20260009 Mod 2 | May 18, 2026 | Residential | 7 | 23 |
| OR20260010 Mod 1 | May 18, 2026 | Residential | 3 | 22 |
| OR20260011 Mod 2 | May 18, 2026 | Residential | 9 | 23 |
| OR20260012 Mod 1 | May 18, 2026 | Residential | 1 | 31 |
| OR20260013 Mod 1 | May 18, 2026 | Residential | 1 | 31 |
| OR20260014 Mod 1 | May 18, 2026 | Residential | 1 | 24 |
| OR20260015 Mod 2 | May 18, 2026 | Residential | 1 | 24 |
| OR20260016 Mod 1 | May 18, 2026 | Residential | 1 | 23 |
| OR20260017 Mod 1 | May 18, 2026 | Residential | 1 | 31 |
| OR20260018 Mod 1 | May 18, 2026 | Residential | 1 | 22 |
| OR20260019 Mod 1 | May 18, 2026 | Residential | 1 | 30 |
| OR20260020 Mod 1 | May 18, 2026 | Residential | 1 | 31 |
| OR20260021 Mod 1 | May 18, 2026 | Residential | 2 | 27 |
| OR20260052 Mod 1 | May 18, 2026 | Heavy | 1 | 39 |
| OR20260053 Mod 1 | May 18, 2026 | Heavy | 1 | 41 |
| OR20260054 Mod 1 | May 18, 2026 | Heavy | 1 | 41 |
| OR20260055 Mod 1 | May 18, 2026 | Heavy | 1 | 38 |
| OR20260056 Mod 2 | May 18, 2026 | Heavy | 1 | 35 |
| OR20260057 Mod 1 | May 18, 2026 | Heavy | 1 | 35 |
| OR20260058 Mod 1 | May 18, 2026 | Heavy | 1 | 26 |
| OR20260059 Mod 1 | May 18, 2026 | Heavy | 1 | 38 |
| OR20260060 Mod 1 | May 18, 2026 | Heavy | 1 | 31 |
| OR20260061 Mod 1 | May 18, 2026 | Heavy | 1 | 41 |
| OR20260062 Mod 1 | May 18, 2026 | Heavy | 1 | 46 |
| OR20260063 Mod 1 | May 18, 2026 | Heavy | 1 | 36 |
| OR20260064 Mod 1 | May 18, 2026 | Heavy | 1 | 35 |
| OR20260065 Mod 1 | May 18, 2026 | Heavy | 1 | 36 |
| OR20260066 Mod 2 | May 18, 2026 | Heavy | 1 | 32 |
| OR20260067 Mod 1 | May 18, 2026 | Heavy | 1 | 34 |
| OR20260068 Mod 1 | May 18, 2026 | Heavy | 1 | 34 |
| OR20260069 Mod 1 | May 18, 2026 | Heavy | 1 | 33 |
| OR20260070 Mod 2 | May 18, 2026 | Heavy | 1 | 31 |
| OR20260071 Mod 2 | May 18, 2026 | Heavy | 1 | 32 |
| OR20260072 Mod 1 | May 18, 2026 | Heavy | 1 | 36 |
| OR20260073 Mod 1 | May 18, 2026 | Heavy | 1 | 36 |
| OR20260074 Mod 1 | May 18, 2026 | Heavy | 1 | 33 |
| OR20260075 Mod 1 | May 18, 2026 | Heavy | 1 | 32 |
| OR20260076 Mod 1 | May 18, 2026 | Heavy | 1 | 36 |
| OR20260077 Mod 1 | May 18, 2026 | Heavy | 1 | 31 |
| OR20260078 Mod 1 | May 18, 2026 | Heavy | 1 | 33 |
| OR20260079 Mod 1 | May 18, 2026 | Heavy | 1 | 32 |
| OR20260080 Mod 2 | May 18, 2026 | Heavy | 8 | 38 |
| OR20260081 Mod 1 | May 18, 2026 | Heavy | 36 | 15 |
| OR20260082 Mod 1 | May 18, 2026 | Building | 1 | 14 |
| OR20260083 Mod 1 | May 18, 2026 | Building | 1 | 18 |
| OR20260084 Mod 1 | May 18, 2026 | Building | 1 | 14 |
| OR20260085 Mod 1 | May 18, 2026 | Building | 1 | 15 |
| OR20260086 Mod 1 | May 18, 2026 | Building | 1 | 18 |
| OR20260087 Mod 1 | May 18, 2026 | Building | 1 | 17 |
| OR20260088 Mod 1 | May 18, 2026 | Building | 1 | 18 |
| OR20260089 Mod 1 | May 18, 2026 | Building | 1 | 18 |
| OR20260090 Mod 1 | May 18, 2026 | Building | 1 | 18 |
| OR20260091 Mod 1 | May 18, 2026 | Building | 1 | 16 |
| OR20260092 Mod 1 | May 18, 2026 | Building | 3 | 14 |
| OR20260093 Mod 1 | May 18, 2026 | Building | 9 | 18 |
| OR20260094 Mod 1 | May 18, 2026 | Building | 1 | 33 |
| OR20260095 Mod 1 | May 18, 2026 | Building | 1 | 43 |
| OR20260096 Mod 1 | May 18, 2026 | Building | 1 | 43 |
| OR20260097 Mod 1 | May 18, 2026 | Building | 1 | 30 |
| OR20260098 Mod 1 | May 18, 2026 | Building | 1 | 33 |
| OR20260099 Mod 1 | May 18, 2026 | Building | 1 | 33 |
| OR20260100 Mod 1 | May 18, 2026 | Building | 1 | 43 |
| OR20260101 Mod 1 | May 18, 2026 | Building | 1 | 43 |
| OR20260102 Mod 1 | May 18, 2026 | Building | 1 | 43 |
| OR20260103 Mod 2 | May 18, 2026 | Building | 2 | 30 |
| OR20260104 Mod 1 | May 18, 2026 | Building | 2 | 32 |
How to use a federal rate on a Oregon job
- Confirm which law governs. Federal or federally assisted money brings Davis-Bacon and the determination. State money brings the state schedule. A job with both must satisfy both.
- Take the determination from the contract. The number and modification printed there control, even if a newer determination exists.
- Split base from fringe. Overtime is 1.5× the basic hourly rate; the fringe obligation continues and is not multiplied.
- Map it onto the payroll. Field 5 takes the determination and modification, columns 6A–6C take base, plan credit and cash fringe — see the WH-347 guide.
Questions
What is the prevailing wage in Oregon?
There is no single number. 74 active federal determinations cover 36 counties with 2161 rate lines; the rate depends on the classification, the county, the construction type and the determination your contract incorporates.
Are these the rates for state-funded work?
No. These are federal Davis-Bacon determinations. Oregon state public works use the state agency's own schedule, which is a separate set and often higher.
Why do some counties show several determinations?
Because building, heavy, highway and residential work are published separately, and a county is usually named in more than one of them. Use the construction type that matches the work, not the one with the highest rate.
Turn this rate into a checked payroll
Pick the county and type once, and WageDecoder fills the determination number, checks the classification, the fringe credit and the overtime base, then writes the official WH-347. Free, no account, nothing uploaded.