Wage determination OR20260013, modification 1
Effective May 18, 2026. Covers 1 Oregon county for Residential work, with 31 rate lines. Base rates run $12.00–$60.98 and fringe $0.00–$34.72 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Oregon are governed by the state's own schedule, which is a separate set of rates — see Oregon rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | OR20260013 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Residential |
| Counties | 1 |
| Rate lines | 31 |
| Other Oregon determinations | 74 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Bricklayer | $49.60 | $25.15 | $74.75 | 06/01/2025 | BROR0001-032 |
| Tile Setter | $43.93 | $21.81 | $65.74 | 05/01/2025 | BROR0001-034 |
| Tile Finisher | $32.68 | $16.48 | $49.16 | 05/01/2025 | BROR0001-034 |
| Carpenter, Including Accoustical Ceiling Installation, Form Work,… | $33.48 | $14.03 | $47.51 | 07/01/2024 | CARP0503-010 |
| Carpenter, Including Accoustical Ceiling Installation, Form Work,… | $36.27 | $14.03 | $50.30 | 07/01/2024 | CARP0503-010 |
| Electrician | $41.67 | $19.08 | $60.75 | 01/01/2025 | ELEC0048-016 |
| Power Equipment Operator | $45.81 | $16.90 | $62.71 | 01/01/2024 | ENGI0701-019 |
| Power Equipment Operator | $49.03 | $16.90 | $65.93 | 01/01/2024 | ENGI0701-019 |
| Power Equipment Operator | $50.27 | $16.90 | $67.17 | 01/01/2024 | ENGI0701-019 |
| Power Equipment Operator | $53.60 | $16.90 | $70.50 | 01/01/2024 | ENGI0701-019 |
| Power Equipment Operator | $54.75 | $16.90 | $71.65 | 01/01/2024 | ENGI0701-019 |
| Power Equipment Operator | $60.98 | $16.90 | $77.88 | 01/01/2024 | ENGI0701-019 |
| Power Equipment Operator | $58.82 | $16.90 | $75.72 | 01/01/2024 | ENGI0701-019 |
| Power Equipment Operator | $56.66 | $16.90 | $73.56 | 01/01/2024 | ENGI0701-019 |
| Laborers | $43.79 | $17.05 | $60.84 | 06/01/2024 | LABO0737-003 |
| Mason Tender/hod Carrier | $43.79 | $17.05 | $60.84 | 06/01/2024 | LABO0737-004 |
| Laborers | $34.39 | $17.30 | $51.69 | 06/01/2024 | LABO0737-012 |
| Laborers | $40.41 | $17.30 | $57.71 | 06/01/2024 | LABO0737-012 |
| Painters | $40.85 | $16.68 | $57.53 | 07/01/2025 | PAIN0010-002 |
| Highway/parking Lot Striping | $41.19 | $17.09 | $58.28 | 07/01/2025 | PAIN0010-003 |
| Plasterer | $46.56 | $19.83 | $66.39 | 07/01/2025 | PLAS0082-002 |
| Cement Mason/concrete Finisher | $46.13 | $20.31 | $66.44 | 06/01/2025 | PLAS0555-003 |
| Plumber | $48.62 | $34.72 | $83.34 | 04/01/2025 | PLUM0290-007 |
| Truck Driver | $17.00 | $5.95 | $22.95 | 10/16/2009 | SUOR2009-011 |
| Truck Driver | $16.91 | $0.00 | $16.91 | 10/16/2009 | SUOR2009-011 |
| Sheet Metal Worker | $25.67 | $0.00 | $25.67 | 10/16/2009 | SUOR2009-011 |
| Roofer | $12.00 | $0.00 | $12.00 | 10/16/2009 | SUOR2009-011 |
| Laborer | $22.18 | $7.40 | $29.58 | 10/16/2009 | SUOR2009-011 |
| Laborer | $15.50 | $4.53 | $20.03 | 10/16/2009 | SUOR2009-011 |
| Fence Erector | $16.30 | $2.22 | $18.52 | 10/16/2009 | SUOR2009-011 |
| Carpenter | $17.85 | $2.30 | $20.15 | 10/16/2009 | SUOR2009-011 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.