Wage determination TX20260006, modification 1
Effective May 18, 2026. Covers 1 Texas county for Heavy work, with 17 rate lines. Base rates run $8.81–$21.29 and fringe $0.00–$0.00 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Texas are governed by the state's own schedule, which is a separate set of rates — see Texas rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | TX20260006 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 1 |
| Rate lines | 17 |
| Other Texas determinations | 289 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Truck Driver | $11.61 | $0.00 | $11.61 | 08/08/2011 | SUTX2011-019 |
| Truck Driver | $15.93 | $0.00 | $15.93 | 08/08/2011 | SUTX2011-019 |
| Power Equipment Operator | $17.07 | $0.00 | $17.07 | 08/08/2011 | SUTX2011-019 |
| Power Equipment Operator | $18.37 | $0.00 | $18.37 | 08/08/2011 | SUTX2011-019 |
| Power Equipment Operator | $17.00 | $0.00 | $17.00 | 08/08/2011 | SUTX2011-019 |
| Power Equipment Operator | $14.05 | $0.00 | $14.05 | 08/08/2011 | SUTX2011-019 |
| Power Equipment Operator | $15.58 | $0.00 | $15.58 | 08/08/2011 | SUTX2011-019 |
| Painter | $21.29 | $0.00 | $21.29 | 08/08/2011 | SUTX2011-019 |
| Laborer | $10.71 | $0.00 | $10.71 | 08/08/2011 | SUTX2011-019 |
| Laborer | $11.57 | $0.00 | $11.57 | 08/08/2011 | SUTX2011-019 |
| Laborer | $11.17 | $0.00 | $11.17 | 08/08/2011 | SUTX2011-019 |
| Laborer | $11.81 | $0.00 | $11.81 | 08/08/2011 | SUTX2011-019 |
| Laborer | $8.81 | $0.00 | $8.81 | 08/08/2011 | SUTX2011-019 |
| Laborer | $11.65 | $0.00 | $11.65 | 08/08/2011 | SUTX2011-019 |
| Form Builder/form Setter | $12.71 | $0.00 | $12.71 | 08/08/2011 | SUTX2011-019 |
| Form Builder/form Setter | $10.71 | $0.00 | $10.71 | 08/08/2011 | SUTX2011-019 |
| Cement Mason/concrete Finisher | $12.64 | $0.00 | $12.64 | 08/08/2011 | SUTX2011-019 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.