Wage determination TX20260021, modification 1
Effective May 18, 2026. Covers 2 Texas counties for Heavy work, with 7 rate lines. Base rates run $7.25–$13.37 and fringe $0.00–$2.58 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Texas are governed by the state's own schedule, which is a separate set of rates — see Texas rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | TX20260021 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 2 |
| Rate lines | 7 |
| Other Texas determinations | 289 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Power Equipment Operators | $8.72 | $0.00 | $8.72 | 12/01/1987 | SUTX1987-001 |
| Power Equipment Operators | $9.21 | $0.00 | $9.21 | 12/01/1987 | SUTX1987-001 |
| Laborers | $7.68 | $0.00 | $7.68 | 12/01/1987 | SUTX1987-001 |
| Laborers | $7.25 | $0.00 | $7.25 | 12/01/1987 | SUTX1987-001 |
| Electrician | $13.37 | $2.58 | $15.95 | 12/01/1987 | SUTX1987-001 |
| Concrete Finisher | $7.56 | $0.00 | $7.56 | 12/01/1987 | SUTX1987-001 |
| Carpenter | $9.05 | $0.00 | $9.05 | 12/01/1987 | SUTX1987-001 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.