Wage determination TX20260043, modification 1
Effective May 18, 2026. Covers 4 Texas counties for Heavy work, with 48 rate lines. Base rates run $8.00–$17.22 and fringe $0.00–$0.00 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Texas are governed by the state's own schedule, which is a separate set of rates — see Texas rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | TX20260043 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Heavy |
| Counties | 4 |
| Rate lines | 48 |
| Other Texas determinations | 289 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Work Zone Barricade Servicer | $9.52 | $0.00 | $9.52 | 11/09/2011 | SUTX2005-006 |
| Truck Driver, Tandem Axle, Semi-trailer | $10.33 | $0.00 | $10.33 | 11/09/2011 | SUTX2005-006 |
| Truck Driver, Single Axle, Light | $10.24 | $0.00 | $10.24 | 11/09/2011 | SUTX2005-006 |
| Truck Driver, Single Axle, Heavy | $10.56 | $0.00 | $10.56 | 11/09/2011 | SUTX2005-006 |
| Truck Driver, Lowboy-float | $11.64 | $0.00 | $11.64 | 11/09/2011 | SUTX2005-006 |
| Traveling Mixer Operator | $10.07 | $0.00 | $10.07 | 11/09/2011 | SUTX2005-006 |
| Tractor Operator, Pneumatic | $11.57 | $0.00 | $11.57 | 11/09/2011 | SUTX2005-006 |
| Tractor Operator, Crawler Type | $12.00 | $0.00 | $12.00 | 11/09/2011 | SUTX2005-006 |
| Spreader Box Operator | $10.39 | $0.00 | $10.39 | 11/09/2011 | SUTX2005-006 |
| Servicer | $11.43 | $0.00 | $11.43 | 11/09/2011 | SUTX2005-006 |
| Scraper Operator | $10.29 | $0.00 | $10.29 | 11/09/2011 | SUTX2005-006 |
| Roller Operator, Steel Wheel, Plant Mix Pavement | $9.70 | $0.00 | $9.70 | 11/09/2011 | SUTX2005-006 |
| Roller Operator, Steel Wheel, Flat Wheel/tamping | $8.75 | $0.00 | $8.75 | 11/09/2011 | SUTX2005-006 |
| Roller Operator, Pneumatic, Self-propelled | $8.87 | $0.00 | $8.87 | 11/09/2011 | SUTX2005-006 |
| Reinforcing Steel Setter, Structure | $15.52 | $0.00 | $15.52 | 11/09/2011 | SUTX2005-006 |
| Reinforcing Steel Setter, Paving | $13.48 | $0.00 | $13.48 | 11/09/2011 | SUTX2005-006 |
| Pipelayer | $10.85 | $0.00 | $10.85 | 11/09/2011 | SUTX2005-006 |
| Piledriverman | $11.00 | $0.00 | $11.00 | 11/09/2011 | SUTX2005-006 |
| Pavement Marking Machine Operator | $11.17 | $0.00 | $11.17 | 11/09/2011 | SUTX2005-006 |
| Oiler | $12.50 | $0.00 | $12.50 | 11/09/2011 | SUTX2005-006 |
| Motor Grader Operator, Rough | $13.11 | $0.00 | $13.11 | 11/09/2011 | SUTX2005-006 |
| Motor Grader Operator, Fine Grade | $14.29 | $0.00 | $14.29 | 11/09/2011 | SUTX2005-006 |
| Mixer Operator | $10.09 | $0.00 | $10.09 | 11/09/2011 | SUTX2005-006 |
| Milling Machine Operator, Fine Grade | $10.25 | $0.00 | $10.25 | 11/09/2011 | SUTX2005-006 |
| Mechanic | $14.79 | $0.00 | $14.79 | 11/09/2011 | SUTX2005-006 |
| Laborer, Utility | $10.57 | $0.00 | $10.57 | 11/09/2011 | SUTX2005-006 |
| Laborer, Common | $8.69 | $0.00 | $8.69 | 11/09/2011 | SUTX2005-006 |
| Front End Loader Operator | $10.83 | $0.00 | $10.83 | 11/09/2011 | SUTX2005-006 |
| Foundation Drill Operator, Truck Mounted | $16.00 | $0.00 | $16.00 | 11/09/2011 | SUTX2005-006 |
| Form Setter, Paving & Curb | $10.63 | $0.00 | $10.63 | 11/09/2011 | SUTX2005-006 |
| Form Liner - Paving & Curb | $8.00 | $0.00 | $8.00 | 11/09/2011 | SUTX2005-006 |
| Form Builder/setter, Structures | $11.21 | $0.00 | $11.21 | 11/09/2011 | SUTX2005-006 |
| Flagger | $8.06 | $0.00 | $8.06 | 11/09/2011 | SUTX2005-006 |
| Electrician | $17.22 | $0.00 | $17.22 | 11/09/2011 | SUTX2005-006 |
| Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel Operator | $12.50 | $0.00 | $12.50 | 11/09/2011 | SUTX2005-006 |
| Concrete Rubber | $9.49 | $0.00 | $9.49 | 11/09/2011 | SUTX2005-006 |
| Concrete Paving Saw Operator | $12.30 | $0.00 | $12.30 | 11/09/2011 | SUTX2005-006 |
| Concrete Finisher, Structures | $11.27 | $0.00 | $11.27 | 11/09/2011 | SUTX2005-006 |
| Concrete Finisher, Paving | $11.70 | $0.00 | $11.70 | 11/09/2011 | SUTX2005-006 |
| Carpenter | $11.73 | $0.00 | $11.73 | 11/09/2011 | SUTX2005-006 |
| Bulldozer Operator | $11.80 | $0.00 | $11.80 | 11/09/2011 | SUTX2005-006 |
| Broom Or Sweeper Operator | $9.09 | $0.00 | $9.09 | 11/09/2011 | SUTX2005-006 |
| Batching Plant Weigher | $17.11 | $0.00 | $17.11 | 11/09/2011 | SUTX2005-006 |
| Asphalt Shoveler | $8.28 | $0.00 | $8.28 | 11/09/2011 | SUTX2005-006 |
| Asphalt Raker | $9.30 | $0.00 | $9.30 | 11/09/2011 | SUTX2005-006 |
| Asphalt Paving Machine Operator | $11.82 | $0.00 | $11.82 | 11/09/2011 | SUTX2005-006 |
| Asphalt Distributor Operator | $11.45 | $0.00 | $11.45 | 11/09/2011 | SUTX2005-006 |
| Air Tool Operator | $9.98 | $0.00 | $9.98 | 11/09/2011 | SUTX2005-006 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.