Wage determination TX20260148, modification 1
Effective May 18, 2026. Covers 1 Texas county for Building work, with 19 rate lines. Base rates run $8.50–$21.33 and fringe $0.00–$4.87 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Texas are governed by the state's own schedule, which is a separate set of rates — see Texas rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | TX20260148 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Building |
| Counties | 1 |
| Rate lines | 19 |
| Other Texas determinations | 289 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Truck Driver | $10.68 | $0.34 | $11.02 | 04/20/2009 | SUTX2009-035 |
| Tile Setter | $15.00 | $0.00 | $15.00 | 04/20/2009 | SUTX2009-035 |
| Sheet Metal Worker | $17.00 | $0.00 | $17.00 | 04/20/2009 | SUTX2009-035 |
| Roofer | $13.64 | $1.80 | $15.44 | 04/20/2009 | SUTX2009-035 |
| Painter | $11.75 | $0.00 | $11.75 | 04/20/2009 | SUTX2009-035 |
| Operator | $10.54 | $0.00 | $10.54 | 04/20/2009 | SUTX2009-035 |
| Operator | $14.58 | $0.00 | $14.58 | 04/20/2009 | SUTX2009-035 |
| Operator | $21.33 | $0.00 | $21.33 | 04/20/2009 | SUTX2009-035 |
| Operator | $13.00 | $0.35 | $13.35 | 04/20/2009 | SUTX2009-035 |
| Operator | $14.67 | $0.47 | $15.14 | 04/20/2009 | SUTX2009-035 |
| Laborer | $12.00 | $0.00 | $12.00 | 04/20/2009 | SUTX2009-035 |
| Laborer | $12.02 | $0.00 | $12.02 | 04/20/2009 | SUTX2009-035 |
| Laborer | $8.50 | $0.22 | $8.72 | 04/20/2009 | SUTX2009-035 |
| Laborer | $9.24 | $0.00 | $9.24 | 04/20/2009 | SUTX2009-035 |
| Electrician | $18.06 | $4.87 | $22.93 | 04/20/2009 | SUTX2009-035 |
| Drywall Hanger | $13.89 | $1.00 | $14.89 | 04/20/2009 | SUTX2009-035 |
| Cement Mason/concrete Finisher | $12.09 | $0.00 | $12.09 | 04/20/2009 | SUTX2009-035 |
| Carpenter, Includes Acoustical Ceiling Installation, Batt… | $15.13 | $2.63 | $17.76 | 04/20/2009 | SUTX2009-035 |
| Bricklayer | $18.00 | $0.00 | $18.00 | 04/20/2009 | SUTX2009-035 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.