Effective May 18, 2026. Covers 6 Texas counties for Highway work, with 35 rate lines. Base rates run $14.59–$34.20 and fringe $0.00–$0.00 across the classifications listed.
What this determination covers
This is a federal Davis-Bacon determination published on SAM.gov. It applies to federally funded or assisted construction in the counties listed below, for the construction types shown. State-funded public works in Texas are governed by the state's own schedule, which is a separate set of rates — see Texas rates.
The contract controls: if the contract names this determination with a different modification, that version governs, even when a newer determination exists. Copy the number and the modification into field 5 of the WH-347.
| Attribute | Value |
|---|---|
| Determination | TX20260296 |
| Modification | 1 |
| Effective | May 18, 2026 |
| Construction types | Highway |
| Counties | 6 |
| Rate lines | 35 |
| Other Texas determinations | 289 active in this state → |
Rate table
Every classification the determination lists, with the basic hourly rate, the fringe rate and the total package. Overtime is 1.5× the basic hourly rate; fringe is not multiplied. A row marked per day is a daily rate rather than an hourly one.
| Classification | Base rate | Fringe | Total | Effective | Code |
|---|---|---|---|---|---|
| Work Zone Barricade Servicer | $17.52 | $0.00 | $17.52 | 11/15/2023 | SATX2025-010 |
| Truck Driver, Tandem Axle Tractor With Semi Trailer | $22.08 | $0.00 | $22.08 | 11/15/2023 | SATX2025-010 |
| Truck Driver, Single Or Tandem Axle Dump Truck | $20.30 | $0.00 | $20.30 | 11/15/2023 | SATX2025-010 |
| Truck Driver, Single Axle | $17.99 | $0.00 | $17.99 | 11/15/2023 | SATX2025-010 |
| Truck Driver Lowboy Float | $22.90 | $0.00 | $22.90 | 11/15/2023 | SATX2025-010 |
| Spreader Box Operator | $20.63 | $0.00 | $20.63 | 11/15/2023 | SATX2025-010 |
| Roller Operator, Other | $16.90 | $0.00 | $16.90 | 11/15/2023 | SATX2025-010 |
| Roller Operator, Asphalt | $17.27 | $0.00 | $17.27 | 11/15/2023 | SATX2025-010 |
| Reinforcing Steel Worker | $22.76 | $0.00 | $22.76 | 11/15/2023 | SATX2025-010 |
| Reclaimer/pulverizer Operator | $18.83 | $0.00 | $18.83 | 11/15/2023 | SATX2025-010 |
| Pipelayer | $19.40 | $0.00 | $19.40 | 11/15/2023 | SATX2025-010 |
| Painter, Structures | $27.93 | $0.00 | $27.93 | 11/15/2023 | SATX2025-010 |
| Motor Grader Operator, Rough | $23.06 | $0.00 | $23.06 | 11/15/2023 | SATX2025-010 |
| Motor Grader Operator, Fine Grade | $26.88 | $0.00 | $26.88 | 11/15/2023 | SATX2025-010 |
| Milling Machine Operator | $22.53 | $0.00 | $22.53 | 11/15/2023 | SATX2025-010 |
| Mechanic | $25.51 | $0.00 | $25.51 | 11/15/2023 | SATX2025-010 |
| Loader/backhoe Operator | $19.01 | $0.00 | $19.01 | 11/15/2023 | SATX2025-010 |
| Laborer, Utility | $18.42 | $0.00 | $18.42 | 11/15/2023 | SATX2025-010 |
| Laborer, Common | $16.63 | $0.00 | $16.63 | 11/15/2023 | SATX2025-010 |
| Front End Loader Operator, Over 3 Cy | $18.71 | $0.00 | $18.71 | 11/15/2023 | SATX2025-010 |
| Front End Loader Operator, 3 Cy Or Less | $18.80 | $0.00 | $18.80 | 11/15/2023 | SATX2025-010 |
| Form Setter, Paving & Curb | $18.16 | $0.00 | $18.16 | 11/15/2023 | SATX2025-010 |
| Form Builder/setter, Structures | $19.82 | $0.00 | $19.82 | 11/15/2023 | SATX2025-010 |
| Flagger | $14.59 | $0.00 | $14.59 | 11/15/2023 | SATX2025-010 |
| Excavator Operator, Over 50,000 Pounds | $22.05 | $0.00 | $22.05 | 11/15/2023 | SATX2025-010 |
| Excavator Operator, 50,000 Pounds Or Less | $19.69 | $0.00 | $19.69 | 11/15/2023 | SATX2025-010 |
| Crawler Tractor Operator | $23.23 | $0.00 | $23.23 | 11/15/2023 | SATX2025-010 |
| Crane Operator, Lattice Boom Over 80 Tons | $34.20 | $0.00 | $34.20 | 11/15/2023 | SATX2025-010 |
| Crane Operator, Hydraulic Over 80 Tons | $30.25 | $0.00 | $30.25 | 11/15/2023 | SATX2025-010 |
| Crane Operator, Hydraulic 80 Tons Or Less | $27.88 | $0.00 | $27.88 | 11/15/2023 | SATX2025-010 |
| Concrete Finisher, Paving And Structures | $21.16 | $0.00 | $21.16 | 11/15/2023 | SATX2025-010 |
| Broom Or Sweeper Operator | $16.63 | $0.00 | $16.63 | 11/15/2023 | SATX2025-010 |
| Asphalt Raker | $17.40 | $0.00 | $17.40 | 11/15/2023 | SATX2025-010 |
| Asphalt Paving Machine Operator | $19.14 | $0.00 | $19.14 | 11/15/2023 | SATX2025-010 |
| Asphalt Distributor Operator | $23.20 | $0.00 | $23.20 | 11/15/2023 | SATX2025-010 |
Counties covered
Each link opens the county lookup already set to this county and this determination.
Using it on a payroll
- Confirm the version. Take the modification from the contract, not from this page — this page shows the newest published modification.
- Match the classification, not the job title. A title the determination does not list is a rejection even at a higher rate.
- Split base and fringe. Show the basic rate in 6A, the plan credit in 6B and cash in lieu in 6C; omitting fringe is a shortfall, not a saving.
- Check the overtime clock. This state uses a forty-hour workweek test.
The field-by-field mapping is in the WH-347 guide.